Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines Limited

    By P. D. R. Maltby

    "With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to

    Jan 1, 1984

  • CIM
    Stratified Sampling of Drill Core

    By Norman O. Lotter

    Drill core is preferred as the sample material for metallurgical and mineralogical characterisation and flowsheeting of an orebody. The question arises as to how to do this at the economic optimum, si

    Jan 1, 2010

  • CIM
    Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air Purification

    By Hiroaki Sakurai

    Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p

    Oct 1, 2003

  • CIM
    A First Step towards Gas Dispersion Management: Manipulation of Gas Distribution in Flotation Circuits

    By James A. Finch, Jason S. Doucet, Cesar O. Gomez

    "Exercising control over the physical environment of flotation as a step towards process optimization is the driving force for characterizing gas dispersion in flotation cells, a subject of considerab

    Jan 1, 2006

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    Prospecting for Gold: Self-Assembly on Old CDs

    By Hua-Zhong Yu

    Gold is one of the most widely used substrate materials for self-assembly. Self-assembled monolayers (SAMs) prepared from alkanethiols and their derivatives on gold are the most reliable and well-stud

    Oct 1, 2003

  • CIM
    The Application of the Stackcell Technology for Fine Coal Recovery

    By E. S. Yan, R. Graley

    "The StackCell was developed to overcome the engineering and design challenges that are commonly associated with existing flotation technology such as pneumatic, self-aspirating cells, mechanical cell

    Jan 1, 2013

  • CIM
    Applications of a Process Control Computer at Brenda Mines Limited

    By C. Larsen, E. Gratch, B. Flintoff, R. Bradburn

    "In 1973 Brenda Mines Limited first investigated the potential use of a process computer to aid in the development of a control system for the concentrator grinding circuit. This initial study and its

    Jan 1, 1978

  • CIM
    Toppling failure — A proposed analytic solution

    By J. I. Mathis

    "The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was

    Jan 1, 2004

  • CIM
    Alkaline Pressure Oxidation Barrick Mercur Experience

    By P. T. O'Kane

    "INTRODUCTION Wright Engineers Limited is active and has extensive experience in the design of pressure oxidation plants for the treatment of refractory gold ore and concentrate. In addition to the Me

    Jan 1, 1989

  • CIM
    A Review of Advanced Control Applications in Mineral Processing

    By A. Vien, B. C. Flintoff, R. P. Edwards

    "This paper provides a critical review of the development and application of advanced controls in mineral processing at the industrial level. These algorithms can be sub-divided into four broad catego

    Jan 1, 1992

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    SMART ?ONE VOICE? Technology Standards in the Surface Mining Industry An Update -OEM & OTM Summit

    Background Chronology 2008 Positions May 8, 2010 Summit Going Forward Say one thing and do another ??Genuine passion to see our customers succeed?, ?A passion for exceeding our customer?s exp

    May 1, 2010

  • CIM
    Millerite and Its Impact on Cu/Ni Separation

    By F. D. Ford, Z. Dai

    "Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6

    Jan 1, 2011

  • CIM
    Comparison of the Material Properties of In situ and Laboratory Prepared Cemented Paste Backfill

    By Kim Le Roux

    Cemented paste backfill (CPB) is a relatively new material that is increasingly being used in open stope mining across the world. The advantages offered by this high density tailings backfill include:

    May 1, 2002

  • CIM
    A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves

    By D. Hatfield

    "Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting

    Jan 1, 2013

  • CIM
    Mill Operations - Lean and Keen

    By P. R. Richardson

    "Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,

    Jan 1, 1988

  • CIM
    Design Spans ? Underhand Cut and Fill Mining

    By Rimas Pakalnis

    This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r

    Apr 1, 2005