Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Upgrading Low Rank Coal Using The Koppelman Series C Process – Preprint 97-143

    By N. Merriam

    This report describes Koppelman's work to develop the K-Fuel® Series C Process used to dry and stabilize Powder River Basin coal. It also contains summaries of the results of bench-scale and pilo

    Feb 24, 1997

  • SME
    Mining Review (8ea836c9-6346-4229-805b-5f63a4114d3f)

    Minerals contribute to the U.S. gross domestic prod-uct (GDP) at several levels?mining, processing and manufacturing finished products. In 2008, the estimated growth rate for the real GDP of the Unite

    Jan 1, 2009

  • SME
    Characterization Of Hydrothermally Dried Low-Rank Coals – Preprint 97-75

    By O. Noirot, H. C. Owens, P. D. Rao, D. E. Walsh, J. R. Mokka

    Over a period of seven years (1989-1996) the Mineral Industry Research Laboratory (MIRL) University of Alaska Fairbanks, has investigated the effects of temperature, residence time, and particle size

    Feb 24, 1997

  • SME
    Optimum Auxiliary Fan Location to Control Air Recirculation (Mining, Metallurgy & Exploration)

    By Ajit Godbole, Ping Chang, Ramakrishna Morla, Purushotham Tukkaraja, Shivakumar Karekal

    This paper presents the optimum auxiliary fan(s) location to control air recirculation in dead-end workings where dieselpowered vehicles operate. Investigations were conducted with various secondary f

    Oct 18, 2022

  • SME
    Computers And The Planning Of Dragline Mines

    By Peter N. Calder, J. L. Workman

    There are many opportunities for computers to assist in dragline mine planning. Three important areas particularly lend themselves to computer assisted study. These are overall mine design and plannin

    Jan 1, 1989

  • SME
    Exploring Individual Factors in Health and Safety Outcomes in the Mining Industry

    By CASSANDRA L. HOEBBEL, Emily J. Haas, MARGARET E. RYAN

    In recent years, there has been increasing interest in the role that individual factors play in health and safety (H&S) outcomes in the mining industry. Two surveys, one measuring self-reported routin

    Jan 9, 2022

  • SME
    Mining Asset Development for Virtual Reality

    By J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • SME
    Tunnel Boring Machine Development

    By Martin Herrenknecht

    Tunnel boring machine (TBM) development continues to take on not only larger diameters, but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressures u

    Jan 1, 2008

  • SME
    Advanced Measurement And Monitoring Technologies For Environmental Problem Solving A Technology Review

    By F. B. Henderson

    1.0 PROLOG Since the "end" of the Cold War, revolutionary new research and commercial remote sensing capabilities are being developed that will dramatically change the way we map the earth and addres

    Jan 1, 1999

  • SME
    Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel Project

    By Stephen M. Smading

    The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b

    Jan 1, 2009

  • SME
    Characteristics Of Chimney Subsidence Sinkhole Development From Abandoned Underground Coal Mines Along The Colorado Front Range

    By Gordon M. Matheson

    The factors which control chimney subsidence sinkhole development in weak rock were assessed by analyzing the characteristics of approximately 3000 chimney subsidence features along the Colorado Front

    Jan 1, 1986

  • SME
    Handling The Impacts Of Blasting On Grand Central Terminal For The MTA?s East Side Access Project

    By A. J. Thompson

    The Metropolitan Transportation Authority (MTA) East Side Access project (ESA) will, when it is complete, provide a new link to the east side of Manhattan from Long Island, NY that, linked with the Se

    Jan 1, 2012

  • SME
    Multi method approach to heavy mineral exploration: Miocene of Denmark

    By T. Rasmussen, T. G. Jørgensen, T. Fischer, R. K. McLimans, C. Knudsen, D. Frei

    Ilmenite-bearing paleo-beach deposits were discovered in Jylland, Denmark using a combination of Ground Penetrating Radar (GPR), portable X-ray fluorescence (XMET), bulk XRF analyses, Computer Control

    Jan 1, 2005

  • SME
    Horizontal Stress And Longwall Headgate Ground Control – Preprint 97-187

    By Thomas P. Mucho, Dennis Dolinar, Christopher Mark

    Horizontal stresses are caused by global plate tectonic forces. During 1995 alone, they were largely responsible for closing two U.S. longwall mines. This paper presents six case histories from Penns

    Feb 24, 1997

  • SME
    Probable Cost Estimating and Risk Management

    By John Reilly

    Costs of complex/underground projects have been consistently underestimated and delivery on time and on budget has been problematic. This has been attributed, to inadequate cost estimates and unidenti

    Jan 1, 2008

  • SME
    Diesel Emissions Control Strategies For The Use Of Diesel Engines In Underground Coal Mines – Preprint 97-144

    By N. Paas

    Diesel powered equipment has been operated in underground coal fir mare than 50 years. According to the Mine Safety and Health Administration (MSHA), there are approximately 3,000 diesel units operati

    Feb 24, 1997

  • SME
    Evaluation Of An Enhanced Gravity-Based Fine-Coal Circuit For High-Sulfur Coal

    By M. K. Mohanty

    One of the main objectives of this study was to evaluate a fine-coal cleaning circuit using an enhanced gravity separator specifically for a high sulfur coal application. The evaluation not only inclu

    Jan 1, 2008

  • SME
    A scale model experimental study for estimating the productivity of bulk push dozer operations in hard-rock mining (MME Technical-Paper Abstracts)

    By MEHMET KIZIL, PETER KNIGHTS, ROYAL REA

    A 1/20 scale experimental dozer push test rig was designed and constructed to quantify the expected production rates (loose cubic meters per hour) for dozers operating in hard-rock bulk push applicati

  • SME
    Pit Slope Design Challenges In Residual Soils And Weathered Rock: Background And A Case Study

    By J. Geyer, B. T. Burton, H. W. Newcomen

    For open pits developed in tropical climates the upper portions of the pit walls are often located in residual soils and weathered rock. Due to the presence of relict structures, and the relatively l

    Jan 1, 2000

  • SME
    Major Issues In Subsidence Regulation

    By Gregory R. Gorrell

    The legal issues surrounding the regulation of subsidence are among the major concerns facing the underground mining industry today. Whether subsidence occurs almost immediately as a result of longwal

    Jan 1, 1986