  • DFI
    Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury Bridge

    By Frederick C. Rhyner

    Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw

    Jan 1, 2004

  • SME
    Design And Construction Of Lake Mead Intake No. 3 Shafts And Tunnel

    By Jon Hurt

    INTRODUCTION The entire scope of new facilities for Lake Mead Intake No. 3 includes a sub-merged intake structure, a deep tunnel beneath Lake Mead, a tunnel access shaft, Intake Pumping Station No. 3

  • DFI
    Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich Bridge

    By Andrew Peterson

    The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi

    Jan 1, 1999

  • SME
    Design And Construction Of Minghu Power Cavern

    By C. Y. Kao, Roger Y. Cheng, C. S. Hsieh

    The mushroom-shaped Minghu power cavern located in central Taiwan is 21.2 m (W) by 40.5 m (H) by 127.2 m (L) and is designed to house 4 units of power generating-pumping equipment with a total capacit

    Jan 1, 1983

  • SME
    Design And Construction Of Norad Expansion Project "Excavation Phase"

    By Gerald G. Griswold, Allan G. Provost

    INTRODUCTION The Norad Expansion Project was located 10 miles southwest of Colorado Springs, Colorado, within Cheyenne Mountain. The expansion areas to be excavated would be adjacent to the existin

    Jan 1, 1979

  • SME
    Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project

    By J. Chae, D. Pecha, R. Andrews

    The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro

    Jan 1, 2005

  • SME
    Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel

    By Russel Delmar

    Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope

    Jan 1, 2008

  • DFI
    Design And Construction Of The Deep Stations For The Copenhagen Metro - Synopsis

    By David R. Beadman

    This paper discusses how modern techniques of design and construction were used to create the deep stations for the Copenhagen Metro. The deep stations are located in small squares within the city adj

    Jan 1, 2000

  • SME
    Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK

    By Andy Alder

    The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t

    Jan 1, 2008

  • SME
    Design and Construction of the Fields Point Tunnel Pump Station for the Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island ? Introduction

    By Geoffrey Hughes

    The Narragansett Bay Commission (NBC) is a regional sewer authority that serves ten communities in the Providence, Rhode Island metropolitan area. From 1992 to 1999, the NBC developed a comprehensive

    Jan 1, 2008

  • SME
    Design And Construction Of The Lafayette Bluff Tunnel

    By D. L. Petersen, C. R. Nelson, B. K. Nelson, B. D. Wagener

    The Lafayette Bluff tunnel, currently under construction for the Minnesota Department of Transportation (MnDOT), will be among the widest highway tunnels in the United States. The 199-meter tunnel is

    Jan 1, 1991

  • DFI
    Design And Construction Of The Large Bored Piles For A Bridge Over The Yellow River ? Synopsis

    By Y. Z. Wang

    Zhengzhou Yellow River Highway Bridge, which is under construction, has a total length of 5550 meters with bored cast-in-place concrete piles as the foundations of its piers which have a diameter of 2

    Jan 1, 2010

  • SME
    Design And Construction Of The Lenihan DAM Outlet Tunnel And Shaft

    By Hemang Desai

    A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig

  • DFI
    Design and Construction of the New VDOT Midtown Tunnel

    By Rick Ellman, Ian Chaney

    "The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a

    Jan 1, 2014

  • DFI
    Design And Construction Of The Rion Antirion Brdoge Foundations

    By Alain Pecker

    The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot

    Jan 1, 2005

  • SME
    Design and Construction of the Shoal Creek Raw Water Intake at Lake Lanier

    By D. Rendini, R. D. Gutridge

    INTRODUCTION Gwinnett County, Georgia, is a part of the rapidly expanding metropolitan Atlanta Georgia area. Located approximately 48 km (30 miles) northeast of Atlanta, Gwinnett County has a curr

    Jan 1, 2005

  • DFI
    Design and Construction of the Summit Senior Care Facility into the Side of an Unstable California Hillside

    By Patrick O. Shires, Harry W. Schnabel

    With stable building sites becoming scarce in the greater San Francisco Bay Area, the new Summit Senior Care Facility is being built into the side of an unstable hillside adjacent to the San Ramon Reg

    Jan 1, 2018

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2005

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2007

  • DFI
    Design and Construction of the Thames Water Lee Tunnel Shafts, London

    By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley

    "AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor

    Jan 1, 2014