Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Site Development and Foundation Planning for a Wastewater Treatment Plant ExpansionBy Steven R. Ahlfield, Ali Ghandeharioon
A wastewater treatment plant commissioned in 1978 is undergoing a major expansion. Planning various phases of the 8-hectare expansion at this site requires an understanding of the site response during
Jan 1, 2019
-
Design And Testing Of Deep Foundations For Wind Turbines In Western AlaskaBy Lorie M. Dilley
Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alaska villages, has made a concerted effort to install wind turbines in the villages they serve in an
Jan 1, 2010
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)By George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2003
-
Cost Effective Excavation Support in SeattleBy Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger SuperstoreBy George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2005
-
Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.By Lucie Spencer, Craig Butterworth
"This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot
Jan 1, 1900
-
Piling Framed Tie down Concrete Retaining WallBy Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins
Jan 1, 2007
-
Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)By Saieb Haddad, Henry Pate
"Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in
Jan 1, 2007
-
An Alternative Lower Carbon Footprint Foundation For A Large Oil Gas Project In Jurong Island, SingaporeBy Selvaganesh Selvaraju, Deepak Raj, Sandun N. Wimalasena
One of the world leading oil majors is carrying out a multi-billion-dollar expansion of its integrated manufacturing complex in Jurong Island, Singapore, the global oil trading and refining hub. Soil
May 1, 2022
-
Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e
-
Numerical Analysis in Assisting Crane Pad Design and Underground Utilities EvaluationBy Yazen Khasawneh, Yao Zhang
Upgrading and maintenance programs were proposed at a power generating plant in Indiana. To perform construction activities associated with the proposed upgrading and maintenance, a LR11350 crawler cr
Jan 1, 2019
-
Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground StationBy Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth
In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a
May 1, 2022
-
Settlement Evaluation of Large Water Storage Tanks Under Challenging ConditionsBy Ben M. Lewis, Yogesh Prashar
"The East Bay Municipal Utility District (EBMUD) is a major water utility service providing water to over 1.3 million people in the eastern San Francisco Bay Area. EBMUD manages 28 dams at 5 terminal
Jan 1, 2016
-
Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After ConstructionBy Stephen Buttling, Zhong Rui
"A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a
Jan 1, 1900
-
Ground Improvement for New Jersey Turnpike Interchange 14A: A Case StudyBy Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed
"Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons
Jan 1, 2017
-
State-of-the-Art Rock Socket Analysis and Design for Laterally Loaded Drilled ShaftsBy Aly Mohammad, Dongyi Yue
"The design of rock sockets for drilled shafts and piles proves to be a challenge for the Design Engineer. The magnitude of loads on the shaft and the behavior of the rock are critical in determining
Jan 1, 2005
-
Stability Assessment of a Deadman Anchor Pile Close to the Bulkhead WallBy WenJun Dong
This paper presents the stability assessment of the steel pipe piles that are used to support a deadman beam to anchor an adjacent bulkhead wall. Finite element analyses are performed to assess the st
Sep 8, 2021
-
Recent Experiences With Optical Fibre Monitoring Of Geotechnical StructuresBy Gust Van Lysebetten, Monika de Vos
The objectives of monitoring geotechnical structures can be very diverse, including optimisation of the design, quality control, long term performance assessment, and approval of innovative execution
May 1, 2022
-
Outline and Application Example of Deep Mixing Meeting High Quality and High Efficiency-ExecutionBy Hidekatsu Takeuchi, Masaru Sakakibara, Shigeo Tanabe, Kenji Harada, Akihiko Suzuki, Shoji Morihana
"Deep mixing (DM) method, one of the most commonly used solidification methods, is based on the principle of solidifying soft ground. It can be classified into two categories such as Cement Deep Mixin
Jan 1, 2015
-
The Geo-Impuls Programme: Towards Reducing Geotechnical Failure in the NetherlandsBy Paul M. C. B. M. Cools, Martin Th. van Staveren
In 2010, the 5-years joint industry programme Geo-Impuls started in the Netherlands. The ambitious goal of this programme is to reduce geotechnical failures in our civil engineering projects by half i
Jan 1, 2017