Search Documents

  • AUSIMM
    The Experimental Extraction of Copper from Ukaparinga Copper Ore

    By Osetzky D, Hesp W. R

    The treatment of a hydrobiotite containing 0·64 per cent copper with various soluHons showed that a high percentage (up to 90 per cent) of the copper can be extracted under mild conditions (1 M B

    Jan 1, 1977

  • ISEE
    Demolition of the Milwaukee Railroad Trestle Pier, Lind, WA

    By William C. B. Gates

    Demolition blasting next to an active railroad can be very challenging because of track safety, blasting vibrations, potential track fouling by blast debris, and short work windows on a live track. Re

    Jan 1, 2016

  • NIOSH
    IC 8745 Underground Mine Communications (In Four Parts) 4. Section-To-Place Communications (aa3134a4-8847-4c1e-a98e-b8bf7ce2479a)

    This Bureau of Hines report on underground mine communications addresses methods and equipment to meet the communication requirements of working sections and places of coal and metal-nonmetal mines. A

    Jan 1, 1977

  • SME
    Design of Rock Shafts Adjacent to Heavily Loaded Columns

    By Nikolas K. Sokol

    Underground construction often requires working within a very congested urban environment, including excavating shafts adjacent to highly sensitive and multistoried structures, sometimes even within s

    Jan 1, 2008

  • AUSIMM
    Common pitfalls in sampling iron ore

    By R J. Holmes

    The procedures and equipment used for sampling iron ore process streams have generally improved in recent years. However, there are a number of areas where significant issues still commonly occur, inc

    May 9, 2017

  • NIOSH
    RI 9332 - Evaluation of Ultrasonic Measurement Systems for Bolt Load Determinations

    By Stephen C. Tadolini

    The U.S. Bureau of Mines has developed ultrasonic measurement instrumentation capable of measuring strains and elongations on tensioned and untensioned mine roof bolting systems. This report evaluates

    Jan 1, 1990

  • AUSIMM
    Investigation on Comprehensive Utilisation of Nickel Slag from JNMC

    Investigation on Comprehensive Utilisation of Nickel Slag from JNMC

    Sep 13, 2010

  • SME-ICGCM
    The Investigation Of The Rock Mass Stressed-Deformed State Under The Conditions Of Floating Earth Presence In The Roof Of The Level Working

    By V. Bondarenko

    The forecasting of floating earth inrush into the working is to a great extent connected with the investigation of the rock mass stressed-deformed state around the working. The aim of such investigati

    Jan 1, 1996

  • AIME
    Identity crisis in the copper industry

    By Joklik, G. F.

    Most publicity about the copper industry nowadays is focused on the adequacy of ore reserves and on excessive mining capacity. These concerns, stemming from public awareness of actual and potential sh

    Jan 1, 1978

  • AUSIMM
    Grasberg Block Cave Haulage Project – Design and Construction Update

    By B Mead, N D. Pascoe

    The Grasberg block cave rail haulage system will be located in the Grasberg mining district on the island of Papua, Indonesia at an elevation of almost 3000 m above sea level. It will transport 160 00

    May 9, 2016

  • DFI
    In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?

    By Richard W. Hanford

    The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an

    Jan 1, 2001

  • SME
    Assessment Of Parameters Influence The Extraction Method Selection For The Dimension Stone Quarries

    By E. Bakhtavar

    All parameters influencing the decision for selection of a suitable extraction method were first selected as the base of this study. Then these parameters were categorized in two main groups. The firs

    Jan 1, 2012

  • CIM
    La Ville de Fermont

    By Paul J. Bourassa

    Alin de pourvoir aux besoins d'hébergement des quel¬ques 1600 employes qui travailleront dans toutes les spheres opérationnelles de l'exploitation du gisement du Mont-Wright, ainsi que de le

    Jan 1, 1977

  • AUSIMM
    Proper Tyre Management Reduces Tyre Costs (8cc3f990-94b6-4b55-8abb-8c65d8f8d45b)

    By Gordon DM

    Tyres account for 25-30 per cent of the operating costs of large capacity haul units as used in open-cut mines.Tyre operating costs can be substantially reduced and often contained in real terms by ap

    Jan 1, 1983

  • AUSIMM
    DRI - An Alternative Amongst Many

    A laboratory size solvent extraction apparatus has been constructed, which incorp- orates three stages of countercurrent extraction, followed by two stages of counter- current stripping. The model u

    Jan 1, 1999

  • AUSIMM
    The Geology of the Chinaman Creek Disseminated Copper Prospect, Near Mount Perry, South-East Queensland

    Copper mineralization associated with minor molybdenum, silver, and gold occurs in a hydrothermally altered brecda within a granodiorite mass of Upper Permian age. A dyke system of rhyolite, dacite, a

    Jan 1, 1972

  • NIOSH
    OFR-66-79 Development And Fabrication Of A Prototype Fibrous Aerosol Monitor (FAM)

    By Pedro Lilienfeld

    This report describes a program whose objective was to develop, design, fabricate and laboratory-test two prototype instruments capable of real-time selective detection and measurement of airborne fib

    Jan 1, 1977

  • AUSIMM
    Presidential Address

    In referring to two subjects of interest to the Members of this Australasian Institute of Mining Engineers, I would at the outset desire to express our gratification that to-day we are able to welcome

    Jan 1, 1901

  • SME
    Effectiveness Of Pennsylvania’s Remining Program In Abating Abandoned Mine Drainage: Part 2 - Efficacy Of Best Management Practices

    By J. W. Hawkins, K. B. C. Brady, K. Miller, J. Cuddeback

    Remining of abandoned coal mines in Pennsylvania requires the implementation of pollution abatement and mining techniques called Best Management Practices (BMPs). Water-quality data from over 100 remi

    Jan 1, 2002

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007