Search Documents

  • CIM
    Cyanide Destruction at Western Mines, Myra Falls Operations

    By A. G. Eccles

    "INTRODUCTIONWestern Mines' copper-lead-zinc operations are located in Strathcona Provincial Park, near the geographic centre of Vancouver Island. This park includes Buttle Lake, which flows into the

    Jan 1, 1977

  • SME
    Mining And Marketing Altered Volcanic Tuff At The Heart Of Nature?s Alum/Sulfur Mine

    By John Heter

    An alum/sulfur deposit (USDA organic registered) was mined underground for alunite (K,Na) Al3 (SO4)2 (OH)6 from the early 1900s to the 1930s. It is now being mined as an open pit quarry. A larger as

    Jan 1, 2008

  • AIME
  • SAIMM
    Uncertainty in Rock Mechanics and Rock Engineering—Then and Now

    By H. H. Einstein

    This paper reviews how uncertainty has been dealt with over the past 40 years using the decision making cycle as a frame of reference. The review of the phases of this cycle, as applied to rockmechani

    Jan 1, 2003

  • NIOSH
    IC 8181 Open-Pit Iron Mining, Milling, And Costs, Groveland Mine, The Hanna Mining Co., Dickinson County, Mich.

    By Leonard F. Heising

    At the Groveland-mine iron ore is mined by open-pit methods and concentrated by means of spirals and flotation. A brief history of the mine and its early development is given. The ore deposit is d

    Jan 1, 1963

  • NIOSH
    OFR-34-82 Full Scale Model Roof-Bolt Test System - 2. Introduction

    The Full Scale Model Roof Bolt Test System described herein was designed, fabricated, erected, and installed by MSA Advanced Systems Division for the U. S. Department of Interior, Bureau of Mines, Sp

    Jan 1, 1979

  • AUSIMM
    Thickener Modelling - Incorporating Shear Effects

    Thickener Modelling - Incorporating Shear Effects

    Sep 13, 2010

  • NIOSH
    OFR-56-77 Personal N02 Sampler System Demonstration

    By Frederick C. Tompkins

    A complete service system was established for the monitoring of personnel exposure to N02 based upon the use of passive dosimetry. This system is structured such that minimum effort is required of the

    Jan 1, 1976

  • SME
    Assessing The Uncertainty Due To Grades And Grade Shell Limits For The West Leeville Underground Deposit

    By C. Deutsch

    Resource estimation for the West Leeville deposit is prepared using a conventional explicit approach. The geologic model is developed using interpretive methods based on visual logging. Grade shells

    Jan 1, 2007

  • NIOSH
    OFR-8-74 Coal Mine Combustion Products Identification And Analysis - 1.0 Abstract And Summary

    By K. L. Paciorek

    The aim of the present study is to determine on a gram per gram basis the toxic products of the thermal oxidative degradations of selected compositions. Four families of materials were investigated un

    Jan 1, 1973

  • NIOSH
    RI 3467 Time Study Analyses - Progress Report 2. Quarry Haulage - Introduction

    By J. R. Thoenen

    In the summer of 1937 the authors began a series of time studies of the various processes employed in the' production of crushed stone. These studies, made at quarries scattered over the eastern

    Jan 1, 1939

  • SME
    Technical Note - Borealis Project: A Fast-Track Approach to Mine Development

    By W. E. Coughlin, R. L. Faverty, F. H. Lightner

    Introduction The intent of this paper is to present the general strategy and method of implementation to achieve a "fast-track" mine development. The major objectives of a "fast-track" or rapid devel

    Jan 11, 1983

  • NIOSH
    RI 3607 Survey Of Fuel Consumption At Refineries In 1940 ? Summary (f1efc389-e9c3-4eba-8963-f97bc5925e7a)

    By G. R. Hopkins

    The average heat requirement per barrel of crude processed in the United states rose from 555,000 B. t. u. in 1939 to 579,000 B. t. u. in 1940, although crude runs increased from 1,237,840,000 barrels

    Jan 1, 1942

  • NIOSH
    RI 3615 Analysis Of Power Consumption At Coal Mines - 1. Preliminary Study ? Introduction (1f54ba71-4451-444f-bdbf-69c9bdcc0c89)

    By F. A. Jones

    Increased mechanization .of coal mines has emphasized the need for study of actual power requirements of the various machines employed in the production of coal and losses in the distribution of power

    Jan 1, 1942

  • AUSIMM
    A Case Study on the Impact of Hedging Against Foreign Exchange Risk and Energy Price Risk

    By A A. Ndiaye, A Galli

    In a companion paper on current hedging practices in the mining industry (Armstrong et al, 2009) we showed that contrary to popular belief, mining groups are still using financial derivatives to hedge

    Jan 1, 2009

  • AUSIMM
    Intrusion-Alteration-Mineralisation Relationships in the Frieda River Igneous Complex, PNG

    By R Handfield, G Kary, Frieda Project

    Recent exploration by the Cyprus Amax-Highlands Pacific-OMRD Joint Venture at the Frieda River project, PNG has demonstrated the extent of igneous phases, alteration and mineralisation, and the relati

    Jan 1, 1999

  • NIOSH
    RI 3453 Relative Air Dustiness During Cycle Of Operations At Mount Weather Testing Adit ? Introduction

    By John A. Johnson

    For the purpose of comparing the amounts of dust produced by various mining operations, samples of atmospheric dust were collected during a complete cycle of drilling, blasting and mucking at or near

    Jan 1, 1939

  • SME
    Wetting Phenomena In Oil Sand Systems And Their Impact On The Water-Based Bitumen Extraction Process

    By J. Drelich

    The highly-efficient and economically-feasible technology for bitumen recovery from US oil sands using a water extraction approach was developed at the end of the last century. This water-based bitume

    Jan 1, 2007

  • SAIMM
    Freeze Lining On M12 Furnace: Motivation, Installation And Operation

    By A. M. Hearn, J. R. Henning, A. S. J. Van Rensburg

    The lining, together with the electrodes, forms the heart of the operation of a submerged arc furnace. Subsequent to a lining failure on M12 furnace during the early 1980s, Metalloys was active in in

    Jan 1, 2004

  • IIMP
    Automatización de la planta concentradora de BHPBilliton Tintaya S. A.

    By Valentín Choquenaira Bombilla

    El presente trabajo describe el proceso de automatización de la planta concentradora BHPBilliton deTintaya desde el punto de vista del usuario final y así proporcionar una visión global sobre los asp

    Sep 12, 2005