Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Utilization Of Polymer Grid Structures In Shield Recovery Operations

    By Brian E. Travis

    Recent Developments in the utilization of polymer grid structures for Longwall Shield Recovery operations are discussed. Specifically: various Longwall screen designs and the numerous methods employed

    Jan 1, 1993

  • SME-ICGCM
    A Methodology for Fault Pre-Consolidation prior to Longwall Retreat: A Case Study from Kestrel Coal

    By Dion Pastars

    Kestrel Coal has undertaken a surface-to-seam consolidation program of faulted ground prior to longwall retreat in the 304 panel. Micro fine cement is used to improve the rock mass quality and the

    Jan 1, 2007

  • SME-ICGCM
    Roof Screening: Best Practices and Roof Bolting Machines (e5909744-6953-4a41-b02f-21226966b63f)

    By Susan Robertson

    Many injuries are caused each year by rock falls in coal mines. Most of these injuries are not caused by major roof collapses, but from falls of smaller rocks from the immediate top or roof skin. Vari

    Jan 1, 2002

  • SME-ICGCM
    Rock Reinforcement Longevity

    By Francis S. Kendorski

    Rock reinforcement has been in widespread use and generally has been accepted in underground mining and tunneling since the 1950s. The first rock reinforcement technologies employed were mechanical an

    Jan 1, 2000

  • SME-ICGCM
    Frictional Properties of Rock Applied to Mining Excavations

    Results of direct shear tests on rock discontinuities and triaxial compression tests on intact rocks are presented and - discussed. The main parameters considered area stress functions, angle of in

    Jan 1, 1987

  • SME-ICGCM
    Investigation of Electromagnetic Emissions in a Deep Underground Mine (0366ea57-3ba7-4a00-bec7-825a048e7e26)

    By Douglas Scott

    Highly stressed rock in stopes continues to be a primary safety risk for miners in underground mines because it can result in failures of ground that lead to both injuries and death. Spokane Research

    Jan 1, 2004

  • SME-ICGCM
    Load Deformation Behavior Of Simulated Longwall Gob Material

    By Deno M. Pappas

    The purpose of this U.S. Bureau of Mines study was to determine the material stiffness properties of the gob for use in numerical models of rock mass response to longwall mining. Photographs of actual

    Jan 1, 1993

  • SME-ICGCM
    Assessment Of Underground Structural Design

    By Eugene D. Krupa

    Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is

    Jan 1, 1990

  • SME-ICGCM
    Subsidence Prediction In Illinois Coal Basin

    By Ed D. Doney

    Based on the subsidence data collected through a comprehensive subsidence monitoring program con: ducted over two longwall panels in an Illinois coal mine, mathematical models have been proposed for p

    Jan 1, 1990

  • SME-ICGCM
    Improving Roof Control At A South African Coal Mine

    By Alan Bugden

    Goedehoop Colliery produces 8 million tonnes of coal a year, principally from room and pillar mining, and is situated in the Witbank Coalfield in the Republic of South Africa. The mine has a long and

    Jan 1, 2001

  • SME-ICGCM
    Use Of Database In Ground Control To Identify Weightings And Water Inflows

    By G. C. Xiao

    A database, incorporating historical data from British mines, to study the factors affecting inflows from proximate aquifers into longwall workings, showed that a main casual factor was the immediate

    Jan 1, 1990

  • SME-ICGCM
    Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography Software

    By Larry Stolarczyk

    A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A

    Jan 1, 2003

  • SME-ICGCM
    Field Measurements of Chain Pillar Response to Longwall Abutment Loads

    By Christopher Mark

    Current longwall pillar design methods are based on many assumptions about pillar and entry response to longwall abutment loads. Knowledge of the magnitude and time-of-arrival of abutment loads is ess

    Jan 1, 1986

  • SME-ICGCM
    The Effect Of Hazardous Geologic Structures On Gateroad Stability

    By Frank E. Chase

    Geologic structures have been responsible for numerous underground accidents and fatalities, and are a constant-source of down time. During - longwall mining, ground control problems associated with g

    Jan 1, 1990

  • SME-ICGCM
    Review Of Pillar Design Equations Including The Effects Of Constraint

    By C. Babcock

    This Bureau of Mines report considers some equations for mine pillar design from 1833 to the present. Most of the equations are of essentially the same kind, using pillar width to height relationships

    Jan 1, 1981

  • SME-ICGCM
    Discriminating Mining Induced Seismicity from Natural Tectonic Earthquakes in the Wasatch Plateau Region of Central Utah

    By Kristine L. Pankow, Keith D. Koper, Michael K. McCarter, Jared R. Stein

    "The Wasatch Plateau region of central Utah contains a number of active underground coal mines in an area of well-documented natural seismicity. As a result, there are several hundred seismic events r

    Jan 1, 2015

  • SME-ICGCM
    Analyses of De-Confinement Mechanisms of Unstable Failures in Underground Mining Conditions

    By Ruixiang Gu

    The de-confinement mechanisms of unstable failures as they occur in deep coal mining conditions are investigated using a distinct element numerical modeling code. The Mohr-Coulomb and continuously yie

    Jan 1, 2014

  • SME-ICGCM
    Premature Rock Bolt Failure Through Stress Corrosion Cracking (SCC)

    By Bruce Hebblewhite

    An ACARP-funded industry research project in Australia recently investigated the problem of premature rock bolt failures in underground coal mines. The project carried out limited sampling from 9 diff

    Jan 1, 2003

  • SME-ICGCM
    Pillar Design In Bump-Prone Deep Western U.S. Coal Mines (e849bf38-924c-4a19-8729-5910f69616a3)

    By N. P. Kripakov

    This paper presents a brief overview of current bump mechanics theories and pillar design methodologies, and relates these concepts to experiences at two mines located in a north-central Utah coalfiel

    Jan 1, 1992

  • SME-ICGCM
    Application Of DDM To Some Rock Pressure Problems In Japanese Deep Coal Mines

    By Yoshiaki Fujii

    Displacement Discontinuity Method (DDM), which was originally developed by Crouch,S.L., is a powerful tool to calculate mechanical disturbances due to tabular excavations. Three topics on DDM applicat

    Jan 1, 1992