Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Baal Bone Coal Preparation Plant - A Case History

    As an indication of the overall quality for the three periods the expected run of mine ashes are given. Operating Period R.O.M. Quality Years 1 - 4 22.0% Ash (db) Years 5 - 14 18.8% Ash (db) Year

    Jan 1, 1986

  • AUSIMM
    Estimation and Reporting of Copper Ore Reserves at Mount Isa Mines Limited

    In line with the recommendations of The AusIMM/AMIC Joint Committee Report in 1981 Isa Mine ore reserves are quoted in proven and probable categories (recoverable ore reserves). Internal reporting

    Jan 1, 1987

  • AUSIMM
    The Manufacture of Seamless Steel Tubing in Australia

    The scope of this paper has been restricted to the manufacture in Australia of seamless steel tubing, as the subject of buttweld tubing has already been dealt with by A. N. Hamilton in a paper deliver

    Jan 1, 1947

  • AUSIMM
    An Integrated Approach to Evaluation of Blasts - A Case Study

    By Chung S

    The problems associated with equating calculated and measured properties of explosives with blast results are examined. The results from six full-scale test blasts in a limestone quarry are describe

    Jan 1, 1990

  • AUSIMM
    Cave Mining - State-of-the-Art

    Caving is the lowest cost underground mining method, provided that drawpoint spacing, drawpoint size and ore handling facilities are designed to suit the caved material and that the drawpoint horizo

    Jan 1, 1995

  • AUSIMM
    The Development and Implementation of a Fully Remote Stoping Method at Beaconsfield Gold Mine, Tasmania

    By S Arthur, J Mills, A R. Penney

    A key aspect of seismic management for narrow vein stoping of the west zone at the Beaconsfield Gold Mine has been the development of a fully remote extraction method that does not require personnel a

    Jan 1, 2008

  • AUSIMM
    Sampling of Stream Sediments in Geochemical Drainage

    Prior to 1975, most geochemical drainage surveys for gold were based on analyses for pathfinder elements, such as As and Cu, rather than direct analysis for gold, for two reasons. Firstly, analytical

    Jan 1, 1976

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal using the Parry Process

    A pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development

    Jan 1, 1963

  • AUSIMM
    Panel Caving Scheduling Under Precedence Constraints Considering Mining System

    By E Rubio, N Morales

    Currently, mine plans are optimised by using several criteria as objective functions, like profit, life-of-mine, concentration of some pollutants, mining costs, confidence level or ore resources, with

    Sep 26, 2011

  • AUSIMM
    Excavation of Two Long Tunnels Through Clay (Campania Waterworks, Italy)

    By Turco E, Pelizza S, Castellani F, Stanganelli V

    Excavation are in progress for the building of tunnels of the waterworks in West Campania (Naples). The works afferent to part II envisage tunnelling through a miocenic clay formation over consoli

    Jan 1, 1987

  • AUSIMM
    Estimation of bubble size distribution and local turbulence in a bubbly flow system

    By P Ireland, S Mitra, G Evans, A Wang, M M. Hoque

    This work presents an experimental study of flow dynamics in a bubble column system (crosssection: 100 mm × 100 mm) using a non-intrusive optical technique with targeted application in a novel REFLUX™

    Aug 24, 2022

  • AUSIMM
    An Analysis of the Performance of Multi-Stage Grinding and Cyclone Classification Circuits

    By Lynce AJ

    A method has been developed for the prediction 'of 'the- . performance of a multi-stage grinding=cyclone classification circuit of any degree of complexity on any ore for a wide range `of

    Jan 1, 1964

  • AUSIMM
    Rheological Controls on the Geometry of the Currawong Volcanic-hosted Massive Sulfide Deposit, Lachlan Fold Belt, Victoria, South-east Australia

    By D Macklin, R Hammond, T G. Blenkinsop

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Base metal sulfides at the Currawong volcanic-hosted massive sulfide deposit in the Lachlan

    Mar 18, 2015

  • AUSIMM
    Evaluation of Person-Wearable Methane Monitors

    By E E. Hall, C D. Taylor, D S. Yantek

    Regular monitoring for methane gas is required near working faces in gassy underground mines where the potential for methane ignitions is greatest. However, high concentrations of methane can also acc

    Jan 1, 2005

  • AUSIMM
    Coal Sizing Equipment - Expression and Presentation of Result of Performance Tests

    By Partridge AC

    In order to provide a'valid description of the performance of size classifying equipment it is necessary that a standard procedure be established for testing and for the subsequent expression

    Jan 1, 1984

  • AUSIMM
    Surface Assisted Continuous Underground Minign

    Longwall mining has historically been considered an application for only deep reserves. This has changed in the recent past as longwall has become competitive with surface mining. Many resources marke

    Jan 1, 1998

  • AUSIMM
    Wall Reinforcement in Open Pit Mining

    Stressed steel cables, similar to those used in pre-stressed concrete, have been used for rock mass reinforcement, in civil engineering, for many years. This type of reinforcement has been attempt

    Jan 1, 1986

  • AUSIMM
    The Use Of Electrothermal Excitation Atomic Absorption Spectrophotometry In Geochemical Prospecting Analysis

    It is now 32 years since Walsh's classic publication (1) heralded the beginning of atomic absorption spectrophotometry (AA) as we know it today. During this time, AA has developed into the mo

    Jan 1, 1987

  • AUSIMM
    Immobilisation of Toxic Elements in Mineral Reservoirs

    Different mineral structures can act as mineral reservoirs for the immobilisation of toxic compounds. In the paper different mineral structures will be explained and their potential for incorporation

    Jan 1, 2008

  • AUSIMM
    Ore Estimation and Reconcillation at Panguna

    Reconciliation of the ore reserve has been an integral part of mine planning since Bougainville Copper Ltd. commenced mining operations at Panguna in 1972. Confidence in the ore reserve is considere

    Jan 1, 1987