Search Documents

  • SME
    Grouting For Groundwater Control Milwaukee Inline Project

    By Edwin F. Shorey, Richard F. Coon, Steven B. Fradkin

    Crosstown Interceptor Phase IA is the first deep tunnel element of the Milwaukee Inline Project. The tunnel contract includes 6,492 meters (m) of 9.1-m-diameter tunnel, two access shafts, and partial

    Jan 1, 1987

  • AUSIMM
    Mining Investment - How Industries Past Performance Limits Future Possibilities

    By R B. Turner

    The authors have studied and analysed many mineral resource and related projects in Australia. These studies have lead them to conclude that the past performance of many project developers does play a

    Jan 1, 1980

  • AUSIMM
    The History of Mining in Hong Kong

    By J S-L Chan, J C. T Chu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. In its industrial days, Hong Kong’s mining industry was thriving, benefitting from the mine

    Mar 18, 2015

  • AUSIMM
    Some Aspects of Suction Dredge Design

    Important factors in dredge design are the estimation of total head, and the determination of flow in and around suction nozzles and in pipe lines. Total head for the dredge pump is calculated from ve

    Jan 1, 1962

  • NIOSH
    OFR-14-78 Development Of Optimized Diffuser And Spray Fan Systems For Coal Mine Face Ventilation

    By Robert E. Wallhagen

    This report describes the results of a four year investigation into improved face ventilation systems for underground coal mines. The objective was to experimentally determine configurations for a dif

    Jan 1, 1977

  • AUSIMM
    Hydrocyclone Classification Studies of a Complex Nickel Ore

    By Nageswararao K

    A series of tests was carried out on one of the rock-pebble milling circuits treating complex nickel ores at Kambalda Nickel Operations of Western Mining Corporation. A mathematical model to describe

    Jan 1, 1981

  • SAIMM
  • AUSIMM
    Estimating the Cost of a Feasibility Study for a Mining Project

    The cost of preparing a feasibility study is notoriously difficult to estimate. Studies for mining projects are typically commenced when an exploration programme has identified a mineable resource a

    Jan 1, 1990

  • AIME
    Institute of Metals Division - On Coincidence Sites (TN)

    By H. P. Stüwe

    HE recent papers of Aust and Rutter112 have again brought to mind the importance of certain "special" orientation relationships between the lattices of two fcc crystals on the mobility of the grain bo

    Jan 1, 1962

  • SAIMM
    Design Of Primary Samplers For Slurries In Concentrators And Statistical Methods For Measuring Components Of Variance In Sampling

    By H. E. Bartlett

    In the operation of some flotation plants treating platinum ores it was found that there were imbalances between the inputs and outputs. The inputs and outputs were sampled as slurries and it was dete

    Jan 1, 2002

  • AUSIMM
    Maori Expectations for Consultation

    James Barnes is Managing Director of James Barnes & Associated Ltd which is a company that has invested ten years of development to provide developers with a transparent, user friendly consultatio

    Jan 1, 2000

  • NIOSH
    The Mineral Industry Of Other East African Countries - Burundi (5762e8c8-9f9a-4334-a3cd-7f4c0b3335ab)

    By Kevin Connor

    During 1986, the Government continued with efforts to ease the country's almost total reliance on coffee exports for trade revenues by allocating 45% of the Government's budget to commerce a

    Jan 1, 1988

  • SME
    Means and Methods for Tunneling Through Highly Squeezing Ground: A Case History of the Strenger Tunnel, Austria

    By Günter Huber, Bruno Mattle, Helmut Westermayr, Daniel Spöndlin, Max John, Nejad Ayaydin

    PROJECT DESCRIPTION Alignment The Strenger Tunnel forms part of the S16 four-lane expressway between Landeckand Bludenz. The construction of this important East-West connection started in 1973

    Jan 1, 2005

  • AUSIMM
    Potassium-Bentonite from Mount Kaputar, New South Wales

    Devitrification of a glassy volcanic ash equivalent to an alkaline trachyte in composition has resulted in the formation of an interstratified illite-montmorillonite with an 1:1\1 content of 1:4 as th

    Jan 1, 1967

  • SME
    Development Of An Automated Drill And Blast System

    By Dennis P. Martin, Michael M. Fitz, James E. Friant

    Methods for reducing the cyclic nature of drill and blast tunneling operations have been long needed. A miniature blasting system using 10 mm (.375 in.) holes, 0.91 m (36 in.) deep, and blasting only

    Jan 1, 1989

  • SME-ICGCM
    Innovative Tailgate Support For Heavy Ground: 11 Left Longwall Panel, Cyprus Shoshone Mine

    By Christopher C. Woomer

    Cyprus Shoshone Mine uses the longwall method to extract a deep, thick, pitching coal seam in the Hanna Basin of South Central Wyoming. The immediate, and main roof rock consists of weak, thinly-bedde

    Jan 1, 1995

  • NIOSH
    OFR-146(2)-82 Sprayfan System - Results Of Mine Testing - Volume III

    By W. E. Schroeder

    Two underground installations of the sprayfan system are described and evaluated. The spray fan proves capable of reducing by 1300 percent downtime due to high methane. Spray fan face ventilation at 2

    Jan 1, 1981

  • CIM
    Les Mines Selbaie Story Geology

    By J. J. Bouillon

    "Located in the northwestern portion of the Abitibi greenstone belt, Les Mines Selbaie is a copper-zinc (silver and gold) producer. Felsic tuffs host three are zones. Composed of sulphide veins and br

    Jan 1, 1990

  • SME
    Materials Flows Generated by Pyromet Copper Smelting

    By Thomas G. Goonan

    Copper production through smelting generates large volumes of material flows. As copper contained in ore becomes copper contained in concentrate to be fed into the smelting process, it leaves behind

    Jan 1, 2005

  • SME
    Rehabilitation of New Croton Aqueduct Shafts

    By W. James Marold

    The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are

    Jan 1, 2008