    Evaluation of liner capacity for blast damage mitigation

    By J. F. Archibald

    A research effort has been undertaken, under Workplace Safety and Insurance Board of Ontario (WSIB) sponsorship, to characterize the support capabilities of conventional and innovative spray-on lining

    Jan 1, 2004

  • CIM
    Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and Installation

    By Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt

    "In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due

    Jan 1, 2013

  • CIM
    The Use of Charcoal as an Alternate Internal Fuel Addition in the Pelletising Process

    By Keith R. Vining

    Solid fuel, usually coke or anthracite, is commonly added to ground iron ore fines in the pelletising process to reduce the amount of burner fuel required and the maximum firing temperature, while mai

    May 1, 2007

  • CIM
    From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles Concentrator

    By Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin

    "North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part

    Jan 1, 2003

  • CIM
    Operation of a High-Density Tailings Thickener

    By Ernie Doell, Trung Nguyen

    "In early 1995 Cluff Mining commissioned a newly constructed high density tailings thickener at its Cluff Lake uranium mill. The 85 ft diameter high density thickener is one of the first of its kind i

    Jan 1, 1996

  • CIM
    Glassfill — An environmental alternative for waste glass disposal

    By D. DeGagne, E. De Souza, J. F. Archibald

    This paper describes the potential use of anew agent material for backfill consolidation, ground waste glass, to be used as partial replacement of Portland cement fractions within backfill. Significan

    Jan 1, 1997

  • CIM
    Non-Wetting Rare-Earth Oxide Ceramics with Applications to Sustained Hydrophobicity

    By G. Azimi, K. K. Varanasi1, A. T. Paxson, R. Dhiman, H. -M. Kwon

    Hydrophobic materials that are robust to harsh environments are needed in a broad range of applications. Although durable materials such as metals and ceramics, which are generally hydrophilic, can be

    Jan 1, 2014

  • CIM
    Goldcorp Inc., Red Lake Mine Design and Commissioning

    By R. Tyreman, G. Ritson

    "The Red Lake Mine is situated in Balmer Township, Red Lake area in northwestern Ontario. It is an underground mine that has been in production since 1948. The property was originally known as the Dic

    Jan 1, 2001

  • CIM
    Model Predictive Control of the Flotation Process

    By Donald Leroux, Martin Suichies, Andy Trusiak, Chris Dechert

    "In modem concentrators, the operation of flotation machines is often stabilized by simple control loops. Froth level, slurry density and aeration rate are all physical parameters typically controlled

    Jan 1, 1999

  • CIM
    The Link between Pulp Zone Hydrodynamic Characteristics and Froth Stability in a 125 m3 Flotation Column

    By D. Knuutila, G. Goyette, James A. Finch, G. Bartolacci, A. Fortin, Chi Ho Lau, A. Lockhart

    "In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collect

    Jan 1, 2008

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017

  • CIM
    Retrofit of Agrium’s Special Standard Surge Bin Improves Reliability, Safety, and Life Cycle Cost

    By T. Holmes, S. Davison

    "A surge bin at Agrium’s Vanscoy potash operations has been plagued with flow, wear, and corrosion issues since being built in 1967. The culprits? The bin’s carbon-steel construction, geometry, and th

    Jan 1, 2018

  • CIM
    Pavoncelli Tunnel Case Study

    This paper describes the back analysis of the Pavoncelli tunnel, an hydraulic tunnel which was excavated between 1904 and 1915 in South of Italy and experienced severe damages during the 1980 Irpino-L

    May 1, 2009

  • CIM
    Effective Mine Ventilation Management without Compromising Mine Health & Safety and Productivity

    By W. E. Oching, M. M. Ghomshei

    "Collaboration among Ventilation Engineers, Mine Inspectors, worker representatives, health and safety officers and management is key to an effective operational mine ventilation management. Mine vent

    Jan 1, 2019

  • CIM
    Geology, 40Ar/39Ar geochronology and Sn-W-Mo-bearing sheeted veins of the Mount Douglas Granite, southwestern New Brunswick

    By M. J. McLeod, D. R. Lux, R. P. Taylor

    "The Mount Douglas Granite constitutes the eastern part of the Saint George Batholith and contains the youngest, most differentiated phases of the batholith. It also contains extensive endogranitic, l

    Jan 1, 1988

  • CIM
    A Non-Nuclear Density Meter and Mass Flow System Measuring Mining Slurries with Entrained Gas

    By R. H. Batey

    "The process control and cost of monitoring mining slurries is normally accomplished using a continuous mass flow system, conventionally embodying a volumetric magnetic flow meter and nuclear density

    Jan 1, 2013

  • CIM
    The Stillwater Paste Backfill Plant

    By Frank Yu, Bob Fukuhara

    "The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe

    Jan 1, 2000

  • CIM
    King Mine No. 3 Shaft and Equipment

    By J. G. Ross

    IN the paper entitled Block Caving at the King Mine (1), which was presented at the Annual General Meeting held in April, 1934, at Quebec, it was pointed out that, owing to certain conditions and fina

    Jan 1, 1939

  • CIM
    Two New Structures of Hydroxamate Collectors and Their Application to Ilmenite and Wolframite Flotation

    By Brian Hart, Hong Zhong, Liuyin Xia, Kyle Douglas

    "The application of hydroxamic acid as flotation collectors is fast becoming of significant interest for the selective flotation of oxide minerals along with upgrading oxidised based metal ores and mi

    Jan 1, 2015

  • CIM
    Improvement of Valuable Mineral Transport and Gangue Drainage in Froth Flotation

    By G. Bartolacci, G. Couture, Levasseur. B., A. Lockhart, D. Nathan

    "Pulp and froth zone characterization in a flotation circuit to improve transport of valuable minerals remains a challenge. Even though some significant breakthroughs have been made in the development

    Jan 1, 2017