OFR-17-82 Field Survey Of Float Dust In Coal Mining OperationsBy J. A. Kost
The objectives of this contract were to determine the amount, size, and deposition of float coal dust (74 x 10 microns) generated during the mining and transporting of coal in underground U.S. mining
Jan 1, 1981
-
OFR-17-87 Cost Estimation Handbook For Small Placer MinesBy Scott A. Stebbins
This Bureau of Mines publication presents a method for estimating capital and operating costs associated with the exploration, mining, and processing of placer deposits. To ensure representative cost
Jan 1, 1987
-
OFR-170(1)-83 Cost-Effectiveness Of Increasing Airflow At Any Location In Underground Coal Mines (Volume I)By Sandip K. Mukherjee
This report presents the results of the economic analysis of several applicable alternatives to increase airflow in four underground coal mines. Pressure-quantity surveys were conducted underground an
Jan 1, 1983
-
OFR-170(2)-83 Cost-Effectiveness Of Increasing Airflow At Any Location In Underground Coal Mines (Volume II - Appendices)By Sandip K. Mukherjee
This report presents the results of the economic analysis of several applicable alternatives to increase airflow in four underground coal mines. Pressure-quantity surveys were conducted underground an
Jan 1, 1983
-
OFR-171-83 Noise Reduction Of Chain Conveyors - Volume IIBy A. Galaitsis
This report summarizes part of the work performed under the USBM Contract No. H0155113, "Noise Abatement of Continuous Mining Machines." It reviews, briefly, the aboveground tests performed on a Jeffr
Jan 1, 1983
-
OFR-171-84 Minerals Availability Commodity Directory On NickelBy William L. Rice
This Bureau of Mines Open File Report on nickel is one of a series of minerals availability commodity deposit abstracts. Nonconfidential information from the Minerals Availability Program data base co
Jan 1, 1984
-
OFR-172-83 Theoretical Study, Design And Analysis Of An Improved Shuttle Car Cable ReelBy PW Meisel
An hydraulic-powered reel system to minimize peak tension transients in shuttle car trailing cables has been theoretically designed and analyzed using a computer. A single spring-loaded take-up sheave
Jan 1, 1983
-
OFR-173-83 Instruments And Techniques For Dynamic Particle Size Measurement Of Coal DustBy Virgil A. Marple
It was the purpose of this contract to conduct research in several different areas of instrumentation used to determine the quantity of respirable dust in the mining atmosphere. One area of research w
Jan 1, 1981
-
OFR-174-82 Impact Of Surface Mining On Soil Compaction In The Midwestern U.S.A.By Steve C. Albrecht
The objective of this study is "to assess the impact of surface mining on soil compaction in the Midwest". The study revolves around a unique field sampling program targeted at four mine sites utilizi
Jan 1, 1982
-
OFR-175-82 Alternative Power-Line Proximity Warning TechniquesBy Frederick H. Raab
A power-line proximity-warning (PLPW) system must have a high probability of detection (alarm activation at a specific distance), low probability of false alarm, and minimal set-up and maintenance. Te
Jan 1, 1982
-
OFR-175-83 Fire Hazard Criteria For Noise Control Products In Underground Coal MinesBy Mark R. Pettitt
The development of fire hazard criteria for noise control products in underground coal mines are presented. Qualifying requisites of the criteria include maintaining miners' safety, allowing for
Jan 1, 1983
-
OFR-176-82 Development Of A DC Current Limiting Interrupting System For MinesBy Howard B. Hamilton
A switching system for high fault current 300 and 600 volt DC trolley and haulage systems, as used in the mining industry is presented. The system consists of paralleled main and auxiliary contactor c
Jan 1, 1982
-
OFR-177(1)-83 Electrical-Shock Prevention - Volume I -Protection Of Maintenance PersonnelBy L. A. Morely
The overall objective of the subject contract was to investigate the application, economic, and safety considerations of electrical-shock prevention techniques applied to surface and underground mines
Jan 1, 1982
-
OFR-177(2)-83 Electrical-Shock Prevention - Volume II - Ground-Fault Interrupting DevicesBy L. A. Morely
Volume II of the final report concerns the application of sensitive ground-fault interrupters (GFIs) to ac utilization circuits in U.S. mines The main concepts examined are shock prevention and method
Jan 1, 1982
-
OFR-179-83 Analysis Of Electrical Accident Prevention CountermeasuresBy W. L. Cooley
The report provides a detailed analysis of 23 electrical accident countermeasures contemplated for use in the metal/non-metal mining industry. The costs and potential benefits of implementing groups o
Jan 1, 1982
-
OFR-18-73 Investigation Of Requirements And Performance Of Safety Catches On Wire-Rope-Suspended, Man-Carrying Conveyances In United States Coal MinesBy C. H. Larsen
The results of a comprehensive investigation of conveyance arrestment devices (safety catches) in United States coal mines are presented. Availability and use, performance, inspection, maintenance, te
Jan 1, 1972
-
OFR-18-74 Development Of A Personal Dust Sampler - I - IntroductionBy C. Froger
Since its creation in 1950, the Centre d'Etudes et Recherches des Charbonnages de France at Verneuil-en-Halatte (Oise) has been conducting many investigations concerned with airborne dust measure
Jan 1, 1973
-
OFR-18-76 Economic Feasibility Of Recovering And Utilizing Methane Emitted From Coal ? I. Summary - A. Purpose And ScopeThe U.S. Bureau of Mines has been concerned for many years with the general problems of underground coal mining and the particular problems due to the methane content of the coal. The Bureau and other
Jan 1, 1975
-
OFR-18-80 Evaluation Of Surface Mining Blasting Procedures ? 1.0 SummaryAn evaluation of blasting procedures in surface mining operations was undertaken to determine means for improving safety. The objectives of the study were to: 1. Develop guidelines for safer blasti
Jan 1, 1977
-
OFR-18-81 Preliminary Design And Cost Estimate For A Field Worthy Simple Featured MMRDM Based On A Prototype Beta Attenuation/Filter Tape System Developed Under Contract Number H0166097By Pedro Lilienfeld
This report presents a design and cost investigation for several alternative versions of a field-worthy mining machine-mounted respirable dust monitor. Three main design variations are considered: (a)
Jan 1, 1980