Search Documents

Sort by

  • SME
    Construction Of The Pacheco Pumping Chamber And Shafts

    By Russell Clough

    The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re

    Jan 1, 1985

  • SME
    Construction of the Pergau Hydroelectric Power Project, Malaysia

    By Patrick J. Doig

    In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,

    Jan 1, 2001

  • SME
    Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in Austria

    By Helmut Westermayr, Michael Tergl

    DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t

    Jan 1, 2007

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007

  • SME
    Construction Of The South Interceptor Montreal, Quebec, Canada

    By Jacques Mongrain, Serge Barbeau, Gary Brierley

    The Communaute Urbaine de Montreal is currently involved in construction of the South Interceptor which consists of 53 kilometers (33 miles) of 1,800 mm (6.0 ft) to 5,400 mm (18.0 ft) diameter tunnels

    Jan 1, 1987

  • SME
    Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs

    By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo

    The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.

    Jan 1, 2005

  • SME
    Construction of the West Area CSO Tunnels and Pumping Station

    By Ray Hutton, Darrell Liebno, Taro Nonaka

    Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont

    Jan 1, 2007

  • SME
    Construction of the Wolf Creek Upper Narrows Tunnel Waterproof Membrane—A Comparison of Tunnel Projects Utilizing the Application of Spray-on Waterproof Membrane

    By L. L. Lacerda, A. J. Blair

    The Wolf Creek Upper Narrows Tunnel (Upper Narrows Tunnel) is one of the first major highway tunnel in the United States implementing the use of spray-on membrane for purposes of constructing a double

    Jan 1, 2005

  • DFI
    Construction Productivity Advancement Research Program (CPAR)

    By Jesse A. Pfeiffer

    CPAR, the Construction Productivity Advancement Research Program, is a new initiative of the Corps of Engineers to enhance U.S. construction industry productivity through the development and applicati

    Jan 1, 1989

  • DFI
    Construction Technique Used To Build The Drilled Shafts For The Victory Bridge

    By T. Jason Hardell

    The Victory Bridge project was contracted by the New Jersey Department of Transportation. The project included the construction of two 4000-ft precast segmental concrete bridges to replace the existin

    Jan 1, 2005

  • SME
    Construction Works Of Large-Section Vertically Parallel Twin Tunnels In Close Proximity

    By Kentaro Kuraji

    INTRODUCTION Background Tokyo, the capital of Japan, is one of the largest cities of the world. As many as 33 million people live in Tokyo and three neighboring prefectures although the city occupi

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008

  • AUSIMM
    Consultation with Tangata Whenua

    By C N. Whata

    While there is no specific obligation on the part of any applicant to consult directly with tangata whenua (people of the land), recent cases highlight the need to engage in active consultation in ord

    Jan 1, 1997

  • AUSIMM
    Contact Angle Measurements on Lignite Surface

    Contact Angle Measurements on Lignite Surface

    Sep 13, 2010

  • SME
    Contact Angles Of Powders From Heat Of Immersion

    By I. Yildirim

    Water contact angles of talc powders were determined from the values of the heats of immersion measured using a flow microcalorimeter. The results were used to calculate the contact angles using a ri

    Jan 1, 2001

  • DFI
    Contact Pressure Characteristics Beneath Deep Foundation Of Beijing International Hotel ? Synopsis

    By X. L. Huang

    This paper deals with the experimental and theoretic study of the contact pressure beneath the deep foundation of Beijing International Hotel, The experiments have been carried out in project and in m

    Jan 1, 2010

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • AUSIMM
    Contacts

    This paper on the relation of Granite and Sedimentary Contacts to Victorian Mining will, it is hoped, be of interest to members of the Institute.The broad fact that gold often occurs' at or near

  • AUSIMM
    Containerisation And Heavy Lift Cargoes

    The growth of "Unit Load-cargo handling technology in world cargo lin- er trades over the last decade has cre- ated a situation in which special pur- pose-vessels (cellular container ships, roll-on/r

    Jan 1, 1973

  • AUSIMM
    Containment of Mineral Sands Processing Wastes in Saline Water Products

    By C Doblin

    Any value addition to the mineral sands in the Murray Basin (Australia) will generate waste that needs to be disposed of safely. For example, conversion of ilmenite and synthetic rutile to titania (Ti

    Jan 1, 2002