    Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.

    By M. Cornelius

    Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of

    Jan 1, 1999

  • DFI
    Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction Examples

    By J. Nakayama

    Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t

    Jan 1, 1989

  • DFI
    Large Diameter Machine Bored Piles In Australia

    By W. J. Kingwell

    Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of

    Jan 1, 1989

  • DFI
    Large Diameter Piles For Deep Foundation Of Orsang Aqueduct - Synopsis

    By A. B. Desai

    The construction of 1144 nos. of piles, each 1.5 m diameter, bored-cast-in-situ type and varying in depths from 6.5 to 23m, has been completed as foundation for 26 piers of 548 m long aqueduct across

    Jan 1, 1996

  • CIM
    Large Diameter Raise Boring in Hard Rock: An overview, its application and considerations

    By Patrick S. Hudd

    Traditionally in hard rock mining, large diameter raise boring was thought of as 3.04 metre or 3.66 metre diameter holes 300 metres deep. Mine and ventilation engineers were challenged to design syste

    Oct 1, 2010

  • DFI
    Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - Introduction

    By P. A. Neill, O&apos

    The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee

    Jan 1, 1994

  • DFI
    Large Diameter Shafts - Youghiogheny Reservoir Bridge

    By Paul J. Lewis

    Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt

    Jan 1, 2005

  • SME
    Large Diameter Tunnel Boring Machine Development

    By Martin Herrenknecht

    The world?s growing population and rapidly proceeding urbanization are boosting an enormous demand for new and high-capacity infrastructures to secure the mobility of goods and people. Densely popula

    Jan 1, 2010

  • AUSIMM
    Large Diameter Tunnel Excavation Through Mixed Ground of Clay and Basalt Using Tunnel Boring Techniques

    The excavation of a tunnel through rock and mixed ground of basalt and silty clays presents a challenge to engineering organisations. Such was the situation facing the Melbourne and Metropolitan B

    Jan 1, 1987

  • SME
    Large diameter tunneling in Seattle is a sign of things to come

    By Christopher Bambridge

    The Washington State Department of Transportation (WSDOT) is constructing a new tunneled route under Seattle to replace the existing State Route 99, Alaskan Way Viaduct (AWV), which follows the histor

    Sep 1, 2013

  • CIM
    Large dykes of the Suncor oil sands mine

    By W. K. Chan, R. Lahaie

    "The Suncor Oil Sands Mine located north of Fort McMurray, Alberta, produces about 80000 m' per day of tailings waste which must be disposed of economically in an environmentally acceptable manne

    Jan 1, 1988

  • AUSIMM
    Large Excavations in Weak Mudstone for the Porgera Mine Plant Development

    The plant and processing site at Porgera has been built on a levelled mudstone ridge about lkm E of the mine. Excavation of 7xl06m3 of soil and rock was necessary to achieve the required area. The

    Jan 1, 1991

  • SME
    Large Excavator Cuts Operating Costs at Alabama Coal Mine

    By Bill Elverman

    Randy and Kenny Robison have visited every coal mine that would let them in the door, to survey the best mining practices. The brothers have spent nearly their entire lives working in coal operations

    Jan 1, 2005

  • SME
    Large Flotation Cell Tests Successful in Chile

    By J. Kallioinen

    The development of mechanical flotation cells has resulted in larger and better cells. This has led to flotation banks with only a few units, even in large-scale operations. This equipment development

    Jan 1, 1995

  • SME
    Large Flotation Cells In The Copper Processing Industry ? Recent Experiences And Future Considerations (Part 1)

    By D. Govender

    In recent years, economies of scale have continued to drive copper projects to larger throughputs to offset depleting lower grade resources. A decade ago there were only a small number of projects tha

    Feb 27, 2013

  • CIM
    Large Flotation Machine Development and Operation

    By M. Churchill, V. R. Degner

    "Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi

    Jan 1, 1982

  • SME
    Large Grinding Mill Bolted Joints – A Topic Of Concern (11a1f463-ada3-4cfb-90bc-0f7f4fabdaf0)

    By R. L. Guerguerian

    Critical fasteners are described as they apply to the specification, manufacture, and assembly on large grinding mill bolted joints. The importance of adequate design methods, related joint diagrams

    Jan 1, 2001

  • ISEE
    Large Hole Rotary Drill Performance

    By J Lyall Workman, Peter N. Calder

    "Large hole rotary drilling is one of the most common methods of producing blastholes in open pitmining. Large hole drilling generally refers to diameters from 9 to 17 inch (229 to 432 mm), however ac

    Jan 1, 1996

  • AUSIMM
    Large Scale Development of Submerged Lancing Sirosmelt Tin Process at Associated Tin Smelters

    By Jones KW, McClelland RA, Denholm WT, Taylor RN, OÆShea J

    Associated Tin Smelters, Sydney, are developing tin smelting operations in a prototype commercial SIROSMELT plant comprising two furnaces of 5 to 8 tonnes capacity. Features of the plant and its

    Jan 1, 1984

  • SME-ICGCM
    Large Scale Ground Instability Caused By Failure of Underlying Pillars: A Case Study of Dynamic Multiple Seam Interaction

    By Christopher Mark

    Severe dynamic multiple seam interactions can occur when active mine workings are subsided by underlying mining activity. The most dramatic events are usually caused by longwall mining or pillar recov