Journal: Vibration and Seismograph Section / Use of GPS and GPS Exchange Format Files in PennsylvaniaBy Rick Lamkie
When investigating citizen complaints about blast vibration and airblast, it is important to be able to establish the spatial relationships between blasts, blasting seismographs monitoring the events,
Jan 1, 2008
-
Improving Energy Efficiency in Barrick Grinding Circuits (309a678f-c2fc-4f23-900a-4b50d1de7610)By Christian Brits, Bob Blain, Lloyd Buckingham, Juliu Stieger, Jean-Francoi Dupont
Barrick Gold Corporation (Barrick) has undertaken innovative methods of evaluating and improving the performance of grinding mills in several of its operations around the world. The results have been
Jan 1, 2012
-
Transformation of Iron Oxide By-Products During the Becher Process (dc24a04d-bdb5-4804-9a16-35fc2c57fc49)By Gibbons S. L, Ritchie I. M, Murr D. M
Fundamental studies on the transformations of iron oxides have been carried out and related to the solution conditions in the Becher process. The results show that a number of iron oxide interconversi
Jan 1, 1990
-
Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]By Joseph A. Whitchurch
The N20 to N25 Tunnel (basic) segment was the second tunnel contract awarded for construction by The PB/MK Team. This project embodied 3.9 km (2.4 miles) of tunnel and was located within the northwest
Jan 1, 1995
-
Hydraulic Pressure Information Monitoring System for Underground SupportsBy Lin Bin, Qain Minggao, Qu Qundi, Yao Zhichang
This paper describes the application of a 89C52 chip microcomputer in hydraulic pressure information monitoring system of powered supports in a coal face, and the details of circuit and software of
Jan 1, 1998
-
Ground And Liner Behavior During Construction Of The Mt. Baker Ridge TunnelBy Alexander I. Feldman, Michael S. Kucker, Robert A. Robinson, Harvey W. Parker
An extensive geotechnical monitoring program was used to assess ground and liner behavior, provide input to a Disputes Review Board, and verify design assumptions during construction of the Mt. Baker
Jan 1, 1987
-
Power Generation Utilising Mines GasBy Callinan AN
Broken Hill Proprietary Company Limited have recently commissioned a 14 Megawatt power station adjacent to its underground coal mining operation at Appin NSW. The power station is fuelled by metha
Jan 1, 1987
-
An Assessment Of Swelling On Reduction Methods For Iron Ore PelletsAn assessment has been made of six reported methods for the determination of the swelling of iron ore pellets on reduction. The methods are discussed on the basis of apparatus requirements, reducti
Jan 1, 1974
-
Pneumatic Stemming of Horizontal Holes with Particulate MaterialBy Clay McNail, Paul N. Worsey, John Schillie
"This paper is the result of undergraduate student research over the period of 2 semesters at UMR, which was focussed on developing a practical way to pneumatically stem horizontal boreholes, mostcomm
Jan 1, 1999
-
Inspection and rehabilitation of the Daly-Judge Tunnel, Park City, UtahThe Daly-Judge Tunnel, begun in 1887 to drain mine workings, is now a source of potable water for the Municipality of Park City. The water is exceptionally clean; however, when roof falls occur, suspe
Jan 1, 2006
-
Cemented Hydraulic Fill Mix Design As it Applies To Mine SchedulingThe need to schedule ore production to make maximum use of the strength gained by cem- ented fill during curing is discussed, to show how cement content and hence fill cost can be kept down for any
Jan 1, 1973
-
Nordberg MP1000 A 1000HP Cone CrusherNordberg has conducted extensive research, during 1982-85, on the effects of cone crusher variables such as speed, throw and cavity design on the productivity of the crushers. Simultaneously, Nordbe
Jan 1, 1988
-
Geology, Genesis And Bauxite Reserves Of West Kalimantan, IndonesiaBy Johan K. Rodenburg
A major bauxite belt was discovered and evaluated from 1969 to 1974 by P. T. Alcoa Minerals of Indonesia in West Kalimantan, Indonesia. The proven reserves of beneficiated bauxite are 800 million tons
Jan 1, 1984
-
Utilizing Strain Criteria To Predict Highwall Stability Performance (10e369fc-18a0-48fc-b1e4-6da683b035af)By H. W. Newcomen, D. R. Brox
Assessments of the stability performance of open pit highwalls have traditionally been based on consideration of surface movement rates. Although generally accepted in industry, this approach presents
Jan 1, 2004
-
Finite Element Modelling Of Cavity Behaviour In The Solution Mining Of Magnesium SaltsBy P. K. Currie, J. V. Walters
Solution mining of magnesium salts (Carnallite and Bischofite) is taking place near Veendam, in the northeast Netherlands. The magnesium salts are used for the production of magnesia sinter, used as a
Jan 1, 1985
-
Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? SynopsisBy Y. Z. Wang
Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2
Jan 1, 2010
-
El Brocal Overland Conveyor: Control System Re-design and ImplementationBy Bradley Lawson
This case study examines the control system re-design and network modifications implemented by Conveyor Dynamics Inc. on the original El Brocal Overland Conveyor system to resolve problems associated
Sep 1, 2017
-
Preparing the section foreman for his full responsibilitiesBy R. L. Grayson, R. C. Althouse, M. J. Klishis
The health and safety of employees, efficiency of the operating system, and production are paramount goals in underground coal mining. The section foreman assumes responsibility for making his part of
Jan 1, 1987
-
Extending Surface Coal Reserves Through Highwall Mining –Design, Planning, And Field PerformanceBy T. Vandergrift, J. Sturgill, W. Gerhard, J. Carrick
As surface minable coal is depleted, many operators look to high-wall mining to extend reserve life. Recent advances in highwall mining equipment have greatly improved productivity, clean coal recover
Jan 1, 2004
-
Planning & Financial Valuation Model and Framework for Sustainability InvestmentsAgenda ?The Context ?The Challenge ?The Solution ?Benefits and lessons learnt from pilots ?Next Steps The Context ?Facilitate management decision making process by supporting the development
May 1, 2011