Cutter Rescue By Borehole - Disaster AvoidedBy John J. Peregoy, James E. Downes
INTRODUCTION The U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) is being constructed to provide permanent storage of radioactive TRU waste materials emanating from military wea
Jan 1, 1989
-
Develop Specifications Before Selecting Heavy-Duty Apron FeedersBy Shular R. Scudamore
There was a time when heavy-duty apron feeders were built to last almost forever. The machines were heavy and built to maintain certain expected longevity and reliability. Increasing emphasis on retu
Jan 12, 1983
-
Ground Control Design For Highwall Mining (237c3f7a-5149-4dad-a860-b8b9ad20fedb)By R. Karl Zipf
Highwall mining is an important surface coal mining method, and it may account for approximately 4% of total U.S. coal production. Highwall stability is the major ground control related safety concer
Jan 1, 2005
-
1970s – SME Moves Headquarters From New YorkBy William M. Gleason
The war in Vietnam stretched into another decade, an American President was at the brink of impeachment, the earth was given its own day, twin tower monuments of American ingenuity were completed in N
Jan 1, 2007
-
Members Ready for Mining Industry Upswing at SME’s Annual MeetingBy Steve Kral
It seems that mining has been in the doldrums for awhile. Except for gold, metals prices remain depressed. And economic conditions in the United States and around the globe have put governments in a
Jan 1, 2003
-
Colorado School of Mines Education – What it is, Where it is HeadedBy John Trefny
Although mining is currently one of the smallest academic units on the Colorado School of Mines(CSM) campus, it is alive and well, with nearly 100 undergraduate and graduate students. For many yea
Jan 1, 2002
-
Mine Wide Protection For Miners, Equipment And InfrastructureBy W. H. Schiffbauer
The protection of miners, equipment, and infrastructure is discussed. While the primary focus of the described technology is to prevent miners from being injured, struck-by, or crushed by heavy equipm
Jan 1, 2011
-
Shaft Sinking on the MetroWest Water Supply Tunnel ProjectBy A. J. Stewart, M. Guay, J. W. Critchfield, A. P. Hoddeson
The MetroWest Water Supply Tunnel project includes three main work shafts, excavated primarily in rock. Shaft L is 9.8 m (32 ft) diameter and 124.1 m (407 ft)deep. Shaft E is 7.0 by 12.8 m (23 by 42 f
Jan 1, 1999
-
Optimising Collector Performance In The Production Of High Grade PGM Concentrates - Preprint 09-115By J. Wiese
Recently the operating philosophy at concentrators processing platinum bearing ores has started to move from a recovery dominated system to one in which the production of high grade concentrates at th
Jan 1, 2009
-
The Technology And Economic Incentives For Recovering Coal From Tailings ImpoundmentsBy A. S. Murphy, E. V. Manlapig, C. Green, J. W. Parkinson
Historically in Australia and the United States many coal mines deposited raw wash plant fines into large slurry impoundments. At the time the technology and market economics did not exist to make it
Jan 1, 2001
-
Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift MethodBy John F. MacDonald
This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp
Jan 1, 1985
-
Analysis of the Controlled Deformation in Rock and Soil (A.DE.CO.-RS)–Tunneling Approach Performance of an Alternate Tunneling Approach in the Construction of 100 Kilometers of Tunnel for the Bologna to Florence High Speed Rail LineBy Silvano Morelli, Giovanna Cassani, Renzo Bindi, Antonio Nicola
More than 70 km of main line and service tunnels have been excavated to date for crossing the Apennines between Bologna and Florence. A new design and construction approach, known as Analysis of t
Jan 1, 2003
-
Review Of Current Lime Calcining Technology ? IntroductionBy Whitmell J. Smithwick
Lime is one of the most extensively used chemicals in industry. Other than sulfuric acid, it is used in greater quantities than any other man-made industrial chemical. In 1974 there were 20,368,000 to
Jan 1, 1976
-
New tunnel boring machine accelerates tunnel construction in deep mining operationsBy Fred Delabbio, Sverker Hartwig
As openpit copper operations transition from surface mines to underground, the speed of underground infrastructure construction prior to production is critical for maximizing the value of the project.
Jul 1, 2010
-
Pilot-Scale Study Of Fluorite Beneficiation Using A Cyclonic Static Microbubble Flotation ColumnBy X. Zhou
In this study, the cyclonic static microbubble flotation column (FCSMC) was investigated for fluorite beneficiation. The structure and principle of the specially designed column are described. Fluorit
Jan 1, 2007
-
Batu Hijau: From Discovery to ProductionBy Thomas J. DeMull
Development of the Batu Hijau copper project was completed in the fourth quarter of 1999 with the formal handover and start-up of ore processing facilities. The project began in August 1996 when the
Jan 1, 2002
-
Rheological Behaviors In Wet Ultrafine Grinding Of LimestoneThis paper investigates the effects of solids concentration and the addition of Dispersant S40 on the flowability of original and ground limestone slurries. A rotational viscometer with a concentric c
Jan 1, 2007
-
Observations on the Prospectors and Developers Association ConferenceBy Bruce Geller
The 2004 Prospectors and Developers Association of Canada (PDAC) conference contained an air of optimism and excitement that has not been seen since 1997. Many segments of the mining industry are ali
Jan 1, 2004
-
Temperature Control On London Underground - Preprint 09-054By M. J. Gilbey
London Underground is the oldest and one of the deepest Metros in the world. The temperature of the Underground has been increasing over the last 100 years, mainly as a consequence of increases in tra
Jan 1, 2009
-
Second Manapouri Tailrace Tunnel Design and Construction ConsiderationsBy Brian Heer, David Young, Randall Essex
The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and
Jan 1, 1997