Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical ProjectBy Jan E. Nesset, Phillip J. Mackey
"Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain
Jan 1, 2003
-
Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines LimitedBy P. D. R. Maltby
"With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to
Jan 1, 1984
-
Stratified Sampling of Drill CoreBy Norman O. Lotter
Drill core is preferred as the sample material for metallurgical and mineralogical characterisation and flowsheeting of an orebody. The question arises as to how to do this at the economic optimum, si
Jan 1, 2010
-
Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air PurificationBy Hiroaki Sakurai
Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p
Oct 1, 2003
-
A First Step towards Gas Dispersion Management: Manipulation of Gas Distribution in Flotation CircuitsBy James A. Finch, Jason S. Doucet, Cesar O. Gomez
"Exercising control over the physical environment of flotation as a step towards process optimization is the driving force for characterizing gas dispersion in flotation cells, a subject of considerab
Jan 1, 2006
-
Process Development for Milling B-Zone Ore at Rabbit LakeBy S. Dicarlo
"In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia
Jan 1, 1988
-
From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona MillBy Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux
"The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur
Jan 1, 2013
-
Prospecting for Gold: Self-Assembly on Old CDsBy Hua-Zhong Yu
Gold is one of the most widely used substrate materials for self-assembly. Self-assembled monolayers (SAMs) prepared from alkanethiols and their derivatives on gold are the most reliable and well-stud
Oct 1, 2003
-
The Application of the Stackcell Technology for Fine Coal RecoveryBy E. S. Yan, R. Graley
"The StackCell was developed to overcome the engineering and design challenges that are commonly associated with existing flotation technology such as pneumatic, self-aspirating cells, mechanical cell
Jan 1, 2013
-
Applications of a Process Control Computer at Brenda Mines LimitedBy C. Larsen, E. Gratch, B. Flintoff, R. Bradburn
"In 1973 Brenda Mines Limited first investigated the potential use of a process computer to aid in the development of a control system for the concentrator grinding circuit. This initial study and its
Jan 1, 1978
-
Toppling failure — A proposed analytic solutionBy J. I. Mathis
"The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was
Jan 1, 2004
-
Alkaline Pressure Oxidation Barrick Mercur ExperienceBy P. T. O'Kane
"INTRODUCTION Wright Engineers Limited is active and has extensive experience in the design of pressure oxidation plants for the treatment of refractory gold ore and concentrate. In addition to the Me
Jan 1, 1989
-
A Review of Advanced Control Applications in Mineral ProcessingBy A. Vien, B. C. Flintoff, R. P. Edwards
"This paper provides a critical review of the development and application of advanced controls in mineral processing at the industrial level. These algorithms can be sub-divided into four broad catego
Jan 1, 1992
-
Geostatistical Determination of Production Uncertainty: Application to Pogo Gold ProjectBy J. A. McLennan
Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo
May 1, 2004
-
SMART ?ONE VOICE? Technology Standards in the Surface Mining Industry An Update -OEM & OTM SummitBackground Chronology 2008 Positions May 8, 2010 Summit Going Forward Say one thing and do another ??Genuine passion to see our customers succeed?, ?A passion for exceeding our customer?s exp
May 1, 2010
-
Millerite and Its Impact on Cu/Ni SeparationBy F. D. Ford, Z. Dai
"Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6
Jan 1, 2011
-
Comparison of the Material Properties of In situ and Laboratory Prepared Cemented Paste BackfillBy Kim Le Roux
Cemented paste backfill (CPB) is a relatively new material that is increasingly being used in open stope mining across the world. The advantages offered by this high density tailings backfill include:
May 1, 2002
-
A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery CurvesBy D. Hatfield
"Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting
Jan 1, 2013
-
Mill Operations - Lean and KeenBy P. R. Richardson
"Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,
Jan 1, 1988
-
Design Spans ? Underhand Cut and Fill MiningBy Rimas Pakalnis
This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r
Apr 1, 2005