Search Documents

Sort by

  • TMS
    Fe-Ni Alloys Formation in Carbonthermal Reduction Process using Laterite Nickel Ore

    By Jilai Xue

    Fe-Ni alloys can be used as raw material in making stainless steel. Laterite nickel ore is one of mineral resources for producing nickel alloys. In this work, the laterite ore after dehydration at 800

    Jan 1, 2010

  • SME
    Feasibility Analysis Of Wind Power As An Alternative Post-Mining Land Use In Appalachia

    By A. Duerksen

    Surface coal mining in West Virginia has supplied energy to the eastern coast of the United States for over a century. The coal mining industry has been forced to adapt as societal demands regarding h

    Jan 1, 2012

  • SME
    Feasibility And Implementation Of Shield Machine Tunnel Passing Through An Operating Airport Runway

    By Hongjie Yang

    The No. 10 metro line of Shanghai city is 36 kilometers in length and will pass through the operating airport runway by using tunnel boring machine with earth pres-sure balance mode. Although there ar

  • SME
    Feasibility Evaluation For The Excavation Of Large Hemispherical Cavities At The Nevada Test Site

    By Robert P. Kennedy, Andrew H. Merritt, Edward J. Cording, Thomas R. Kipp

    INTRODUCTION Measurement of certain data associated with nuclear testing necessitates the reception of waves at the instrument location which are unaffected by reflection off internal structures

    Jan 1, 1979

  • CIM
    Feasibility of controlled recirculation of exhaust air to reduce heating costs at Ruttan Mine, Manitoba

    By J. -P. Saindon, L. D. Nel, A. E. Hall, S. G. Hardcastle

    "This paper reports on an investigation into gas and dust concentrations in Ruttan Mine's exhaust air. The values obtained indicate that there is excellent potential to recirculate approximately

    Jan 1, 1988

  • SME
    Feasibility Of In Situ Leaching Of Metallic Ores Other Than Copper And Uranium

    By George M. Potter

    Under contractural arrangements with the Bureau of Mines, Mountain States Research and Development, Inc. (MSRD) completed a technological investigation to determine the feasibility of in situ mining o

    Jan 1, 1981

  • CIM
    Feasibility of iron recovery from Mount Wright tailing material

    By John A. Meech

    "Oleic acid flotation of Mount Wright thickener underflow tailing material has been shown to be capable of increasing plant recovery by 3%. High levels of oleic acid addition (1.5 kg/t) are required,

    Jan 1, 1981

  • SAIMM
    Feasibility of recovering metals from associated slags

    By M. Wang, Z. Sui, T. Lou

    After smelting, the associated mineral ore accompanying Valuable Metal Compounds (VMC),such as titania and borate in BF., most of the VMC were separated from the metal into the molten slag that is an

    Jan 1, 2004

  • NIOSH
    Feasibility Of Using Laser-Based Vibration Measurements To Detect Roof Fall Hazards In Underground Mines

    By Peter Swanson

    One of the primary methods for analyzing roof stability in underground mines is the age-old method of “roof sounding” where a miner taps on the roof and listens for the hollow sound of loose blocks of

  • AUSIMM
    Feasibility Studies, EPCM and the Environment ù Case Studies in Integrated Mine Development

    By R Aseervatham

    The fast tracked mine development strategy attempts to blend feasibility studies and engineering/commissioning functions into a streamlined process. In this compressed process, environmental issues ar

    Jan 1, 1999

  • SME
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • SME-ICGCM
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia (25d3d094-fa9d-4970-a166-6a4fe20badce)

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • CIM
    Feasibility Study and Optimization of Dissolution of Vanadium from Mining Residue via Biological Approach

    By H. Gharahbagheri, S. Shafiei Zadeh, H. Hassan Nejad, Reza Roostaazad

    In this paper, dissolution of vanadium from mining residue, in which vanadium is associated intimately with magnetite ore, was investigated via both bacterial ( aerobic and anaerobic) and fungal activ

    Jan 1, 2014

  • SAIMM
    Feasibility study of electricity generation from discard coal

    By A. Engelbrecht, B. North, B. Oboirien

    "There is large electricity generation potential in discard coal, both in stockpiles and current arisings. Power stations with a combined capacity of up to 18 GW electrical (GWe) could be fuelled by d

    Jan 1, 2015

  • ABM
    Feasibility Study Of The Production Of Iron Ore Tailings And Coking Coal Aglomerates For Use In Reduction Reactors

    By Paula Maria Gomes Cunha Leão, Flávio de Castro Dutra, Fabrício Vilela Parreira, Silvio Maranha

    In the iron ore beneficiation, tailings are inherent in the concentration processes to which the ores are subjected for the production of commercial products. The large generation of tailings has been

    Oct 1, 2019

  • SME
    Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)

    By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan

    A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove

  • SAIMM
    Feasibility Study On Triboelectrostatic Concentration Of <105 µm Phosphate Ore ? Synopsis

    By S. O. Bada

    Fine phosphate feed is considered to be slime and normally disposed of as a discard in settling ponds or dumped as landfill. The purpose of this research was to establish whether commercially acceptab

    Jan 1, 2012

  • SAIMM
    Feasibility Study On Triboelectrostatic Concentration Of <105 µm Phosphate Ore ? Synopsis (e7c858d2-f29a-404a-b79b-5a106aade6ef)

    By S. O. Bada

    Fine phosphate feed is considered to be slime and normally disposed of as a discard in settling ponds or dumped as landfill. The purpose of this research was to establish whether commercially acceptab

    Jan 1, 2012

  • SAIMM
    Feasibility Study On Underground Coal Gasification Of No. 15 Seam In Fenghuangshan Mine ? Synopsis

    By W. G. Huang

    To recover the coal resources of high-sulphur anthracite in Jincheng Mining Area, underground coal gasification (UCG) of No. 15 seam in Fenghuangshan Coal Mine was proposed. The feasibility of the pro

    Jan 1, 2012

  • SME
    Feasible Designs In The Class Of Homogenous, Countercurrent, Processing Networks

    By T. P. Meloy

    A methodology is presented for finding feasible or locally optimal designs in the class of homogeneous, countercurrent, processing networks performing two-component non-sharp separations. The advantag

    Jan 1, 1994