Search Documents

Sort by

  • CIM
    History, Tectonic Setting, and Models for Instrusion-Related Gold Deposits in Southwestern New Brunswick, Canada: Examples from the Clarence Stream Area

    By K. G. Thorne, M. J. McLeod, D. Hoy

    "Throughout the Paleozoic, a variety of gold depositional environments were created in the New Brunswick segment of the northern Appalachians because of the complexity of arc and continental plate col

    Jan 1, 2008

  • TMS
    Hoboken Converter Performance Improvements At The Phelps Dodge Miami Smelter

    By Ovidiu Pasca

    The Phelps Dodge Miami Smelter utilizes four Hoboken converters to process molten matte from the Isasmelt vessel. This paper presents past and present improvements in operation, maintenance and proce

    Jan 1, 2005

  • SME
    Hobson And Rosedale Tunnels?New Technology In Auckland

    By Harry Asche

    The last 12 months has seen the construction of the first Earth Pressure Balance (EPB) TBM excavated tunnel in New Zealand on the Project Hobson sewer storage tunnel for Watercare Services Limited, wi

  • CIM
    Hoist rope improvements through thermo plastic enhancement

    By Bill Parnell

    "Friction winders and double drum winders have been used in the vertical shaft mining industry for over 100 years. In that time, there have been many changes made in the electronic and mechanical fiel

    Jan 1, 1995

  • AIME
    Hoisting Equipment at Utah Apex Mining Co.

    By J. A. Norden

    MUCH has been written concerning the hoisting equipment of various mines -throughout the country, but most of the literature on the subject, if not all, describes equipment of extraordinary capacity a

    Jan 8, 1920

  • SME
    Hoisting Systems (a4900c29-13ab-4c51-a9d4-095a976b1923)

    By Christopher J. Bise

    INTRODUCTION The transportation of men, supplies, and mined material from an underground operation is the connecting link between the mine plant and the surface plant. Unless the mine is accessed by

    Jan 1, 1986

  • AIME
    Hoisting Systems At Ozark Lead Co.

    By M. C. Young

    The Ozark Lead Company operating facilities are located in Reynolds County at the south end of the "New Lead Belt" of southeast Missouri. Development of this wholly owned subsidiary of Kennecott Coppe

    Jan 1, 1975

  • SME
    Holding Back the Bay: Performance of Jet Grout in Hydraulically Placed Fills - NAT2024

    By Roger Escoda Estelrich, Joan Carles Casado Ortega, Mitchell Gerdau, Jose Raul Martinez, Jeb Pittsinger, Frank Perrone

    The existing Chesapeake Bay Bridge-Tunnel complex is being expanded to include the Parallel Thimble Shoal Tunnel. This will be a subaqueous bored crossing between two islands constructed for the origi

    Jun 23, 2024

  • DFI
    Holding Back The Watchung Mountains

    By Ryan C. Linthicum

    A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains

    Jan 1, 2003

  • ISEE
    Hole Deviations in Mining Operations: Types, Sources and Effects

    By Sam Kangwa, Thomson Sinkala

    Th e re are three basic types of hole deviations in long hole d ri l l i n g , n a m e l y collar i n g , alignment and tr a j e c t o r y dev i a t i o n s . In mining, the accur a cy in drilling has

    Jan 1, 2004

  • AUSIMM
    Holistic Approach to Study Gravity Flow at the Kiruna Sublevel Caving Mine

    By M Wimmer

    LKAB operates two underground iron ore mines located in the northern part of Sweden, both using sublevel caving (SLC) as the mining method. Knowledge of the mechanisms of gravity flow is important sin

    May 9, 2016

  • SME
    Holistic planning and approval of sustainable lignite mining and utilization

    By L. Kulik, J. den Drijver

    Rhenish lignite will continue to play an indispensible role in the energy mix of the German Federal Republic for a long time to come. The use of lignite for electricity generation, upgrading and, if n

    Jan 1, 2011

  • DFI
    Hollow Core Bar Micropiles - Design Parameters Interpreted From 404 Load Tests

    By Jesús E. Gómez

    This work is a continuation of a paper presented in the 32nd DFI Annual Conference, Colorado 2007, titled ?Hollow Core Bar Micropiles - Design parameters interpreted from 260 load tests.? The first pa

    Jan 1, 2008

  • SME
    Holographic Testing Method of Rock

    By Duk-Wom Park

    INTRODUCTION he most important information required for the engineering design of structures in rock is its inherent rock properties. Without providing adequate parameters on the rock property, hi

    Jan 1, 1986

  • CIM
    Holt-McDermott Milling Operation

    By R. H. Colquhoun

    "INTRODUCTION The Holt-McDermott Mine is wholly-owned gold mining operation of American Barrick Resources Corp. that begun operations in June 1988.The property is located 0.5 km. south of Highway 101

    Jan 1, 1989

  • SME
    Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline Studies

    By C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani

    The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th

    Jan 1, 2001

  • SME
    Homestake’s McLaughlin mine : One of the largest US gold mines comes onstream in 1985

    Introduction The Homestake Mining Co. has always been big on gold. After 108 years in the business, the company and its principal product are almost synonymous. The relationship continues. On Sept.

    Jan 1, 1986

  • CIM
    Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding Circuit

    By M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud

    "In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp

    Jan 1, 2017

  • SME
    Hong Kong Strategic Sewage Disposal Scheme (SSDS) TBM Tunnelling Beneath Seabed and Urbanised Areas\

    By Massimo Concilia, Remo Grandori, Paolo Nardone

    Paul Y. – SELI Joint Venture had been contracted to build the longest section of the Strategic Sewage Disposal Scheme (SSDS) – Stage I. This involved two tunnels under urban and marine areas excav

    Jan 1, 2001

  • SME
    Hong Kong Strategic Sewage Disposal Scheme Stage I—Deep Tunnels

    By Will Foreman, Douglas D. McLearie, Edwin K. H. Tong, William H. Hansmire

    Hong Kong’s Strategic Sewage Disposal Scheme (SSDS) Stage I involves the provision of a system of deep tunnels for transporting to a central treatment works wastewater collected from a number of catch

    Jan 1, 2001