Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Origin of the "Jasper Bars" of Western Australia

    The notes from which this paper has been prepared were set down at the time of the author's departure from Australia in 1935. Mr. Frank Forman, Government Geologist of Western Australia, who has

    Jan 1, 1939

  • AUSIMM
    Optimum Management of Truck Tyres in a Mine

    By S Casas Castellanos

    "Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o

    Nov 15, 2016

  • AUSIMM
    The Ignition Temperature of a Nickel Concentrate from Kambalda Under Simulated Flash Smelting Conditions

    Particles of a complex nickel sulphide concentrate (containing pyrite, pyrrhotite, pentIandite, and violarite as the major mineralogical constituents) were entrained in a stream of hot gas the tempera

    Jan 1, 1978

  • AUSIMM
    Post-Mine Leaching of Galena and Marmatite at Broken Hill

    By Blanchard R

    In stopes of the 2000- and 2150-ft. levels in the North mine section of North Broken Hill Limited, whence a substantial proportion of the company's production is being drawn, and especially in st

    Jan 1, 1942

  • AUSIMM
    Ore-Treatment Plant and Treatment Operations-Edna May Gold Mining Company N.L., Westonia, W.A.

    NATURE OF ORETHE Edna May ore consists mainly of clean quartz of a moderately hard and tough nature. The gold content is "free" and fairly coarse, so that a large percentage is recovered by

    Jan 1, 1919

  • AUSIMM
    Determination of Traces of Tellurium in Rocks by Atomic Absorption Spectroscopy After Volatilization with Synthetic Pyrite

    This method determines tellurium at concentrations down to 0·01 p.p.m., with geochemical accuracy. Tellurium is volatilized from the rock at 800°C in the presence of sulphur from decomposing

    Jan 1, 1969

  • AUSIMM
    Exerting the Advantages of National Key Discipline, Outstanding the Training of Engineering Capability, Cultivating Talent to be with Innovation Ability

    Exerting the Advantages of National Key Discipline, Outstanding the Training of Engineering Capability, Cultivating Talent to be with Innovation Ability

    Sep 13, 2010

  • AUSIMM
    Effective Mining Project Management Systems

    By C Adams

    Reports of delays and cost blowouts in major study and construction projects are becoming increasingly prevalent in the resources industry. This is mainly being attributed to an escalating cost enviro

    Jan 1, 2006

  • AUSIMM
    Numerical Modelling of Monorail Support Requirements in Decline Development

    This paper discusses support requirements for the proposed monorail system to be used in decline development. The monorail drilling and loading systems are systems that move on the rail (monorail) ins

    Dec 6, 2010

  • AUSIMM
    The Aberfoyle Vein System Rossarden, Tasmania

    The Aberfoyle Tin Mine lies on a wide sloping bench about 2,000-2,500 ft. above sea level, at Rossarden, 14 miles north of Avoca, in north-eastern Tasmania. The quartz-cassiterite veins were discovere

    Jan 1, 1957

  • AUSIMM
    Dip Sampling Cyanide Gold Bullion at the Sons of Gwalia Gold Mine, Gwalia, Western Australia

    The difficulty of accurately sampling cyanide gold bullion for valuation is well known, and nothing new or original is claimed in presenting this paper, but it was thought that a record of differences

    Jan 1, 1931

  • AUSIMM
    Dynamic Simulation of an Alumina Refinery

    Dynamic Simulation of an Alumina Refinery

    Sep 13, 2010

  • AUSIMM
    The importance of the shape, orientation and roughness of free faces in commercial blasting operations

    Blasts should be designed so as to maximise the percentage of charges which shoot to a free face (Le, to a pronounced rock/air interface).Free faces should be rough, parallel and reasonably near to bl

    Jan 1, 1986

  • AUSIMM
    A New Model to Improve Ore Grade Reconciliation Between the Exploration Model and the Mine

    The poor reconciliation between the values of estimated and actual grades can cause major economic losses to the mining industry. In a mining operation grade reconciliation is comparing the values of

    Dec 6, 2010

  • AUSIMM
    Notes on Practical Mining in Bendigo

    In undertaking to write a few notes on practical mining in Bendigo, the great quartz mining centre of Victoria, which just now is celebrating its fiftieth anniversary of gold mining, satisfaction must

    Jan 1, 1902

  • AUSIMM
    The Selection and Management of Contractors

    The mining industry in Australia frequently uses the services of specialist engineering and managing contractors and consultants for a majority of the work required for project development, from fea

    Jan 1, 1990

  • AUSIMM
    The Tectonics, Geology and Gold-copper Metallogeny of New Guinea

    By S L. Garwin

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Since the Eocene, New Guinea tectonics have been driven largely by the south-westerly-direc

    Mar 18, 2015

  • AUSIMM
    Removal of Iron Oxides from Bauxitic Ores

    A process was developed, on a laboratory scale, for the removal of iron oxides from Weipa pisolitic bauxite. The technique involves the chemical reduction ofthe iron oxides by carbon, followed by sele

    Jan 1, 1971

  • AUSIMM
    Sustainable Waste Rock Remediation and Revegetation - A Real-World Longitudinal Study Comparing ViroMine Technology to Standard Applications and Doing Nothing

    By D Blair, L Fergusson, G Barros

    "The purpose of this paper is to present the findings of a waste rock remediation program conducted at a gold mine in New South Wales (NSW) over a six-year period. The treatment of waste rock dumps in

    Jul 10, 2012

  • AUSIMM
    Structural Controls on Gold Deposition in the Hyde-Macraes Shear Zone at Round Hill, Otago, New Zealand

    The Hyde-Macraes Shear Zone (HMSZ) is low angle, duplex thrust system that has developed in a graphitic pelite schist within the Otago schist belt,

    Jan 1, 1993