    Site Solutions For The Pisa Tower Remediation - 1 - Introduction

    By Paolo Heiniger

    The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter

    Jan 1, 2000

  • DFI
    Underpass Support Using Secant Pile Walls And Cement Deep Soil Mix Bottom Seal

    By Carole L. B. Mitchell

    The South 180th Street Grade Separation underpass in Tukwila and Renton, Washington, USA, permits vehicular traffic to pass beneath Burlington Northern Santa Fe and Union Pacific railroad tracks. The

    Jan 1, 2004

  • DFI
    Unique Algorithm Which Takes into Account Source Wave Travel Paths When Estimating Absorption Values From DST Data Sets

    By Gerald Verbeek, Erick Baziw

    Dynamic soil analysis (DSA) in geotechnical practice is intimately related to the capability of measuring the necessary soil properties of shear modulus and absorption. In DSA the methods of analysis

    Jan 1, 2019

  • DFI
    An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction

    By F. Pagliacci

    Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste

    Jan 1, 2000

  • DFI
    Rion-Antirion Bridge - An Olympian Effort Overcomes Extreme Geohazards

    By Ricardo Dobry, Alain Pecker, George E. Leventis, Ralph B. Peck

    "This year’s DFI Outstanding Project Award is for the design and construction of the foundation scheme for the largest cable-stayed bridge in the world. In 1993, Gefyra, SA (a French/Greek consortium

    Jan 1, 2007

  • DFI
    Rapid Vibratory Pile Driving Hammer For Deep Foundation

    By Li Tiemin

    It is one of important tasks in research of vibratory pile driving to increase speed of pile driving and depth of pile driving -- this means to increase capability of penetrating hard layer. In genera

    Jan 1, 1991

  • DFI
    Environmental Impact Management Through Foundation System - Synopsis

    By Deshmukh A. M.

    Existence of human beings and their relationship with the nature is symbiotic. The lack of perspective and negligence of nature disturbs the equilibrium of environment and causes unprecedented disaste

    Jan 1, 1996

  • DFI
    Modulus of Elasticity in Deep Bored Piles

    By Carlos Lam, Joram M. Amir, Erez I. Amir

    "Abstract The modulus of elasticity of pile material (E) is an important parameter for the interpretation of both static and dynamic loading tests on piles. This value is commonly assumed to be consta

    Jan 1, 2014

  • DFI
    Effect Of Installation On Quality Of Deep Mixed Soil Cement Columns

    By Ali Porbaha

    Rapid growth in the urban development requires continuous search for innovative technologies to construct complex infrastructure systems. Deep mixing is one promising construction technology that has

    Jan 1, 2001

  • DFI
    Suction Piles And Suction Anchors For Offshore Structures

    By S. Bang

    In recent years, suction piles and suction anchors have been used as underwater foundations for various offshore structures. They have been proven very versatile, effective, and environmentally frien

    Jan 1, 2009

  • DFI
    Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • DFI
    Case History: Foundations For The New Mississippi River Bridge, St. Louis

    By Paul J. Axtell

    This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c

    Jan 1, 2011

  • DFI
    Bearing Capacity Of Precast Nodular Piles In Tianjin Soft Clayey Soil

    By Xu Youzai

    Static loading teets of five nodular piles and four non-nodular piles were performed in Tianjin soft clayey soil in which measurements of axial force and movements were made. Distribution of shaft res

    Jan 1, 1991

  • DFI
    Volume Averaging Technique for Modelling Deformations in Soft Soil Improved with Deep Mixed Columns

    By Minna Karstunen, Patrick Becker

    "Abstract The deformation behaviour of a foundation on deep mixed columns in a natural soft soil is a three-dimensional problem, which has to be considered adequately in numerical modelling. However,

    Jan 1, 2014

  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • DFI
    Residual Load Development Case Study In Driven Cast-In-Situ Piles

    By Packer M. L

    Residual load development in driven precast piles has been widely researched in recent decades, however, cast-in-situ piles are often falsely assumed to be unaffected by this mechanism. In contrast to

    May 1, 2022

  • DFI
    Disconnected Piled Raft Foundations Performance (DCPRF) With Cushion

    By Saeed Salehi Malekshah

    In hybrid foundation system or piled raft foundation (PRF), the raft has adequate bearing capacity and piles are usually required to ensure overall stability of foundation and also to act as settlemen

    Jan 1, 2011

  • DFI
    Approach Wall Foundations Olmsted Locks And Dam Project ? Summary

    By Jeffrey A. Schaefer

    The Olmsted Locks and Dam project is located on the Ohio River approximately 16.5 miles upstream of its confluence with the Mississippi River. It consists of twin 1200 ft. locks with floating and fixe

    Jan 1, 2001

  • DFI
    Soldier Pile Installation Light Rail Rapid Transit Buffalo, New York - Project Description

    By Daniel J. Rider

    In 1980 the Niagara Frontier Transportation Authority contracted for three miles of cut and cover box structure and station construction in Main Street, Buffalo, New York. Project depths ranged from

    Jan 1, 1987

  • DFI
    New Technology For An Old Seawall: Micropile Installation At Ellis Island National Park In New York Harbor

    By Helen D. Robinson

    The seawalls that surround Ellis Island were constructed in the early 1900s and now show varying degrees of deterioration. An innovative approach to the structural repair of the seawalls was develope