    RI 8761 Effect of Asymmetric Wear of Point Attack Bits on Coal-Cutting Parameters and Primary Dust Generation

    By Wallace W. Roepke

    The Bureau of Mines conducted a series of experiments using Illinois No. 6 coal to determine the effect of asymmetric wear on airborne respirable dust (ARD), specific energy, cutting force, and normal

    Jan 1, 1983

  • NIOSH
    MLA 49-86 - Mineral Resources Of The Big Jacks Creek Study Area, Owyhee County, Idaho ? Summary

    By Richard A. Winters

    In 1985, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied 49,875 acres of the 54,833-acre Big Jacks Creek Wilderness Study Area (ID-111-7C) in order to evaluate t

    Jan 1, 1986

  • NIOSH
    RI 7085 Face Ventilation In Underground Bituminous Coal Mines - Airflow Characteristics Of Flexible Spiral-Reinforced Ventilation Tubing

    By R. G. Peluso

    Methods and results of studies to determine friction and shock losses encountered in auxiliary face ventilation systems utilizing flexible, spiral-reinforced ventilation tubing are presented. The resu

    Jan 1, 1968

  • SME
    Advanced Dewatering Methods For Energy Savings In The Mineral Processing Industry

    By G. Luttrell, S. Keles, M. Eraydin, R. Yoon

    The dewatering of fine particles is energy intensive and often requires costly capital expenditures. To address these issues, a series of advanced dewatering technologies have been developed at Virgin

    Jan 1, 2007

  • AUSIMM
    Assessing Sustainability of Gold Mining Operations Using Fuzzy Logic Methodology

    By L Lorenzen

    In this paper, we developed and implemented a fuzzy logic expert system capable of evaluating the degree of sustainability within the context of gold mining operations. The newly introduced approach o

    Jan 1, 2007

  • AUSIMM
    Permanent Excavation Support Using Cement Grouted Split Set Bolts

    A series of in situ pull tests has been conducted to determine the holding capacity of the standard SS46 Split Set Stabilisers. The experiments have been conducted in a wide range of geological condit

    Jan 1, 1997

  • SME
    Financing Mining Projects KfW IPEX-Bank’s Approach in Assessing Credit Risks Relating to Questions of Sustainability

    By P. Klaus

    "KfW IPEX-Bank is the commercial arm of KfW Bankengruppe, responsible for international project and export finance.KfW was one of the first banks in Germany to promulgate environmental guidelines for

    Jan 1, 2005

  • TMS
    Studies Of Heat Exchange Within The Working Space Of An Electric Nickel Anode Refining Furnace

    By Valery M. Paretsky

    The effect of the degree of nickel oxide reduction and the reaction gas composition on the furnace productivity has been estimated by computations and the established relationship is in good agreement

    Jan 1, 2005

  • SME
    Gold Fields La Cima Cerro Corona Project Building For Perú’s Future

    By R. Graeme, J. Komadina

    Gold Fields acquired an option to purchase the Cerro Corona Project, located in Hualgayoc, Cajamarca Department, Perú, in December 2003. In January 2006, the option was taken up and the transaction c

    Jan 1, 2007

  • IMPC
    New Test Method for Investigation of Grindability in Alkaline Media at High Temperature

    By József Faitli, Barnabás Csoke, Károly Solymár, Zoltán Hatvani, Dimitri Papanastassiou

    In most cases, the sizing of dry or wet mills for ore processing is primarily based on the determination of the Bond grindability index, using the Bond-Kjos-Rowland relations. In several cases, grindi

    Jan 1, 2003

  • ISEE
    Demolition of a Storehouse by the Blasting and the Simulation of the Demolition by DDA Method

    By Kunihisa Katsuyama, Yuji Ogata, Yuji Wada

    The one free surface blasting of a concrete block was simulated by Discontinuous Deformation Analysis(DDA) method. Comparing the simulated results with the concrete block blasting experiment, the crac

    Jan 1, 1996

  • SME
    Transfer Of A Project Risk Register From Design Into Construction: Lessons Learned From The WSSC BI-County Water Tunnel Project

    By R. J. F. Goodfellow

    Many underground projects now include preparation of a Risk Register through planning and design as a tool for project and risk management. There is still significant discussion within the industry as

  • CIM
    Mill Speed Control for More Efficient Grinding

    By V. K. Gupta

    "Effect of mill speed on grinding kinetics has been investigated with a view to using mill speed as a manipulated variable for control and optimization of the grinding circuit performance under variab

    Jan 1, 1985

  • AIME
  • AUSIMM
    Taking it to the Streets - Recent Experiences of Participation in the Initiation

    Newmont Waihi Operations is participating in the initiation of a community liaison forum in association with the local district council. The objective is to provide a forum for the free and regular e

    Jan 1, 2003

  • CIM
    The Effect of Disposal Configuration on the Environmental Behavior of Paste Tailings

    By Thomas Deschamps

    The main objective of this work was to investigate the effect of binder addition on the geochemical properties of surface paste tailings. Nine leaching columns were prepared following different dispos

    May 1, 2007

  • NIOSH
    Cabs With Powered Height Adjustment (Rail Mounted) - Objective

    Provide optimum visibility of mining operations while maintaining protection and comfort for ma-chine operators. Approach Cabs and canopies with hydraulically powered variable-height control w

    Jan 1, 1978

  • CIM
    Cyanide Recovery and Detoxification Study on Seabridge Gold’s KSM Project

    By Dean Lindsay, Inna Dymov, Mariam Melashvili, Jim Smolik, Chris Fleming

    "This paper presents results from the proposed cyanide detoxification circuit for Seabridge Gold’s KSM project. The proposed flowsheet uses a two-stage CCD (counter-current washing/decantation) circui

    Jan 1, 2015

  • AUSIMM
    Grinding Mill Operation and Maintenance - Central to Asset Management

    Grinding Mill Operation and Maintenance - Central to Asset Management Since 2005, RME has pursued a vision for a new grinding plant operational paradigm, made possible by RME's latest Mill Relin

    Sep 13, 2010

  • CIM
    Problem Identification for Low Gold Recovery and Application of Treatment at Somita Plant

    By B. Roy

    The Somita plant processes low sulphide gold ore in Burkina Faso with a CIL process. After experiencing recurrent low gold recoveries, Somita undertook an investigation on the source of the problem. C

    Jan 1, 2014