Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Using Site Case Histories Of Multiple Seam Coal Mining To Advance Mine Design (a1a824d0-6082-498c-977a-2f43506db9fe)

    By John Ellenberger

    The nature of competition in the coal market tends to deplete the most favorable coal reserves first, and forces subsequent development of mines in more extreme ground conditions such as those associa

    Jan 1, 2003

  • SME-ICGCM
    Directional Rock Bolt Pullout Tests as Index Tests for Estimating Rock Mass Quality

    By Michael Alber

    Pullout tests on resin grouted rock bolts have been executed in coal mines and surface test sites. The goal of this study was to provide some qualitative information about the rock mass quality from m

    Jan 1, 2003

  • SME-ICGCM
    Strata Disturbance Prediction For Mining Beneath Surface Water And Waste Impoundments

    By Madan M. Singh

    Mining under bodies of water such as oceans, lakes, rivers, streams, ponds, and other impoundments, is not a new technique. However, in the United States it has been fairly restricted to date. In orde

    Jan 1, 1981

  • SME-ICGCM
    Investigation of Acoustic Emission Sensors for Ground Control Hazard Recognition in Underground Mines

    By Gary Buchan

    "Mine-wide ground control stability is essential to any mining operation to prevent catastrophic failure of underground structures. The ability to recognize or indicate the potential for ground contro

    Jan 1, 2018

  • SME-ICGCM
    The Failure Mechanism and Control Technology of Coal Wall of a Large Mining Height Panel

    By Dezhong Kong, Jaichen Wang, Shengli Yang

    "The stability control of longwall coal face is the key technology of large-cutting-height mining method. Therefore, a systematic study of the factors that affect coal face stability and its control t

    Jan 1, 2015

  • SME-ICGCM
    Site Characterization For Ultra-Close Multi-Seam Mining

    By Yingxin Zhou

    Data from these field studies and previous case study data have been combined to define ultra-dose seam mining environments and relate them to observed failure conditions. A rating system for ultra-cl

    Jan 1, 1990

  • SME-ICGCM
    Design Of The Ventilation Shaft In The South Link Railway Tunnel Construction, Taiwan

    By Jay Keng

    During the construction of shaft on the fractured and weak rock strata, the stability of construction plays an important role. This study includes earth stress estimation, support method, and stabi

    Jan 1, 1988

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    The Structural Response Of A Steel Lattice Transmission Tower To Mining-Related Ground Movements

    By Robert W. Bruhn

    A 125 foot high steel lattice frame tower supporting a 500 kV EHV transmission line and located over the gateroads of a longwall mining operation was subjected to ground movements from the mining of a

    Jan 1, 1990

  • SME-ICGCM
    Prediction of Inter-Strata Movements Above Longwall Faces (bade68bf-520f-401d-9d3a-43ba4395e61a)

    By Neil Styler

    This paper presents an analysis of measurements of inter-burden de- formations above six longwall faces. An attempt is made to demonstrate some correlation between the movements at the various sites,

    Jan 1, 1984

  • SME-ICGCM
    Mechanical Properties of Pizza Pans and Their Effectiveness in Underground Coal Mining

    By Brian Daniels, James Farroni

    "Draw rock (small rock that forms/falls when bolting the roof and/or rib) is the cause of numerous injuries annually. These injuries result in lost work hours and low morale. The report below explains

    Jan 1, 2010

  • SME-ICGCM
    The Impact Factors of Overburden Movement in Longwall Mining of Shallow Coal Seams

    By Yang Li

    For the study of overburden movement in longwall mining of shallow coal seams, most scholars merely consider the thickness of bedrock and top soils. In this paper, the overburden movement in longwall

    Jan 1, 2014

  • SME-ICGCM
    Performance Characteristics for Large Sections of Welded Wire Screen With Multiple Pull Patterns

    By Timothy J. Matthews, Timothy J. Batchler, Ted M. Klemetti

    "From 2011–2016, there were 1,511 documented injuries, including 7 fatalities, from ground falls in underground coal mines in the United States. The majority of these ground-fall injuries were not cau

    Jan 1, 2018

  • SME-ICGCM
    Numerical Model Simulation of a Development Pillar at a Steeply Dipping Underground Limestone Mine

    By Morgan M. Sears, Gamal Rashed, Jim Winfield, Brent Slaker

    "Over the past decade, ground falls have resulted in five fatalities, representing over 40% of all fatalities occurring in underground stone mines in the United States. In conjunction with recent high

    Jan 1, 2018

  • SME-ICGCM
    Stability Analysis of Shell Structure Around the Longwall Mining Face Area in Steeply Dipping Seam

    By Yongping Wu

    Taking the longwall mining face area in a steeply dipping seam as the research object, the stability of an asymmetrical rock mass structure is analyzed using shell theory and masonry beam theory. The

    Jan 1, 2013

  • SME-ICGCM
    Mitigation of a Massive Sandstone Channel's Impact on a 1,500 Ft Wide Longwall Face

    By Daniel W. Su

    This paper presents the implementation and evaluation of the hydraulic fracturing technique and Longwall Visual Analysis (LVA) software to mitigate the impact of a 1,000-ft (305-meter) widemassive san

    Jan 1, 2012

  • SME-ICGCM
    A Case Study of a Low Overburden Longwall Recovery with Pre?Developed Recovery Entries

    By John C. Stankus

    The 3 Right pre-developed longwall recovery entry at Signal Peak Energy?s Bull Mountain No. 1 mine was designed to prevent the abnormal roof conditions encountered in its firsttwo recovery entries. Un

    Jan 1, 2014

  • SME-ICGCM
    Field Measurements Of Overburden And Chain Pillar Response To Longwall Mining (22054dce-c5fa-459f-94f1-b6ef58bd87bf)

    By Daniel W. H. Su

    This paper presents the results of an extensive geomechanical testing and monitoring program conducted at a longwall panel. The field program included the monitoring of roof caving sequence and mechan

    Jan 1, 1987

  • SME-ICGCM
    The Massive Collapse Of Coal Pillars - Case Histories From The United States

    By Frank E. Chase

    A massive pillar collapse occurs when undersized pillars fail and rapidly shed their load to adjacent pillars which in turn fail. This chain reaction-like failure may involve hundreds, even thousands,

    Jan 1, 1994

  • SME-ICGCM
    Effect of High Horizontal Stress on Coal Mine Entry Intersection Stability

    By K. Hanna

    This manuscript describes an extensive ground control study at the Inland Steel No. 2 Mine near McLeansboro, IL, conducted by the U.S. Department of the Interior's Bureau of Mines (USEM) in coope

    Jan 1, 1986