Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Coal Dust Particle Size Survey Of U. S. MinesBy Michael J. Sapko, Gregory M. Green, Kenneth L. Cashdollar
The National Institute for Occupational Safety and Health (NIOSH) and the Mine Safety and Health Administration (MSHA) conducted a joint survey to determine the range of coal particle sizes found in d
-
MLA 44-82 - Mineral Resource Potential Of The Freel Peak Rare II Area (No. 5271), El Dorado County, California ? SummaryBy Thomas J. Peters
In 1979 and 1980, the U.S. Bureau of Mines and U.S. Geological Survey conducted a mineral survey of the 15,600 acre (6,310 ha) Freel Peak RARE II area (No. 5271) in the Lake Tahoe Management Unit. T
Jan 1, 1982
-
MLA 47-83 - Mineral Investigation Of The Scodies Rare II Area (No. 5212), Kern County, California ? SummaryBy Donald O. Capstick
The U.S. Bureau of Mines conducted an inventory of the prospects and mineral resources in the Scodies RARE II area (No. 5212) in 1982. No mineral production is recorded from the area, and no mines are
Jan 1, 1983
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing MethodsBy Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
OFR-115-93 Application Of Cost Engineering To Determine The Optimum Production Rate For Waste Remediation Of Mine TailingsBy Thomas W. Camm
The U.S. Bureau of Mines has developed a system for estimating mining and processing costs as a function of process feed rate with the objective of applying this system to abandoned mine tailings and
Jan 1, 1993
-
ISO 26000 Does It Make a DifferenceBy Joanne G. Petrini
ISO 26000 Unique Process Unique Personality ?Almost 10 years in the making ?What type of standard is this? Different type of ISO Standard ISO 26000 Structure and Substance ?Principles ?Core Su
May 1, 2011
-
OFR-19-76 Development Of A Prototype Instant Working Level Meter With Automatic Individual Radon-Daughter Readout ? 1.0 IntroductionBy Peter G. Groer
The commonly used exact methods (1-2) to determine the WL measure the total a activity or the total number of a counts during three preselected time periods. Due to the half-lives involved (TRaB = 26.
Jan 1, 1975
-
OFR-31-86 Conveyor Belt Dust ControlBy Vinit Mody
The belt conveyor is one of the major pieces of equipment for transferring bulk material in mining operations. However, considerable amount of respirable dust may be generated whenever the bulk materi
Jan 1, 1984
-
Twenty-Four Conferences; More Than One-Hundred And Seventy Papers; Understanding Roof Bolt Selection And Design Still Remains PricelessBy Stephen C. Tadolini, Raymond A. Mazzoni
The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten
-
Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058By D. McBride
Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists
Jan 1, 2009
-
Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen
This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr
Jan 1, 2004
-
Electronic Detonators Technology of the FutureBy Aloke Verma, R. Singh, S. Jana, C. Sawmliana, P. Pal Roy
On July 21, 2004, a trial blast using electronic detonators was conducted in India for the first time in an opencast mine at Pundi-E Quarry of TISCO, West Bokaro. Orica-IEL conducted the test using el
Jan 1, 2006
-
Innovative Use Of Piles For Retaining Sides Of Deep Excavations ? SynopsisBy D. V. Karandikar
Contiguous bored piles have been used in the past for retaining the sides of deep excavation. An innovative version of this method was adopted successfully in two prestigeous projects in Bombay in whi
Jan 1, 1996
-
Specifications For Initial Support In Rock TunnelsBy William F. Daly, William H. Hansmire
Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a
Jan 1, 1985
-
Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? SynopsisBy M. Pernot
A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati
Jan 1, 2010
-
Information As An Alternative To Mineral Rights TaxationA new system for granting access to mineral rights is proposed in the recently released White Paper, ?A Minerals and Mining Policy for South Africa?. Official policy states that ?Government?s long-ter
Jan 1, 1999
-
Establishing Geotechnical Baseline Values for Deep Soft Ground TunnelsBy John E. Newby
The Brightwater Conveyance System consists of four tunnel segments in three tunnel con-tracts, comprising over 21,760 m (71,400 ft) of pressurized face tunneling in complex glacial and non-glacial sof
Jan 1, 2008
-
Environmental Impact Of Digging And Loading Equipment In Surface Coal MiningBy A. Lashagri
This paper presents research results on assessment of environmental impact of digging and loading equipment in surface coal mining. Environmental impact is accessed through the equipment exhaust and d
Feb 27, 2013
-
Keynote Address for 24th International Conference on Ground Control in Mining, August 2- 4, 2005 - Like Deja Vu All Over AgainBy Peter B. Lilly
Thank you, Syd, for the kind introduction and for inviting me to give the Keynote Address at this very prestigious gathering of some of the finest intellect and talent in the domestic and internationa
Jan 1, 2006
-
Numerical modeling of Hydro-Mechanical fracture behaviorBy A. Pellegrino, F. Collin, C. Guiducci, R. Charlier
A numerical approach for modeling coupled Hydro-Mechanical fracture behavior in 2D is presented in this paper. This approach accounts for the strong dependence of the flow characteristics on fracture
Jan 1, 2003