Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Falconbridge's data highway

    By Lloyd F. Dunham

    "Crucial to the implementation of new computer-based information systems at Sudbury Operations of Falconbridge Limited was a data communications network that would take computing power to the various

    Jan 1, 1988

  • CIM
    Balancing Environmental Protection and Industry Sustainability: A Successful Case Study of the Lignite Mining Industry in India

    By B. Surender Mohan

    Mining lignite pollutes the environment and causes ecological damage if unattended. Being conscious of the importance of environmental resources for the well-being of the living system, the Neyveli Li

    Aug 1, 2013

  • CIM
    Resisting wear attack in oil sands mining and processing

    By R. Llewellyn

    "Wear damage is responsible for very high maintenance costs and significant production losses in the oil sands industry of northern Alberta.It affects all areas of operations and involves a panoply of

    Jan 1, 1997

  • CIM
    Mining Operations at Carol Project Iron Ore, Company of Canada

    By Engineering Staff

    In 1958, the Iron Ore Company of Canada decided to proceed with the Carol Project. The ore deposits in the area are part of the highly metamorphosed southern zone of the Labrador Trough. They lie alon

    Jan 1, 1962

  • CIM
    Techniques of inverse drop raise blasting and slot drilling

    "Mining with blast holes drilled upwards may be done to recover sill pillars, or for economic reasons when the distance between the levels is relatively large. If the rock is sufficiently competent to

    Jan 1, 2000

  • CIM
    Hauler Body Payload Balance (04e00105-6441-4904-be43-8981f7e8cd3c)

    By T. G. Joseph, A. Chamanara

    ABSTRACT: The chicken and egg scenario — where adverse truck motions cause ground deterioration and poor ground profiles cause adverse truck motions — is a downward deterioration spiral dominating our

    Jan 1, 2012

  • CIM
    Distributed control at the Kidd Creek grinding plant. Part I: Control strategy design

    By A. Desbiens, R. del Villar

    "This two-part paper summarizes the design and implementation of a distributed PIbased control strategy installed at the B grinding circuit, at the Kidd Creek Division of Falconbridge Ltd. Part I deta

    Jan 1, 1997

  • CIM
    Effect of Thermomechanical Treatment on Mechanical Properties of A6022/A7075/A6022 Aluminum Alloy Clad Sheets Fabricated by Roll Bonding Process

    By Yun-Soo Lee, Su-Hyeon Kim, Hyoung-Wook Kim, Joon-Hyeon Cha

    A7075 aluminum alloys have high strengths but poor corrosion resistance. In order to improve the corrosion resistance, a clad sheet is suggested, that is the A7075 alloy sheet bonded to A1XXX or A6XXX

    Jan 1, 2015

  • CIM
    Coal Mining and Geology in Canada

    By F. W. Gray

    Summarized Foreword This paper is one of a series arranged by Institute Divisional Committees for the Fiftieth Anniversary Meeting, reviewing the experience of the major mining and metallurgical in

    Jan 1, 1948

  • CIM
    Pitchblende Occurrences of the Goldfields Area, Saskatchewan

    By A. M. Christie

    Acknowledgements The following account has been compiled mainly from records and maps of Eldorado Mining and Refining (1944), Limited, hereinafter called the Crown Company. This work was done under

    Jan 1, 1949

  • CIM
    Minto Copper-Gold Project IOCG or What?

    Sherwood?s Minto Project ? High grade copper copper-gold deposit ? Yukon Territory, Canada ? Development underway ? Permitted ? Production by mid mid-2007 ? 40 40-50m lbs Cu plus Au/Ag by by-pr

    May 1, 2006

  • CIM
    Industrial rock and mineral development and opportunities in New Brunswick

    By Tim C. Webb

    For almost 350 years, industrial rocks and minerals have been produced, used locally and exported from New Brunswick to markets throughout the world. Up until the early 1960s, commodities like grindst

    Jan 1, 2001

  • CIM
    Microstructural Analysis of Electro-Spark Deposited Aerospace Superalloy

    By O. A. Ojo, E. Anisimov, A. K. Khan

    Electro-spark deposition (ESD) has recently generated a great deal of interest in processing aerospace materials. This is due to its potential for joining and repairing difficult-to-weld precipitation

    Jan 1, 2015

  • CIM
    Quality Assurance in Capital Projects, Opportunities and Challenges

    By Wilson Pascheto

    One of the main outcomes of a capital project is the reliability of a new plant, system or equipment. During 20 years of experience working in various capital projects for the mining industry, the aut

    Jan 1, 2015

  • CIM
    Leaching Behaviour of a Colombian Nickel Laterite in Aqueous Alkaline Glycine Solutions

    By G. T. Lapidus, A. Garcés, O. J. Restrepo

    "Colombian nickel laterites have historically been processed by pyrometallurgy. However, due to the depletion in ore grades, alternative processes are required. Hydrometallurgical processes, such as p

    Jan 1, 2017

  • CIM
    The Influence of Cold Work on Corrosion Resistance of Aluminum - Lithium Alloys

    By J. Mizera, J. Zdunek, K. J. Kurzydlowski, A. Dobkowska

    This work concerns comparison of corrosion resistance of the aircraft aluminum alloy composed of Al - 2.3%Li - 0.1% Zr. The alloy was hot rolled (HR) from 13 mm to a thickness of 4 mm (e = 2.4) and 1

    Jan 1, 2015

  • CIM
    The Application of the Heat Pump to the Mining Industry

    By James B. Templeton

    "IntroductionWith the steady rise of the cost of coal and freight, the time is now ripe for an investigation into the feasibility of using the heat pump for heating purposes in fairly remote industria

    Jan 1, 1950

  • CIM
    Corrosion Experiences 1n the Acid Leaching of Cobalt-Nickel Sulphides

    By R. B. McIntosh, S Ramanchuk

    A brief description is given of the process used by Sherritt Gordon Mines Limited to recover cobalt metal from nickel-cobalt sulphides. A description of the equipment with the operating conditions is

    Jan 1, 1961

  • CIM
    Underground Operations at the Dome Mines (9ecdfeb1-07a6-4c2d-8ca3-2b5b1b6c1ce4)

    By John B. Phillips

    The mine is entered by a central vertical shaft, strongly timbered, and containing two compartments-one for the passenger cage, the other for the large skips bringing the ore to the surface. A man-way

    Jan 1, 1926

  • CIM
    The early history of electrorefining in Canada

    By D. J. MacKinnon

    "The Canadian Copper Company, formed in 1885, began mining the nickel-copper ores of Sudbury in 1887 and producing nickel-copper matte from its smelter in 1888(1). Although it was quickly appreciated

    Jan 1, 1999