Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
An algorithm for quantifying regionalized ore grades - SynopsisWe present a novel hybrid algorithm for quantifying the ore grade variability that has central importance in ore reserve estimation. The proposed algorithm has three stages: (1) fuzzy clustering, (2)
Jan 1, 2008
-
The Use of Computational Fluid Dynamics and Discrete Element Modeling to Understand the Effect of Cell Size and Inflow Rate on Flotation Bank Retention Time Distribution and Mechanism PerformanceBy Richard Peaker, Jens Lichter, Alexander V. Potapov
"The recent combination of Computational Fluid Dynamics (CFD) and Discrete Element Modeling (DEM) can provide considerable insight into the performance of flotation cells. One area of interest from a
Jan 1, 2007
-
Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load TestsBy Jesús E. Gómez
This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa
Jan 1, 2008
-
Basic aspects of nickel extraction from chromitiferous overburdenBy B. R. Reddy, Y. V. Swamy, B. V. R. Murthy, H. S. Ray
The Ni oxide was reduced with a CO-CO2-N2 gas mixture and the effects were observed of process variables such as roasting temperature, time and CO partial pressure. Extraction of over 90% of Ni was ac
Dec 1, 1995
-
A Slope Stability Analysis For The Trojan Pit Expansion At The Wharf Resources Mine, Black Hills, SDBy V. L. Franzen, Z. J. Hladysz, C. A. Kliche
The Wharf Resources mine, located in the Bald Mountain Mining District approximately 6.4 km (4miles) west of Lead, South Dakota, has operated a surface gold and silver mine and heap leaching processin
Jan 1, 2000
-
Controlled chloride cracking of austenitic stainless steel tube samples - SynopsisBy M. S. Raseroka
An experimental rig has been constructed to produce chloride stress corrosion cracks in Type 304L stainless steel tube samples. The samples are to be used to test possible in situ repair methods in fu
Jan 1, 2009
-
Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, WashingtonBy Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson
A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR
Jan 1, 2005
-
Beneficiation of Marble From Griekwastad, Northern Cape ProvinceBy N. P. Mahumapelo
This paper is based on a study to determine the potential beneficiation opportunities for marble from Griekwastad in the Northern Cape Province. The marble was characterized mineralogically by X-ray
Jan 1, 2014
-
Development and Testing of a More Effective Froth Handling PumpBy R. J. Visintainer, W. L. Whitlock
"Difficulties with the sizing and operation of centrifugal froth pumps are common and the underlying fluid dynamics are complex. Design and selection often relies on previous experience, offering unre
Jan 1, 2012
-
Study of a Two-Stage Smelting Reduction Process for Ironmaking by a Thermochemical ModelA thermochemical model is developed to study the two-stage smelting reduction process for ironmaking without post-combustion. Steady-state multi-material and heat balance equations are solved simult
Jan 1, 1999
-
Pillar And Roof Bolting Design Under Conditions Of Weak Roof And Multi-Seam Interaction - A Case StudyBy Y. Q. Zhang, S. S. Peng
Numerical modeling was used to design the pillars and bolting plan for a mine with weak roof and multi-seam stress condition. Previous mining experience, pillar/roof yielding and in-situ horizontal st
Jan 1, 2004
-
Engineering And Construction Of The Goldstrike Roaster FacilityBy B. Burke, R. Colquhoun, K. Thomas, R. Walton, D. Fentie
The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,
Jan 1, 2001
-
Are Nanoparticulates Present In Typical Mineral Processing Practices And Can They Be Suppressed?By C. R. Copeland
Airborne dust emission standards are receiving growing attention. This trend is motivated by significant health studies that have shown adverse health effects due to exposure to dust. Currently, the a
Jan 1, 2007
-
Fuel cell versus diesel loader operation: Cost-benefit analysis studyBy M. C. Bétournay
Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles an
May 1, 2005
-
Advanced Technology in Mining EducationGeneral recognition of the potential benefits of utilizing advanced technology has focussed public attention on the organisation of tertiary education. This has produced a situation where opportuni
Jan 1, 1989
-
Some Aspects of the Genesis of the Iron Duke Iron Orebody and Associated RocksThere is an alternative theory of the high grade orebodies of the Middleback Group, based on the primary nature of the high grade ores in an area of carbonate deposition, with lesser amounts of silice
Jan 1, 1963
-
Oxygen refining of silver-copper alloysBy C. A. Pickles, J. M. Toguri
The refining of two molten Ag-Cu alloys, containing 7.5 and 11.2 mass% Cu, with a borosilicate slag was investigated using both air and pure O2 to determine the effects of the following variables: flo
Dec 1, 1995
-
Fuel cell versus diesel loader operation: Cost-benefit analysis study (6b80a653-d0e2-439c-a343-5c05fb591d61)By G. Righettini, G. Desrivières, P. Mousset-Jones, R. Lacroix, M. C. Bétournay, P. Laliberté, S. Hardcastle
"Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles a
Jan 1, 2005
-
Dynamic Testing Results Indicator Pile Test Program --I-880 - IntroductionBy D. Michael Holloway
The California Department of Transportation (CALTRANS) evaluated several pile foundation schemes for supporting the structures along the realignment of Interstate 880. The project replaces the double-
Jan 1, 1995