Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Large Flotation Cells In The Copper Processing Industry ? Recent Experiences And Future Considerations (Part 1)By D. Govender
In recent years, economies of scale have continued to drive copper projects to larger throughputs to offset depleting lower grade resources. A decade ago there were only a small number of projects tha
Feb 27, 2013
-
Planning for Rehabilitation of Lands Disturbed by Alluvial Gold Mining on the West CoastBy A Tinnelly
Land disturbed by alluvial gold mining should be restored to a capability or productivity as good as that which existed prior to disturbance. Effective rehabilitation requires detailed planning
Jan 1, 1989
-
Hoist rope improvements through thermo plastic enhancementBy Bill Parnell
"Friction winders and double drum winders have been used in the vertical shaft mining industry for over 100 years. In that time, there have been many changes made in the electronic and mechanical fiel
Jan 1, 1995
-
WMATA Use Of The New Austrian Tunneling Method For Lining And SupportBy Larry H. Heflin
The Washington Metropolitan Area Transit Authority's Wheaton Station and tunnel design was completed and offered for bid in the Spring of 1983. The format was unique to the Authority: a four part
Jan 1, 1985
-
Predicting Accident Susceptibility: A Logistic Regression Analysis Of Underground Coal Mine WorkersBy J. Maiti
This study examined the group differences in accident susceptibility among underground coal mine workers accounting for their personal and workplace characteristics. A logistic regression model was us
Jan 1, 2001
-
The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power StationBy H. F. Cowie
Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of
Jan 1, 1989
-
Underground Applications Using the New EZDrifter Dual Delay Detonator SystemBy Pierre L. Labelle
Non electric Dual Delay initiators have revolutionized many aspects of underground mining. The units are used in all types of underground blasting operations. Some operations, due to the complexity an
Jan 1, 1994
-
A New Technique For Mining OilBy Gordon B. French, Donald E. Garrett
INTRODUCTION Crude oil reserves in the United States are still very large, even though for many years they have not been sufficient to supply our entire domestic requirements. They are continuously
Jan 1, 1983
-
Gestión de riesgosBy Juan Antonio Huamán Fernández
De acuerdo al estudio que realizó la Dirección General de Minería del Ministerio de Energía y Minas en el Perú, las estadísticas de accidentes fatales reportadas a escala nacional en el 2002 indican q
Jul 31, 2003
-
Simulators Improve Mine Operator Training and SafetySimulator technology has advanced to the point where the cost of mining equipment simulators is beginning to make commercial sense. Simulator-based evaluation allows operators or potential employees t
Jan 1, 2003
-
Recent Operation Of The Flash Smelting Furnace At Saganoseki SmelterBy Yushiro Hirai
Saganoseki smelter & refinery had operated two flash smelting furnaces from 1973, attaining 330,000 mtpy of copper production in 1989. In 1996, however, it carried out a "integration of two flash furn
Jan 1, 1999
-
Use Of Large Diameter And Long Steel Pipe Piles In Japan ? SynopsisBy K. Kawakami
In Japan, pile foundations have been used extensively for buildings, bridges and port facilities. A large number of steel pipe piles were first used in the 1960's and the amount of steel used in
Jan 1, 2010
-
The Design And Construction Of Large Diameter Base Grouted Piles In Thanet Sand At Blackwall Yard, LondonBy J. A. Yeats
This paper describes the loading to 25MN of a 1.2m diameter bored cast-in-situ test pile founded in the Thanet Sand which was base grouted. The pile was sleeved over the major portion of its length to
Jan 1, 1989
-
Characterization Of The Leaching Properties Of A Uranium Leaching PulpBy J. Roodt
Paper written on project work carried out in partial fulfilment of B. Eng (Metallurgical Engineering) degree This work was done to characterize the leaching of a uranium containing pulp processed b
Jan 1, 2003
-
The Long March - Obtaining and Mining Privilege in New ZealandMining is both a high risk and a long term business. This is dramatically illustrated by the fact that, on average, the explorer will expend over $30 million in a ten year period for each significant
Jan 1, 1982
-
Industrial Section (2c3453a1-3f7f-4542-8ccc-838f254e36e5)Preheating Feature of Leyner Oil Furnace for Heating Drill Steel The No. 3 Leyner oil-burning furnace, used for heating drill steel, is now made with a preheating chamber. By this addition it is clai
Jan 3, 1916
-
Recovery of Components and Valuable Metals from Printed Circuit BoardsBy A. Gibson
Most methods for the treatment of scrap printed circuit boards do not reclaim the components in working order as the boards are either fed to a copper smelter, to recover the valuable elements, or, si
Jan 1, 2009
-
Fibrous Reinforcement In Clay-Bonded Silicon Carbide Refractory Using Andalusite PowderBy Bowen Li
Silicon Carbide is an excellent refractory material. Its physical properties make it extremely useful, particularly in applications where corrosion resistance and wear are important considerations. Co
Jan 1, 2006
-
Dripping Into Subterranean Cavities From Unsaturated Fractures Under Ventilated ConditionsBy R. Fedors, T. Ghezzehei, D. Or
The phenomena of dripping into cavities (e.g. tunnels and drifts) within an unsaturated fractured porous medium under ventilated conditions is studied to improve estimates of dripping rates, drop size
Jan 1, 2000
-
The Effect of SMS Composition on Their Density Properties for Resources EstimationBy Irina Dobretsova, Anna Sukhanova, Anatoly Kondratenko, Svetlana Babaeva, Sergey Andreev
"With the acceptance of an application and a signed contract for prospecting deep-sea sulfides (2012) between the Russian Federation and the ISA, at present it is particularly important to assess the
Jan 1, 2017