  • SME
    Risk Considerations and Design for the Downtown Deep Sewer Tunnels, Austin, Texas

    By Greg Wieland

    Deep sewer tunnels are required to meet future growth demands of the City of Austin?s down-town redevelopment. The tunnel is 18,000 ft long and varies in finished diameter from 54 inches to 96 inches.

    Jan 1, 2008

  • AUSIMM
    Ashers-Waituna and Hawkdun Lignite Deposits: Their Resources and Use Potential

    By A M. Sherwood

    The Otago and Southland lignite deposits represent by far the largest known fossil energy resources in New Zealand. Despite their size they have remained virtually untouched since exploration in the 1

    Jan 1, 2005

  • SME
    Ion Exchange Resins For Uranium Recovery From Pregnant Solutions With High Chloride Tenor - Introduction

    By M. Mikhaylenko

    The most common methods of processing of uranium ores is sulfuric or carbonate leaching with conversion of hexavalent uranium to uranyl carbonate or sulfate anionic complexes followed by sorption of t

    Jan 1, 2012

  • CIM
    Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.

    By Bruno Lemelin

    Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther

    May 1, 2004

  • SAIMM
    Risk Mitigation On Anglo Platinum Underground Mines - The Role Of Borehole Radar - Introduction

    Anglo Platinum commenced commercial underground borehole radar (BHR) surveys during 2006 following a series of trial surveys using both the ?slimline? Geomole and Aardwolf systems. Current boreh

    Jan 1, 2007

  • ISEE
    Cost Optimization for Controlled Blasting, Transportation and Crushing

    By Taner Sumer, H Altay Guvenir

    Fragmentation in rock quarries is tried to be achieved by changing the specific charge, drill pattern and bore hole diameters by different experts. This paper is a brief summary consisting of the util

    Jan 1, 1993

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • SAIMM
    Direct Smelting Of Stainless Steel Plant Dust

    By T. J. Goff, G. M. Denton

    Mintek has developed the EnviroplasTM process for the treatment of solid wastes from the metallurgical industry, especially steel plant dusts, without requiring agglomeration to produce inert slag and

    Jan 1, 2004

  • SAIMM
    The Implementation Of New Technology In Southern African Mines: Pain Or Panacea

    By A. S. Macfarlane

    The introduction of new technology into mining operations is seen as a strategic necessity by many mining companies, in order to improve safety and to improve operational effectiveness. Many attempt

    Jan 1, 2001

  • CIM
    Participative Management at the Golden Giant Mill, A Co-Ordinators Perspective

    By K. Barr, F. Grenier, J. Hettinger

    "To reach the Hemlo Gold Inc. objective of becoming the lowest cost, safest Canadian gold producer while causing no environmental damage, management embarked from its inception on a strategy to build

    Jan 1, 1988

  • SAIMM
    The application of new design concepts in high tension electrostatic separation to the processing of mineral sands concentrates

    By D. M. MacHunter, T. Lawson, D. K. Henderson

    The development and commercialization of new generation high tension electrostatic separators has provided a basis for simplifying mineral separation plant circuitry. The inclusion of new design f

    Jan 1, 2003

  • CIM
    Advancing Asset Performance at the Montcalm Operation

    By Juan Anes, Dominic Fragomeni, Tim Edwards, Dave Scott, Simon Yu

    "The Montcalm concentrator operation was successfully commissioned in fall of 2004 at the Xstrata Copper’s Kidd Creek Metallurgical Site, Timmins. The start-up met or exceeded the Type 1 profile as de

    Jan 1, 2009

  • CIM
    Declarations and Access Control

    The common theme of these four objectives is declaration. Declaration tells the compiler that an entity exists and also provides the name and nature of the entity. Since everything you create has to b

    May 1, 2011

  • CIM
    Safety Lessons Learned Building two Diamond Mines

    By D. L. Putnam

    Snap Lake Mine ?? Complex dyke ore body ?? Underground operation ?? 1.1 million tonnes per annum ?? 1.2 carats per tonne ?? On-site diesel power generation ?? Supply by ice road and air ?? Mile

    May 1, 2008

  • DFI
    Concrete Overbreak Estimation and Analysis Errors in Bored Piles

    By Nuno Cruz

    "The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before

    Jan 1, 2017

  • AIME
    Iron and Steel Division - Activities in Dilute Liquid Solution Fe-Si-O (TN)

    By T. C. M. Pillay, John Chipman

    The Si-0 equilibrium in liquid iron was investigated in some detail by Gokcen and Chipman1 who reported equilibrium constants of the following reactions: In each case the thermodynamic equilibrium

    Jan 1, 1962

  • SME
    Incorporation Of Silicate Buffering In Predicting Acid Rock Drainage From Mine Wastes: A Mechanistic Approach

    By A. D. Nicholson

    This paper presents an approach to quantitatively calculate the neutralization of acid by silicate minerals, based on the chemical kinetics of acid reacting with silicates. This approach incorporates

    Jan 1, 2002

  • SME
    Evaluation Of Alternative Shaft Sinking Methods For Nuclear Waste Repositories

    By Stephen Phillips, Luigi P. Gonano

    Vertical circular shafts have been proposed for multiple access to high level nuclear waste deep geologic repositories. Shaft construction is a critical path item in the commissioning of a repository.

    Jan 1, 1983

  • SAIMM
    Method statement for Excavation of Powerhouse Cavern Considering Mudstone Layers in Masjed Soleiman Dam

    By M. Shahabi, M. Kashfi

    This paper briefly describes the excavation procedure of a powerhouse, comprising of its incremental excavation, reinforcement measures, and the installed monitoring system. During the first phase of

    Jan 1, 2003

  • SME
    Financing of mining projects - Can banks drive sustainability?

    By M. Götze, P. Eysel

    Over the last years, the importance of the assessment of environmental and social aspects as well as of issues of good governance has increased significantly in mining finance. For this, international