Search Documents

Sort by

  • SME
    Optimization Of Multigravity Separation For Recovery Of Ultrafine Coal

    By M. Menéndez

    Enhanced gravity separation appears to be one of the most promising methods for processing all types of <200-µm coal feeds and tailings. Systems based on this technology are reviewed, and the results

    Jan 1, 2007

  • CIM
    Optimization of open pit short- and long-range production scheduling

    By Charle Pelley, Kosta Fytas, Peter Calder

    "A computer model has been developed which is capable of evaluating alternative production schedules (long- and short range) of an open pit mine once the ultimate pit limits have been defined. The mod

    Jan 1, 1987

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada&apos;s largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • SME
    Optimization Of Shovel Dipper-Formation Interactions In Excavation

    By S. Frimpong

    Shovel excavation constitutes a significant component of production costs in any surface mining operation. This makes shovel loading an important cost center that needs to be improved to lower product

    Jan 1, 2011

  • SAIMM
    Optimization of shovel-truck system for surface mining - Synopsis

    By S. G. Ercelebi

    In surface mining operations, truck haulage is the largest item in the operating costs, constituting 50 to 60% of the total. In order to reduce this cost, it is necessary to allocate and dispatch the

    Jan 1, 2009

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • SAIMM
    Optimization of shuttle car utilization atan underground coal mine

    By P. R. Segopolo

    "The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc

    Jan 1, 2015

  • SME
    Optimization of Tellurium and Antimony Extraction from Residue Generated in Alkaline Sulfide Leaching of Tellurium-Bearing Alkaline Skimming Slag Using Central Composite Design Mining, Metallurgy and Exploration (e0c562d4-30bd-4458-b8cb-8e6a1cd409aa)

    By Qinghua Tian, Zhipeng Xu, Dong Li, Xueyi Guo, Liu Zhu

    A possible process for extracting tellurium and antimony from a residue generated in alkaline sulfide leaching of telluriumbearing alkaline skimming slag was proposed. The central composite design was

  • SAIMM
    Optimization of the compaction of hard-metal powder for the production of cutting tool inserts - Synopsis

    By K. Blaski

    his paper reports an investigation aimed at optimizing the compaction of granulated hard-metal powder for the production of cutting tool inserts. The optimal compaction is that which yields optimal sh

    Jan 1, 2007

  • SAIMM
    Optimization of the Cycle Time to Increase Productivity at Ruashi Mining

    By H. Thomas, I. N. M. Nday

    "*Paper written on project work carried out in partial fulfilment of BSc.Eng (Mining Engineering) degreeThe optimization of the cycle time to increase productivity at Ruashi Mining was an on-site proj

    Jul 1, 2019

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Optimization of the Froth Washing System of Columns in the Rougher Circuit of the Miduk Copper Concentrator

    By M. Massinaei

    Recently constructed circuits have included multiple stages of columns in a variety of applications, from roughing to cleaning. The Miduk copper concentrator (in south-eastern Iran) is one of the uniq

    Jan 1, 2007

  • CIM
    Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing Plant

    By Willemijn Husslage

    Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000

    May 1, 2011

  • SME
    Optimization Of The Hydraulic Design Of Thickener Feedwells Applying Computational Fluid Dynamics And Experimental Techniques

    By L. Echeverri

    Research studies have shown that the flow within feedwells displays a vortical structure and high velocities at the locations where standard tangential inlets force its way into the feedwell swirling

    Jan 1, 2012

  • SAIMM
    Optimization Of The Operating Density And Particle Size Distribution Of The Cyclone Overflow To Enhance The Recovery Of The Flotation Of Copper Sulphide And Oxide Minerals ? Synopsis

    By F. Ntengwe

    The Konkola Mine, a subsidiary of the Konkola Copper Mines Plc (KCM) which is owned by the Vedanta group of companies of India and Zambia Consolidated Copper Mines Holding limited, is located at Chili

    Jan 1, 2011

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • TMS
    Optimization Of The Pig Iron Desulfurization Inside A Torpedo Car By Physical Modeling Techniques.

    By Varadajan Seshadri

    Keywords: torpedo car, kinetics, physical modeling A 1:6 torpedo car physical model was built to assess the optimum refining conditions for pig iron desulfurization in the torpedo car considering t

    Jan 1, 2005

  • DFI
    Optimization of the Piled-Raft Foundations Considering the Soil-Pile-Raft Interaction

    By Hessam Yazdani

    In comparison to the conventional piled foundations, the piled-raft foundations provide a more economical solution to support high-rise buildings constructed on soft soils. In this type of foundations

    Jan 1, 2013