Search Documents

  • DFI
    Strengthening Of A Cardboard Machine Foundation In Kemi, Finland ? Summary

    By J. Hartikainen

    Kemi cardboard mill is founded on the alluvial bed of Kemi river at the north-eastern cost of Botnic Culf in Northern Finland. The alluvium consists of sandy and silty layers underlain by thick medium

    Jan 1, 2010

  • AUSIMM
    Long-term Stability of Mine Tailings, Macraes Mine, Otago: Comparison to a Geological Analogue

    By D Craw

    Bulk ore tailings from the Macraes gold mine gold extraction process are stored in a large (ca 0.6 km2, 80 m deep) mixed tailings impoundment whose pH is maintained near 8 by natural rock neutralizing

    Jan 1, 2000

  • CIM
    Bubble Load Measurement in the Pulp Zone of Industrial Flotation Machines - A New Device for Determining the Froth Recovery of Attached Particles

    By David Seaman, J-P Franzidis, Emmy Manlapig

    "A new device has been developed to directly measure the bubble loading of particle-bubble aggregates in industrial flotation machines, both mechanical flotation cells as well as flotation column cell

    Jan 1, 2004

  • AUSIMM
    Modern Prospecting on an Industrial Scale

    MR. W. E. WAINWRIGHT occupied the chair, and in introducing the lecturer said, on account of the absence of the vice-president, it fell to his lot to introduce the lecturer. Mr. Tennberg, he said, was

    Jan 1, 1930

  • ISEE
    Destructive Wave Interference in Underground Blasting Utilizing Precise Timing.

    By Kurt Oakes, Paul Worsey, Braden Lusk, Tony Brasier, Jerry Chambers, Scott Crabtree, Randy Wheeler

    Destructive wave interference has been studied in theory for many years. In application however, limited information can be found. Recently, circumstances have enabled a multidisciplinary team to util

    Jan 1, 2006

  • SAIMM
    A Review Of Undergraduate Teaching And Postgraduate Research In Pyrometallurgy At The University Of Stellenbosch

    Keywords: Stellenbosch, university, teaching, research The pyrometallurgical activities at Stellenbosch University are reviewed in this paper. The history of the activities, both in teaching and r

    Jan 1, 2006

  • CIM
    Grinding Circuit Improvements at Barrick Goldstrike’s Roaster Facility

    By Jim Wickens, Andy Cole, John Pekrul

    "The roaster facility at Barrick Goldstrike Mine treats double-refractory sulfidic/carbonaceous gold ore. Prior to oxidation in the roasters, the ore is ground in two parallel dry grinding circuits ut

    Jan 1, 2003

  • CIM
    Unlocking Value through Flotation Equipment Maintenance

    By P. Tolvanen, A. Jalili

    "When hard times strike in the mining cycle, sites tighten their belts and focus on lowering their unit costs. Lower unit costs can be achieved by reducing expenditure, increasing production, or by a

    Jan 1, 2015

  • AUSIMM
    Improvements in Flotation Cell Maintenance, Power Consumption and Operation at South32 Cannington

    By M Bird, B Oats, M Sganzerla

    Mining operations are continually aiming to reduce operating costs to improve plant profitability. One way in which the Cannington operation sought to achieve this was by increasing the wear life and

    Sep 7, 2015

  • ISEE
    Blasting in Congested Areas

    By David Miller, James Santoro

    Blasting is often required in urbanized areas to allow for economical execution of construction, demolition, and mining. Several examples of operations that require blasting in built up areas include

    Jan 1, 2000

  • SME-ICGCM
    Roof Bolter Rocker Pad Deflector Systems (6ff5d1f9-2211-4169-8a90-2ad9493ee24a)

    By Arnold Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby

    Jan 1, 2009

  • SME
    Method To Evaluate Liberation Characteristics Of Feed In A Jigging Plant

    By A. K. Mukherjee

    The roles of pulsating mechanisms such as the amplitude and frequency of the jig cycle are well established in jigging. Also well established are the roles of the size ratio and the volume fraction of

    Jan 1, 2008

  • DFI
    Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a Dam

    By Lok M. Sharma, Deep K. Khatri, Bradfield. Brett

    "A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu

    Jan 1, 2017

  • SME
    TBM Excavability: Prediction and Machine–Rock Interaction

    By Z. T. Bieniawski, José Miguel Galera, Benjamín Celada

    TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj

    Jan 1, 2007

  • DFI
    Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)

    By Tracy Brettmann

    Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2004

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • NIOSH
    RI 2277 Selected Bibliography on Oil Shale

    By E. H. Burroughs, M. J. Gavin

    The references in the following compilation are selected chiefly from the literature of the years 1915-1920 , though a few of the more valuable standard works published before that period have necessa

    Sep 1, 1921

  • DFI
    Advantages of Design in Drilled Displacement Type Piles in Tropical Porous Soil Deposits

    By Jean R. Garcia, Paulo J. R. Albuquerque, Renato P. Cunha, Osvaldo Freitas Neto

    "Abstract Results obtained from in-situ load tests carried out on drilled displacement piles sunk in a porous, lateritic and unsaturated soil deposit, are analyzed in this paper. Three slow-maintained

    Jan 1, 2014

  • IIMP
    Monitoreo de convergencia en ambientes propensos a estallido de rocas en la mina Casapalca

    By José Díaz Barrios

    El proceso de la explotación minera de la veta Oroya Techo, perteneciente a la mina Casapalca, ha generado un desequilibrio del macizo rocoso, donde la energía que la roca de la caja, piso y techo (vo

    Sep 12, 2005

  • ISEE
    Development of Light ANFO

    By Yasunori Kosaka, Junya Tokita, Aramaki Shosaku, Inoue Junji

    Light ANFO that satisfies blasters and customers who want to reduce the amount of explosive consumption without changing blasting effects and designs and passes Cap sensitivity test regulated by law.

    Jan 1, 2002