Design And Application Of Vertical Micropiles To Resist Large Lateral LoadsBy Helen D. Robinson
Traditional practice to resist large lateral loads on foundations is the use of large diameter caissons, battered driven piles, or battered micropiles. Dense urban construction environments, however,
Jan 1, 2010
-
Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)By Larry DeGraff
With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr
Jan 1, 2009
-
Design and Commissioning of the Ridgeway ConcentratorBy B Clemen, D Gordon, F Cesnik, P Griffin
In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm
Jan 1, 2003
-
Design And Construction Aspects Of A Deep Basement In Dublin - SynopsisBy Philip J. Daynes
As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase
Jan 1, 2003
-
Design And Construction Challenges At The Gualcamayo Mine ? IntroductionBy N. Ward
The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re
Jan 1, 2011
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base TunnelBy Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver FormationBy Ken Andromalos
Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili
Jan 1, 2007
-
Design and Construction Evolution of the Kemess Mine Tailings DamBy Georgia J. Lysay
The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat
May 1, 2007
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? SummaryBy Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching StopeBy F. Djahanguiri
The U.S. Bureau of Mines is conducting research on underground stope leaching of metalliferous ores to minimize the environmental impact of ore processing on the surface and to maximize minable reserv
Jan 1, 1995
-
Design And Construction Of A Cut-Off Wall In Warm PermafrostBy Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
Design and Construction of a Deep, Dual-Cell, Slurry Wall Shaft in Soft GroundBy Edwin Itzig-Heine, Daniel Traylor, Bernard Tarralle, Michael McKenna
This paper discusses the challenges associated with the design and construction of a dual-cell, “figure eight” shaped shaft in saturated, soft ground for the Northeast Interceptor Sewer project in Los
Jan 1, 2003
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel ProjectBy Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001
-
Design and construction of a surface air cooling and refrigeration installation at a South African mineImpala Platinum?s No.16 Shaft mine is currently under construction and is expected to reach full production of 256 500 tons per month by 2014. Mining will start at 1 260 m below surface with a maximum
Jan 1, 2009
-
Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) WallBy Allan Sylvester
Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel
Jan 1, 1997
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro ClayBy Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong
"Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al
Jan 1, 2017
-
Design and Construction of Dulles Airport TunnelsBy Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field
With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn
Jan 1, 2007
-
Design And Construction of Emergency Pedestrian Egress Tunnels, Essex Junction, VermontBy Bradford F. Townsend, Robin B. Dill, Richard M. Croswell
Innovative geotechnical construction techniques were used to construct three pedestrian tunnels under a building slab-on-grade to allow utilization of basement space for manufacturing. Tunnels were co
Jan 1, 1993
-
Design and Construction of EPB Tunnels Within an Artesian Groundwater Aquifer - Addressing Environmental IssuesBy Adrian Coombs
The York Durham Sewage System (YDSS) Interceptor Tunnel Project is located in the Town of Richmond Hill, Ontario, Canada, just north of Toronto. Construction commenced in September 2006 and completion
Jan 1, 2008