Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Earthquake Engineering Of Tunnels - RevisitedBy G. Norman Owen, Roger E. Scholl
INTRODUCTION The analysis and design of underground structures to resist vibratory motion due to earthquakes has been of interest to engineers for several decades. The dynamic stability of a powerh
Jan 1, 1985
-
Institute of Metals Division - Relationship Between the Mu Phase and the Sigma Phase in the Mo-Mn-Co SystemBy B. N. Das, P. A. Beck
THE o phases have a complex tetragonal structure with Lo/ao = 0.52 and 30 atoms per unit cell.1 A large number of such phases are now known to occur in various binary systems of the transition elemen
Jan 1, 1961
-
Use Of And Design Parameters For High Capacity Foundation Elements In Boston Bedrock - IntroductionBy Mark X. Haley
Foundation design and construction in Boston has changed dramatically during the past 10 years. Prior to 1985, the primary foundation element in Boston, where deep foundations are required, was driven
Jan 1, 1994
-
Laboratory Evaluation Of A Canopy Air Curtain For Controlling Occupational Exposures Of Roof BoltersBy J. A. Organiscak
In the United States, respirable coal mine dust exposures are limited to a 2 mg/m3 time weighted average for a working shift. If the silica content of the sample exceeds 5 percent, the 2 mg/m3 standar
-
Mill Operations - Lean and KeenBy P. R. Richardson
"Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,
Jan 1, 1988
-
Sulphuric Acid Plant Water Saving OptionsBy R. J. Forzatti
The production of sulphuric acid from sulphur generates heat. The majority of this heat is recovered as steam and is often used to generate electricity. Heat not recovered as steam is rejected to cool
Jan 1, 2014
-
Calculating Blasting Effects to Nearby Underground PipelinesBy Janice K. Means
The purpose of this paper is to provide the seminar attendee with: information on pipeline construction, operation and standards to better equip him (or her) to analyze the ultimate effect of blasting
Jan 1, 1992
-
-
A Two-Phase Backfill Approach to Dilution Control at the Doyon MineBy Emilie S. Williams
The Doyon Mine?s Zone 1 (Altered Zone), found along the southern boundary of the mine, encompasses approximately 20% of the mining reserves. The mineralisation is found in a series of steeply dipping
Oct 1, 2004
-
Evaluation On The Structure-Activity Relationship Of Copper Sulfide Collectors By DFT InvestigationThe molecular structures of isobutyl xanthate (IBX), diisobutyl dithiophosphate (DIBDTP), O-isobutyl-N-ethyl thionocarbamate (IBETC), O-isobutyl-N-ethylcarbonyl thionocarbamate (IBECTC) and O-isobutyl
Feb 27, 2013
-
The Stillwater Paste Backfill PlantBy Frank Yu, Bob Fukuhara
"The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe
Jan 1, 2000
-
Underground Ventilation Laboratory At Pt Freeport Mining Operations, West Papua, IndonesiaBy I. Loomis, D. Rachmad, I. Duckworth
During the past two years the Underground Mine Ventilation Group at PT Freeport Indonesia has undertaken to upgrade their Hygiene Laboratory. This process has included upgrading equipment for dust sa
Jan 1, 2006
-
Analytical Solution for a Deep Tunnel Excavated in a Porous Elasto-Plastic Material Considering the Effects of Seepage ForcesBy R. E. Barbosa
Seepage forces generated during tunnel excavation affect the ground response and may cause severe instability problems, including total ground collapse and flooding into the tunnel. This paper present
May 1, 2009
-
Research on the Roof Advanced Breaking Position of Large Mining Height Working Face in Shallow Coal SeamFully mechanized longwall mining with large mining heights (LMHs) in shallow-depth thick coal seams has been widely applied in Shenfu coalfield, China. Dynamic loading and rib spalling is serious when
Jul 28, 2020
-
Nonlinear Response of Piles with Rigid Embedment: Lessons Learned from a Reduced- Scale ExperimentBy Camilla Favaretti, Benjamin Turner, Anne Lemnitzer
Pile foundations are extensively used in the construction of various types of superstructures, including tall buildings, bridges, freeways and offshore structures. A fully constrained tip embedment su
Jan 1, 2018
-
Technical Note - Simplified Settlement Model For A Shallow Foundation On Composite Ground With Rigid PilesBy Timothy C. Siegel
A piled raft refers to a shallow foundation that is structurally connected to the piles, while composite ground refers to a soil-pile matrix where the piles are not structurally connected. The design
Jan 1, 2011
-
Flocculation of Mineral Suspensions With Coprecipitated PolyelectrolytesBy Ivan B. Cutler, Milton E. Wadsworth
Coprecipitation of anionic and cationic polyelectrolytes has been applied to flocculation of several mineral systems. Results obtained in a study of the flocculation of kaolinite and hematite suspensi
Aug 1, 1956
-
Playing Fields: Level And OtherwiseBy M. Rieber
Building on earlier work, an analysis relevant to international (Australasian) minerals trade is developed which accounts for both the impetus of globalization and national reaction or protection. At
Jan 1, 2002
-
Universities and Decision-Making: Programme and Qualification Mix ? Four Learning PathwaysBy W. P. Nel
The introduction of the Higher Education Qualifications Framework (HEQF) and the updated Higher Education Qualifications Sub-Framework (HEQSF) has caused many South African university departments to r
Jan 1, 2014
-
Optimal Coal Processing Route For The 3 X 0,5 Mm Size Fraction? - IntroductionBy Jeremy Bosman, Johan de Korte
Traditionally the feed to coal preparation plants was de-slimed at 0,5 mm. The +0,5 mm size fraction was processed via dense-medium cyclones and the -0,5 mm size fraction was beneficiated with froth f
Jan 1, 2006