Search Documents

  • SME
    Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023

    By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu

    The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo

    Jun 13, 2023

  • SME
    Warm Springs Ponds: Superfund Success

    By Harry E. Hughes

    A section of the largest Superfund site in the country has become a success story for engineering innovation and for cooperative problem solving. “Superfund site” and “success story” are phrases that

    Jan 1, 1996

  • SAIMM
    Analytical Hierarchy Process For Selection Of Roadheaders

    By O. Acaroglu

    Selection of the most suitable roadheaders (boom type tunnelling machines) for the galleries/tunnels to be excavated in certain rock and under known project conditions is important for avoiding proble

    Jan 1, 2006

  • DFI
    Reconstruction Of Hudson River Pier 86 - Home Of The USS Intrepid Aircraft Carrier

    By Michael Quadagno

    Hudson River Pier 86, home of the historic USS Intrepid Aircraft Carrier and the Intrepid Sea-Air-Space Museum, is currently undergoing a $30M reconstruction. This project involves the demolition of t

    Jan 1, 2008

  • SME
    Formal Assessment and Measurement of Data Utilization and Value for Mines Mining, Metallurgy and Exploration

    By M. Mustafa Kahraman, Sean Dessureault, W. Pratt Rogers

    Most contemporary mines have considerable amounts of data. Structured and unstructured large data sets are colloquially named big data. Much of the data in mining operations come from a variety of sys

  • DFI
    Drilled Pier Foundations In Expansive Soils ? Synopsis

    By F. H. Chen

    the Rocky Mountain Region since 1950, drilled pier foundations have been widely used to combat structural movement problems in expansive soils. It is now an accepted practice for engineers to use dri

    Jan 1, 2010

  • SME-ICGCM
    Optimizing Secondary Tailgate Support Selection

    A model was developed to facilitate secondary tailgate support selection based on analysis of over 100 case studies, compiled from two different surveys of operating longwall coal mines in the United

    Jan 1, 1996

  • AIME
    Development in the Size and Shape of Blast-Furnaces in the Lehigh Valley, as Shown by the Furnaces at- the Glendon Iron Works

    By FRANK FIRRISTONE

    Ix the summer of 1842 my father, William Firmstone, was engaged by Charles Jackson, Jr., of Boston, to examine the conditions in the Lehigh valley as a site for blast-furnaces using anthracite for fue

    Sep 1, 1909

  • DFI
    A Case Study of Wet Soil Mixing for Bearing Capacity Improvement in Turkey

    By Arash Maghsoudloo, Asli Can

    "Abstract This paper presents a ground improvement implementation case under a raft foundation of a local hospital. The selected ground improvement method is Wet Soil Mixing (WSM) technique. Soil mixi

    Jan 1, 2014

  • IIMP
    Additives for construction market from zinc metallurgy tailing

    By Caio Moreira, Saulo De Rezende, Nelly Ruíz

    The present project sought alternatives for this material through the Mining Lab Beginnings program, which was developed by Nexa in partnership with Escalab to find solutions for the company's highly

    Sep 29, 2023

  • NIOSH
    IC 8654 The Bureau Of Mines Minerals Availability System And Resource Classification Manual

    This Information Circular describes the Bureau of Mines Minerals Availability System (MAS), presents the Resource Classification Manual used for information input to a computer file, and discusses the

    Jan 1, 1974

  • CIM
    Tailings Disposal at Kidd Creek Mines Ltd.

    By T. J. Yeomans

    "The Kidd Creek metallurgical site is situated twenty-six kilometres east of Timmins, Ontario. The site consists of a 4.5 niillion tonne per year concentrator, a 127,000 tonne per year electrolytic zi

    Jan 1, 1986

  • NIOSH
    RI 8859 - Safer Procedures for Removing Dragline Wire Rope Terminations

    By G. K. Derby

    The Bureau of Mines investigated methods for removing dragline bucket wire rope terminations with the objective of finding efficient methods that are safer than the method most commonly used at U.S. s

    Jan 1, 1984

  • AUSIMM
    Analyses of Some New Zealand Scheelites

    Analyses of scheelite from all the known scheelite fields in the South Island of New Zealand have shown that the scheelites are essentially molybdenum-free. The scheelites are almost stoichiometric Ca

    Jan 1, 1970

  • IOM3
    Risk in minerals project: analysis, perception and management

    Paper presented at the UK minerals industry conference and published in: Minerals extraction towards the millennium. UK minerals industry conference, 3-5 April 1995, University of Leeds. London: Insti

    Jun 19, 1905

  • CIM
    A New National Policy

    By C. M. Campbell

    IN 1902, a famous Canadian geologist made the following statement : ?'From what we know row of the iron-ore fields of the Province, we may feel that Ontario is assured of a great future as an iro

    Jan 1, 1937

  • NIOSH
    OFR-20-78 Demonstration Of Fire Suppression Systems On Underground Mining Equipment

    By Ferdinand Roehlich

    An evaluation of the use of manually activated, installed,. dry chemical fire protection systems on underground metal and nonmetal mine vehicles is described. In addition, an assessment of the possibl

    Jan 1, 1977

  • AIME
    Minerals Beneficiation - Study of Grinding-Ball Wear Employing a Radioactive-Tracer Technique

    By J. E. Campbell, A. W. Wesner, M. Pobereskin

    This paper summarizes the results of an investigation sponsored by The Coates Steel Products Company. The objective was to determine the relative effects of certain chemical and physical properties on

    Jan 1, 1961

  • AUSIMM
    Recycling and Recovering Fine Particles from Auto Shredding Residue (ASR/SR) to Conserve Raw Materials and Protect Environment

    Recycling and Recovering Fine Particles from Auto Shredding Residue (ASR/SR) to Conserve Raw Materials and Protect Environment

    Sep 13, 2010

  • CIM
    Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit

    By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi

    "Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the

    Jan 1, 2001