The Path to Best Practice at Geita Gold MineBy M Monaghan, B S. Gregory
The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I
Sep 18, 2012
-
Pillar Recovery Adjacent to Stabilised Rock Fill at the Ballarat Gold ProjectBy D P. Sainsbury, J Western, B L. Sainsbury, V Mutton, P E. Petrie
Remnant rib pillars at Castlemaine Goldfields Ltd’s Ballarat Gold Project have been sterilised by the placement of loose rock fill in production stopes. The application of selectively injecting low-vi
Nov 5, 2014
-
Knelson Continuous Variable Discharge Concentrator: Analysis of Operating VariablesBy I Grewal, B Klein
The Knelson Continuous Variable Discharge (CVD) is a continuous centrifugal gravity concentrator for high-mass yield recovery applications. It has four operating variables that enable control of mass
Jan 1, 2001
-
Flotation launder design and the measurement of critical froth transport parametersBy B Wong, R G. Coleman
In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const
Aug 29, 2018
-
Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)By D Horacek, I K. Sheppard
Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in
Jan 1, 2007
-
Remnants of Ancient Australia in Vanuatu – Implications for South-west Pacific Tectonics and Mineralisation PotentialBy S W. Richards, J Buys
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Magmatic arcs are prime targets for porphyry- and epithermal-style mineral deposits, althou
Mar 18, 2015
-
Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water QualityBy N Taylor, P Hewitt
The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet
Sep 17, 2014
-
Advanced Mill Relining - A Key Operational Control (Not Simply a 'Must Do' Maintenance Function)RME has a vision for a new grinding plant operational paradigm made possible by RMEÆs fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill volume lo
Jan 1, 2007
-
Integrated Photogrammetry and Discrete Fracture Network Modelling for Improved Rock Mass Characterisation and Engineering DesignBy S F. Rogers, P W. Booth
Digital photogrammetry is revolutionising the task of geotechnical mapping of jointed rock masses and has greatly increased in popularity and sophistication in recent years. Modern commercially availa
Sep 17, 2014
-
Reconciliation of Orebody Model Predictions – System and PeopleBy T Burns, P Savory
In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data
Aug 18, 2014
-
A Phased Approach to Test Programs to Meet Feasibility Study RequirementsBy E Williams
The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re
Oct 5, 2011
-
Strategic short-term geotechnical designBy K T. Mandisodza, T J. Cartledge
The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d
Jun 22, 2022
-
Recent Advances in Geophysical ToolsThis paper reviews recent advances in geophysical tools for mineral exploration. It does not restrict comments to methods which are usually applied in the tectonically active belt surrounding the Paci
Jan 1, 2004
-
Getting the Most out of Technology to Drive Mine Productivity ImprovementsBy K Sommerville, J Parkinson
"Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c
Nov 15, 2016
-
CIP ù Who Needs It? A Combination Circuit of Gravity, Flotation and Intensive Leach May Provide the Optimal Environmental and Cost Outcome for Gold Plants ù Stage II ù ResultsBy A McCallum, J Abols, G Patrick, G Johansen
The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold proc
Jan 1, 2004
-
Integrated Communications for Surface and Open Pit ApplicationsBy G Booth
Whilst communications systems in the mining industry have evolved over the years, the premise remains consistent that reliable communication is vital for safety and operational efficiency. TodayÆs ope
Jan 1, 2008
-
A Great Project Team - Bringing Together Location and CultureBy A M. Ebbels, D Pratt
The current commodities super-cycle has seen an explosion in the number of mining projects demanding human resources throughout the world. The demand for key personnel currently far outweighs the inte
May 24, 2012
-
Be Open to Closure - It Can Save You MoneyBy J Heyes
Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi
Jan 1, 2009
-
Benefits of Advanced Technology in Underground MiningBy M Edhammer
In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants
Mar 21, 2011
-
ROES® – Automated Rock ExtractionBy I Gipps
A vision of what the future mine involves all aspects of mining, ie orebody access, ore stoping, material transport, processing and waste material disposal. This paper examines one aspect of the futur
Nov 22, 2011