Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Orepass Monitoring and Management at Olympic Dam MineBy J Rose, D O’Toole, D Grant
Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed
May 9, 2016
-
Modelling Blast Movement for Grade ControlBy O Handayani, R Barr, E Isaaks
The mining industry has focused a great deal of attention recently on the impact of blast movement on grade control. Although the problem of blast movement and its contribution to dilution and ore los
Aug 18, 2014
-
Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in AustraliaDuring 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component
Nov 25, 2010
-
Effectively Installing and Commissioning Flotation EquipmentBy B Murphy, J L. Heath
Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th
Sep 1, 2014
-
Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case StudyBy I Elias, E Moya, S Chaffer
This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage
Jul 13, 2015
-
How to Create a Perfect StormBy A Chadwick, J de Ross, C Adams
Imagine a æshinyÆ new mine, $1 B in the bank and record commodity prices. So how does a company and its management team create enough tension to maximise profit and to establish a culture that can wea
Nov 20, 2012
-
Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South AfricaBy R Moller
Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt
Jan 1, 2005
-
Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow TestsTraditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel
Jul 1, 2013
-
Space mining – managing astronomical complexityBy D Brown, K Markovic, Z Tabor
From ancient times to the modern world, the mining industry has played a pivotal role in shaping the society that we live in today. It remains an integral part of everyday life and is a catalyst for b
Sep 1, 2024
-
Drill hole spacing analysis for classification and cost optimisation – a critical review of techniquesBy J Levett, O Rondon, I Glacken
Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl
May 24, 2023
-
New Materials Technology Applied in Longwall MiningCoal slurry pumping was introduced into the U.K. in 1973. Gateside packs were prepared in areas of containment using R.O.M. coal and a special fast setting cement. The packs restricted roadway con
Jan 1, 1986
-
Can We Stop a Black Swan Breeding? Advances in Bowties and Critical Control ManagementBy M Andrew, H Reynolds, R Mills
As the global mining industry continues to grapple with ‘black swans’ (high consequence / low frequency events) for health, safety and environmental losses, the focus is shifting from risk assessment
Jun 22, 2016
-
Incorporating Sustainability into Mining Plant and Infrastructure DesignBy A Murphy
Mining plants and infrastructure, and the decisions made by their designers, can have large impacts on their environmental and social context, commonly referred to as the site or plant footprint. They
Jul 16, 2014
-
Raisebore drill string recovery case studyBy M Andrew, D McTiffen, M Adams
A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th
Mar 15, 2021
-
Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto WayBy G Danckert
The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat
Jul 11, 2011
-
Is Perception Reality? Evaluating the Fiscal Attractiveness of International Jurisdictions for Gold Mining InvestmentBy J P. Sykes, C Gemell, A Trench
The perceived and actual impact of government mineral policy upon the government share from gold mining revenues is assessed for ten key countries in which the gold sector is of relevance in advancing
Jun 22, 2016
-
Linking Mineral Resource and Ore Reserve classification with technoeconomic study levels and forecast relative accuracyBy D Reid, J McKibben, M Noppe
International mineral disclosure standards and guidelines aligned with the CRIRSCO (Committee for Mineral Reserves International Reporting Standards) template were developed to inform stakeholders abo
Mar 22, 2022
-
Mass Transfer Problems in Mine Ventilation: Some Solution StrategiesBy Ramani R. V
There are many important physical phenomena in mine ventilation which involve transient mass and heat transfer processes. These processes have been modeled using differential equations often solve
Jan 1, 1988
-
The Geology of the Wilber Deposit, Andy Well Gold Project, Murchison District, Western AustraliaBy T Wellman, G Sternadt, R Hingston
The 335 000 oz Wilber Deposit is located within the Meekatharra-Wydgee Archaean greenstone belt in the Murchison District of Western Australia. The deposit comprises high-grade gold mineralisation hos
Aug 18, 2014
-
Learning from and managing a significant saprolite instabilityBy M Bouare, C Holland, K N’Diaye
Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant
Jun 22, 2022