    Noise attenuation with exhaust after treatment systems on a scooptram at Falconbridge's Strathcona Mine

    By J. K. Weglo, M. U. Savich

    "The measurement and evaluation of the noise emanating from an ST4A scooptram in an underground stope under a simulated work cycle, and under three conditions of after-treatment systems is covered.The

    Jan 1, 1986

  • CIM
    "Aluminium Smelter Plants - Concrete Pre-Fabricated Elements"

    By R. Carrier

    "There has been a continuous evolution with the use of pre-cast concrete elements in the construction of aluminum smelters. In 1990, Phase I of Alouette was built using cast-in-place concrete exclusiv

    Jan 1, 2006

  • CIM
    Geotechnical Analysis and Design of Leaching Heap No. 2, Meydook Copper Mine, Iran

    By Z. Abbasloo, A. Masoomi, L. Ebrahimi, A. Mortazavi, A. Keshavarz

    "Investigation and 3D analysis of Heap no. 2 of Meydook copper complex was the subject of this study. In this project all geological and geotechnical investigations conducted in the mine were evaluate

    Jan 1, 2015

  • CIM
    Improving Traffic Awareness on Mine Access and Haul Roads

    By T. M. Ruff

    A GPS-based traffic awareness and collision avoidance system has been implemented at mines with long, narrow access roads to help avoid accidents involving two approaching vehicles or vehicles followi

    Aug 1, 2013

  • CIM
    Mechanical Behavoir of Beishan Granite with Calcite-Cemented Joint under Uniaxial Compression

    By J. F. Liu, L. Chen, C. P. Wang

    "Calcite-cemented joints abound in the rock masses of Beishan area, which is the most potential area for the high-level radioactive waste (HLW) disposal of China. The mechanical properties of Beishan

    Jan 1, 2015

  • CIM
    The Dominance of the Competent

    The control of AG mills fed by ores with harder and softer components can be challenging due to the sensitivity of the mill to the ratio of hard to soft components. The mills at LKAB?s iron ore operat

    Jan 1, 2012

  • CIM
    The Kidd Creek copper smelter an update on plant performance

    By C. J. Newman, K. Molnar, A. G. Storey, G. Macfarlane

    "The Kidd Creek copper smelter started operation in June 1981 using the Mitsubishi Continuous Smelting Process. A steady increase in plant production rates has been demonstrated, and the annual tonnag

    Jan 1, 1992

  • CIM
    Zen and the Art of Specification Writing

    By R. A. Nemchek

    Over the years, concentrator plant design has evolved from a large number of small grinding mills to a small number of large mills. In many cases, all of the tonnage runs through a single mill (typica

    Jan 1, 2012

  • CIM
    Increase of Productivity in a Magnesite Flotation Operation by Means of Selective Milling

    By A. P. Yovanovic, P. Bonadia, M. N. Moraes, C. F. Matos

    "The magnesite flotation operation of Magnesita Refractories, in Brumado – Brazil, has four parallel ball mills working in closed circuit with hydrocyclones to grind the ore for the reverse flotation

    Jan 1, 2016

  • CIM
    Geology at the Scully Mine

    By J. O'Leary, R. Cannell, D. Honsberger

    "The Scully Mine deposit lies within the group of metasediments that together comprise the rocks of the Labrador Trough. The ore itself still retains the bedding characteristics of the parent rocks an

    Jan 1, 1972

  • CIM
    High Current Density Silver Electrorefining Process: Technology, Equipment, Automation and Outotec’s Silver Refinery Plants

    By C-D. Johansson, B. Ögren, B. M. Ludvigsson, K-Å. Johansson, R. Lindh, G. Berg, M. Maliarik

    This paper presents the High Current Density (HCD) Silver Electrorefining Process. A 25-year history of development of the silver electrorefining process as well as associated equipment is given. The

    Jan 1, 2014

  • CIM
    The Future of Mining Engineers (0d0deb0e-e553-4068-9f65-793aefa55daa)

    By T. Patching

    "A GLANCE BACK AT what has happened in the past is often a useful guide to the future, although it should be used mainly to provide a sense of direction rather than a map that must be followed. As a p

    Jan 1, 1972

  • CIM
    The Changing Canadian Nickel Smelting Landscape - Late 19th Century to Early 21st Century

    By C. M. Diaz, S. W. Marcuson

    In the late 19th century, the discovery of rich nickel-copper sulfide ore bodies in Sudbury and the need for tonnage quantities of the metal to be used in nickel steel armor provided the foundation fo

    Jan 1, 2005

  • CIM
    Structural geology and geostatistical parameters of the Afton copper-gold mine, Kamloops, B.C.

    By Alan Reed

    "Afton Mines Ltd. (N.P.L.) operates an 8500-tpd open-pit copper-gold mine near Kamloops, R.C. The pit is currently 480 feet deep and will reach an ultimate depth of 800 feet. The east, south and west

    Jan 1, 1983

  • CIM
    Opportunities for Capital Investment in the Development of the Mineral Resources of Northern Ontario and Quebec

    By Balmer Neilly

    We are regularly told that before making a new investment one should seek the advice of his banker. If we were to place the subject matter of this paper before bankers. other than those who have exper

    Jan 1, 1924

  • CIM
    Oil and Gas Possibilities in Western Canada

    By Link. Theo A.

    Introduction Since the discovery of a major oil pool at Leduc, Alberta, on February 13th, 1947, the long spell of 'oil drought' in Western Canada is now being turned into an oil and gas f

    Jan 1, 1949

  • CIM
    A modified accumulator method for measuring surface radon flux from a uranium tailings pile

    By T. P. Lim, N. K. Davé

    "A modified accumulator method was devised to measure surface radon flux from porous media. It consists of a collector hood type of accumulator with a homogenizer pump and a pressure balancer. The lat

    Jan 1, 1982

  • CIM
    Kemess South Mine Closure and Reclamation

    By Georgia J. Lysay

    Kemess South Mine ended operations in March 2011. Final reclamation works began during operations in 2008 in anticipation of closure. The focus of reclamation during mine operations was on the inactiv

    May 1, 2011

  • CIM
    Process Improvements at Falconbridge Dominicana

    By D. Ortiz, J. R. Frias, E. D. Mast, J. J. Fañas

    Falconbridge Dominicana (Falcondo) has operated an integrated tpy nickel laterite mine and ferro-nickel processing plant since 1972 in the Dominican Republic. The operation includes mining, a processi

    Jan 1, 2005

  • CIM
    Iron Sulfide Minerals in Thiosulfate-Gold Leaching: Some Problems and Solutions

    The negative effects of pyrite and pyrrhotite on thiosulfate gold leaching have been investigated. Possible remedies to reduce some problems are discussed. In a gold bearing pure silicate ore, 92% of

    Jan 1, 2005