Search Documents

  • SME
    T& UC Tunnel Demand

    TABLE TUNNEL NAME OWNER LOCATION STATE TUNNEL USE LENGTH (FEET) WIDTH (FEET) BID YEAR STATUS Gateway Tunnel project Amtrak Newark NJ Subway 14,600 24.5 2015 Under study

    Sep 1, 2013

  • SME
    The Issue of Collecting and Reporting SD Indicators in the Minerals Sector from the Point of View of Small and Medium-Sized Companies and those not Publicly Traded

    By C. Sykes, E. Turner, M. Wyart-Remy

    This paper follows that of the Milos Conf, 2002 and examines the collection and reporting of SDIs in the industrial minerals industry in Europe. It compares the characteristics of the GRI Reporting Gu

    Jan 1, 2005

  • SME
    In-Mine Evaluation Of Smart Mine Fire Sensor (e0413569-6dc4-41a0-bd26-5c60fdfe0934)

    By R. A. Franks

    An evaluation of a nuisance-emissions-discriminating smart mine fire sensor system was made in an operating coal mine. These field evaluations were conducted to determine the sensor system?s ability

    Jan 1, 2008

  • AIME
    Preview Of The Practical Ones - Today's Answer To Tomorrow's Mining Equipment Problems

    By Wayne E. Tuomi

    The mining industry is faced with a pressing problem; that is, to develop more efficient methods of extraction, handling and upgrading-techniques that will do the job faster and better than ever befor

    Jan 3, 1967

  • SME
    Solvent Extraction Approach To Recover Boron From Wastewater Generated By The LCD Manufacturing Industry: Part 1

    By D. Mohapatra

    The possibility of using 2,2,4-trimethyl-1,3-pentanediol dissolved in tetrachloromethane as extractant for boron recovery is discussed. The parameters optimized for this purpose are contact time, boro

    Jan 1, 2008

  • AUSIMM
    Contacts

    This paper on the relation of Granite and Sedimentary Contacts to Victorian Mining will, it is hoped, be of interest to members of the Institute.The broad fact that gold often occurs' at or near

  • AUSIMM
    A Petrographic Basis for Classifying Australian Coals

    The proposed classification scheme is based on two primary parameters, one for petrographic composition and the other for rank, both being determined with microscopic techniques. The scheme has been a

    Jan 1, 1970

  • SAIMM
    A Review Of Optimal Planning Of Level And Raise Spacing In Inclined Narrow Reefs

    By C. Musingwini

    The subject of optimal planning of level and raise spacing for inclined narrow reef deposits has received intermittent attention over the years because the subject matter is inherently complex. Previo

    Jan 1, 2010

  • NIOSH
    RI 4427 Investigation Of Certain High-Alumina Clays Of Central Pennsylvania

    By Robert S. Sanford

    The demand for aluminum for military use during World War II called for an expansion of aluminum production in the United States A large part of the bauxite (the normal ore of aluminum) consumed in th

    Jan 1, 1949

  • SME
    Using the Modern Metric System

    By John Dasher

    In 1980, some US cars were designed and built to metric dimensions; wine and gas were sold by the liter; and the March of Dimes Walkathon was measured in kilometers. Although the US Congress has taken

    Jan 2, 1981

  • AIME
    Establishment of the Robert W. Hunt Medal

    By AIME AIME

    ON THE occasion of the eightieth birthday of Captain Robert W. Hunt, the Iron and Steel Committee of the Institute, desiring to commemorate the great contributions made to the steel industry by Captai

    Jan 1, 1920

  • SME
    Dynamic Gob Response and Reservoir Properties for Active Longwall Coal Mines

    By J. A. Marts

    Reservoir properties including porosity and permeability distributions in longwall coal mine gobs have direct application to modeling the flow patterns and gas distributions in the gobs. Proper assess

  • NIOSH
    IC 8204 Mining Methods And Costs, Mouat Mine, American Chrome Co., Still Water County, Mont. (92c1131e-e784-4994-8b74-2febee9dafcb)

    By Paul M. Price

    The Mouat mine, Nye, Mont., was reopened in 1953 by the American Chrome Co. under a Defense Minerals Production Administration contract. Operations were terminated in 1961 after completion of the cont

    Jan 1, 1963

  • DFI
    Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesive Soils

    By Mohammed Sakr

    This paper presents the results of a full-scale axial compression and tension (uplift) testing program executed on large-capacity helical piles installed in very stiff to very hard clay till soils (i.

    Jan 1, 2012

  • AUSIMM
    Taxonomy of Interactive Computer-Based Visualisation Systems and Content for the Mining Industry û Part One

    By C Caris, K Fowle, M Schmid, E van Wyk, D Schofield, A Squelch, M S. Kizil

    This paper has been written collaboratively by members of the International Mining VR Group. It is the first of a series of papers. Mining in the 21st century is a high technology industry that strive

    Jan 1, 2008

  • CIM
    The Interaction of Synthetic Chalcopyrite with Silver and Cupric Ions in Sulfuric Acid Solution

    By Ahmad Ghahreman, Lin Li

    Silver and cupric ions have been proven to play the roles of catalysts to promote the oxidation kinetics of chalcopyrite in acid solution. In this study, the interaction between silver ions and cupric

    Jan 1, 2019

  • NIOSH
    RI 9221 - Basic Parameters of Conveyor Belt Cleaning

    By C. A. Rhoades

    The spillage that accumulates under conveyor belt lines presents a possible fire and explosion hazard fomiinqjetsoruiel, especially to those who must clean up the spillage. The U.S. Bureau of Mines co

    Jan 1, 1989

  • AUSIMM
    The Mine Labour Problem-Wages, Contract or Tribute

    The labour question is one that has caused mine managers much thought and anxiety and is likely to continue to do so as long as human beings exist. The difficulty is to devise some arrangement whereby

    Jan 1, 1901

  • AUSIMM
    Development and Construction Update of the Grasberg Block Cave Mine

    By A T. Yuniar, C A. Brannon, N D. Pascoe, H H. Firdausi

    This paper describes the key components of the Grasberg Block Cave (GBC) mine design and the development and construction status of the mine. Drawpoint production from GBC will be initiated in 2018 fo

    May 9, 2016

  • NIOSH
    IC 6167 Mining Practice At Ray Mines, Nevada Consolidated Copper Co., Ray, Arizona - Introduction

    By Robert W. Thomas

    This paper describing the mining practices at the Ray mines at Ray, Arizona, is one of a series being prepared by the Bureau of Mines on mining practices, method and costs in the various mining distri

    Jan 1, 1929