Search Documents

Sort by

  • SAIMM
    Silicomanganese Production - Process Understanding

    By S. E. Olsen, M. Tangstad

    The main source of Mn in raw materials for SiMn production is Mn-ore and Mn-rich slag from the high carbon FeMn production. The amount of slag per tonne of SiMn metal is mainly determined by the ore/s

    Jan 1, 2004

  • DFI
    Environmental Impact Management Through Foundation System - Synopsis

    By Deshmukh A. M.

    Existence of human beings and their relationship with the nature is symbiotic. The lack of perspective and negligence of nature disturbs the equilibrium of environment and causes unprecedented disaste

    Jan 1, 1996

  • SME
    The Challenge Of Building Tunnel Boring Machines For The Eurotunnel Protect

    By David L. Shearer

    INTRODUCTON James Howden first secured an order for two Service Tunnel Boring machines in November 1986. These Tunnel Boring machines were 5.7 and 5.4 metres in diameter and the full length includi

    Jan 1, 1989

  • AUSIMM
    Spectroelectrochemical Investigation of Hydroxamate Reagents on Copper Oxide Minerals

    Spectroelectrochemical Investigation of Hydroxamate Reagents on Copper Oxide Minerals

    Sep 13, 2010

  • SME
    Production Of Lightweight Aggregate From Waste Materials (ee2a87da-befe-4bad-915f-b20cc6432f6f)

    By M. H. Weinecke, B. P. Faulkner

    This paper will discuss the process for making lightweight aggregate, the waste materials that make good lightweight aggregate, the chemistry of making lightweight aggregate and finally a discussion o

    Jan 1, 2001

  • SME
    The 1990’s – Politics and the Environment

    By Georgene Renner

    At the beginning of the 1990s, Communism fell and signaled the end of the Cold War. The world rejoiced but also watched and waited to see how those countries would restructure themselves. The 1990

    Jan 1, 2007

  • SME
    Masbate gold operation is site of first commercial heap leaching plant in Philippines

    By Libby R. Ricafort, Victorio V. Pato, R. S. Pizarro

    Introduction Atlas Consolidated Mining and Development Corp. (ACMDC) started gold production at its Masbate gold mine early in 1980. This involved an open-pit mine and a 3.5-k/d (3850-stpd) carbon-in

    Jan 9, 1987

  • AUSIMM
    Recovery of Rhenium from Mineral Raw Materials of Kazakhstan

    Recovery of Rhenium from Mineral Raw Materials of Kazakhstan

    Sep 13, 2010

  • CIM
    Environmental Planning in Mine Waste Management - The Huckleberry Mines Experience

    By Henri F. Letient

    At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to

    May 1, 2002

  • SME
    Closure Concerns at Sonora Mining’s Jamestown Mine

    By Alan Dahlstrand

    The Jamestown Mine is a 6.3-kt/d (7000-stpd) open-pit gold mining operation located in the central portion of California's historic Mother Lode district. Most early production from the Jamestown

    Jan 1, 1995

  • CIM
    Adapting to Ore Characteristics at Lac des Iles Mine

    By Erin N. Legault-Seguin

    The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000

    May 1, 2009

  • DFI
    On The Effects Of Sand Grading On Driven Pile Performance

    Precast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i

    Jan 1, 1989

  • AUSIMM
    Technical note-acid removal of manganous ion adsorbed on ore surfaces during microbial manganese dioxide leaching

    By Poi G, Madgwick J. C, Davis P, Pannowitz D, Cho D, MacKay B, Chan S. M, Varga R. A, Chun U

    Periodic dilute sulphuric acid treatment ofstill, batch-fed, molassesenriched, microaerobic, manganese-dioxide-Ieaching microbial cultures led to marked improvements over untreated cultures. Percentag

    Jan 1, 1986

  • NIOSH
    RI 9576 - Rock Mechanics Study of Shaft Stability and Pillar Mining, Homestake Mine, Lead, SD (In Three Parts)

    By M. E. Poad, M. M. McDonald, J. C. Johnson, W. G. Pariseau

    A U.S. Bureau of Mines case study of pillar recovery in high-grade ore near the Ross shaft at the Homestake Mine, Lead, SD, has demonstrated the usefulness of the finite-element method for evaluating

    Jan 1, 1995

  • SME
    An Investigation Into The Hydrological Behaviour Of Exposed And Covered Waste Rock Dumps

    By Bruno Bussière, Guosheng Zhan, Michel Aubertin, Vincent Martin, Robert P. Chapuis

    The study evaluates the hydrological behaviour of exposed and covered waste rock dumps. The objectives were to determine the major factors influencing unsaturated flow in waste rock dumps and covers,

    Jan 1, 2005

  • CIM
    A new approach to waste dump site selection according to the fuzzy decision-making process

    By F. Samimi Namin

    During the process of developing surface or underground mines, some sites are considered for dumping of surface soils, while others are applied to reclaiming surface and waste disposal. For each kind

    Jan 1, 2007

  • DFI
    Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge

    By Robb L. Swenson

    Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of

    Jan 1, 2005

  • DFI
    Plastic Piling

    By Magued G. Iskander

    The deterioration of concrete, steel, and timber is a serious hindrance to construction in marine and corrosive environments. Composite materials such as fiber-reinforced polymers (FRP) can offer perf

    Jan 1, 2002

  • SME
    Soft Rock Tunneling: Equipment Selection Concepts And Performance Case Histories

    By Priscilla P. Nelson

    Many concepts concerning equipment selection, performance prediction, and evaluation of support requirements for tunnel construction in soil or hard rock tunnels cannot be extrapolated directly for ap

    Jan 1, 1987

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001