Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geohazmap Implementation in Block Cave Mines

    By S Talu, E Savage, S Howe

    Major falls of ground, strainbursts, airblast and mudrush events are the major hazards in block caving environments, resulting in both safety and financial consequences and losses. Rio Tinto mines hav

    May 9, 2016

  • AUSIMM
    Ore Reserves Estimation For Copper Orebodies At Mount Isa Mines Limited

    Ore Reserves estimation for the two producing copper orebodies at Isa Mine, Mount Isa, Queensland is discussed. The principal estimation techniques used and discussed are first, a computer based in

    Jan 1, 1979

  • AUSIMM
    Ore Reserve Estimation at Renison Tin Mine

    Computer-based block modelling of orebodies is now used at Renison Tin mine for the estimation of ore reserves. It is considered that this has resulted in improved reserve estimation for complex &apos

    Jan 1, 1990

  • AUSIMM
    Grinding Control Development at ZC Mines

    By Freeman N

    A microcomputer based control system has been developed and implemented at ZC Mines (now Pasminco Mining). The control system maximises throughput at a product size set point while maintaining a &quot

    Jan 1, 1990

  • AUSIMM
    Fracture-Plane Control Blasts with Satellite Holes

    A novel fracture-plane control blasting technique with particular application in wall-control blasts in mines employing medium to large diameter boreholes is described. It consists of a string of ne

    Jan 1, 1990

  • AUSIMM
    Continuous Monitoring of Barometric Pressure in Deep Mines

    By J Krawcz, S Wasilewski, W Mironowicz

    Barometric pressure and its variation in deep underground workings have a considerable effect on ventilation conditions. Pressure changes which create transient states of air flow and air parameters i

    Jan 1, 2005

  • AUSIMM
    Post Pillar Cut and Fill Stoping at the Dolphin Mine of King Island Scheelite

    By Bedford D. J

    The post pillar cut and fill stoping method has been adopted by King Island Scheelite for the extraction of the main Dolphin orebody. The orebody is a massive, tabular deposit varying from 10 to 50

    Jan 1, 1977

  • AUSIMM
    Opening Occupational Health and Safety Opportunities for Underground Mining Companies by Closing the Knowledge Application Gap

    By Else D

    While the underground mining work environment may have processes and equipment considered unique, most of the broad issues likely to affect the occupational health and safety of employees are not. One

    Jan 1, 1992

  • AUSIMM
    Economic Aspects of Carbon-in-Pulp Plant Design

    Three key areas of C.I.P. plant design, viz. leach- ing time, adsorption and the gold loading on the carbon, are discussed and illustrated with examples. The need for accurate pilot plant data for u

    Jan 1, 1982

  • AUSIMM
    Selection Criteria for Open Pit Production Equipment û Payload Distributions and the æ10/10/20Æ Policy

    By R J. Hardy

    The aim of this study is to examine the volumetric and mass movement characteristics of load and haul operations using statistical modelling of relatively large samples of bucket loads that are transp

    Sep 26, 2011

  • AUSIMM
    Practical Conditional Simulation for Geologists and Mining Engineers

    By Coombes J, Richards W. L

    The objective of this paper is to illustrate, in a practical way, how both geologists and mining engineers can use conditional simulation to add value to their decisions. Inherent assumptions, requi

    Jan 1, 1998

  • AUSIMM
    Heat, Mass and Impulse Transport Analogies for Underground Airways

    By Mousset-Jones P, McPherson M. J

    Underground airways are characterized by irregular shape and uneven surfaces including large-scale natural roughness, fractures, and a super-imposed sand roughness. Swirls in the grooves of the wa

    Jan 1, 1988

  • AUSIMM
    On-Stream Analysis and Sensors for Mineral Processing

    By Mathew P. J

    The CSIRO Division of Mineral and Process Engineering in Melbourne has been developing on-stream analysis sensors based on neutron and gamma radiation for better control of quality and process opera

    Jan 1, 1991

  • AUSIMM
    Future Process And Design Aspects In Iron Ore Pelletizing

    By Hinrichsen H. D, Rathburn D. R, Stieger W

    The present situation in the field of iron ore pelletizing is briefly described with particular view of the Lurgi/Dravo travelling grate process. To meet todays pellet quality requirements with reg

    Jan 1, 1974

  • AUSIMM
    Real-Time Data Acquisition and Control Projects at the UDC Research and Development Laboratory

    By Fiedler VA, Threadingham GM, Leckenby DF, Clarkson CJ

    The Utah Development Company Research and Development Laboratory has embarked upon a programme of optimisation of the company's coal preparation plants. This goal is being accomplished in a t

    Jan 1, 1983

  • AUSIMM
    The Derivation of Thermodynamic Properties of Slags from Slag Fuming Plant Data

    A Kellogg type computer model of the slag fuming process is applied in reverse to derive some thermodynamic properties of components in lead blast furnace slag. At 1200¦C, the average activity coe

    Jan 1, 1980

  • AUSIMM
    Experimental Galleries

    There is no other effective way for study ing firedamp and coaldust explosions than to produce controlled explosions in a pre-monitor- ed environment - either mine openings kept for the purpose, or

    Jan 1, 1981

  • AUSIMM
    Planning for Access to the Deep Copper Orebodies at Mount Isa Mines Limited

    By Slater R

    The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The

    Jan 1, 1982

  • AUSIMM
    The Structural and Hydrodynamic Framework for Epithermal Exploration (2963b0f0-6ca9-48f5-bafb-06fd586f730b)

    By Etheride MA

    The evolution of economic precious metal and copper-gold deposits in high-level igneous terranes is dependent on very efficient fluid focussing. This is most readily achieved by contemporaneous defor

    Jan 1, 1995

  • AUSIMM
    The Manufacture of Hot and Cold Finished Seamless and Welded Steel Tubing

    By Cotton P. L

    Although the terms "pipe" and "tube" are normally considered synonymous, a distinction is often drawn, the former term being applied to the hot finished product and the latter to c

    Jan 1, 1951