Search Documents

  • DFI
    Underpinning The Existing No. 1 Subway Line At The World Trade Center

    By Richard Crockford

    The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne

    Jan 1, 2008

  • SAIMM
    Interfacial Phenomena And Reaction Kinetics Between Carbon And Slag Containing MnO

    By Haiping Sun, Samir Ganguly, Oleg Ostrovski, M. Yaser Lone

    Wettability of graphite by synthetic SiO2-Al2O3-CaO-MnO slags with varied MnO content and by industrial slags was studied at 1350-1600 °C using sessile drop method under argon atmosphere. Initial con

    Jan 1, 2007

  • IOM3
    Liberation of accessory minerals from various rock types by electric-pulse disintegration: method and application

    By B. E. Burakov, S. D. Lupal, O. A. R. Thalhammer, B. Saini-Eidukat

    Electric-pulse disintegration is a mineral separation technique that liberates all mineral grains from any igneous or metamorphic rock irrespective of its lithology or grain-size distribution. The nor

    Apr 1, 1995

  • NIOSH
    IC 8178 Three Waterflooding Projects And A Pressure-Maintenance Project In Butler And Cowley Counties, Kans., 1963 (f4081a6d-791d-4fea-b102-8295adb5b381)

    By Kenneth H. Johnston

    This report describes in detail three waterflooding projects and a pressure-maintenance project in Butler and Cowley Counties, Kans., that will be visited on the 1963 annual spring tour of the Kansas-

    Jan 1, 1963

  • NIOSH
    Dangers of Toxic Fumes from Blasting

    By Richard J. Mainiero, James H. Rowland III, Marcia L. Harris

    This paper reviews the potential hazards posed by the toxic fumes produced by detonating explosives in surface mining and construction operations. Blasting operations produce both toxic and nontoxic g

  • DFI
    Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) Wall

    By Allan Sylvester

    Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel

    Jan 1, 1997

  • DFI
    Approach To Reliability Based Design On Deep Mixing Improved Ground

    By Masaki Kitazume

    Deep mixing method, in-situ admixture stabilization technique, has been developed and adopted for on land and marine construction works in Japan. The geotechnical design procedure of the method has be

    Jan 1, 2004

  • TMS
    Sustainable Electrolysis for Electrowinning and Electrorefining of Metals

    By Geir Martin Haarberg

    Modern electrolysis technologies can provide possibilities for developing sustainable processes in terms of energy and environment. Laboratory experiments were carried out to study electrodeposition o

    Jan 1, 2010

  • AIME
    Geophysics - Case History of the Juniper Prospect

    By S. H. Ward, R. A. Barker

    THE Juniper Prospect is in Carleton County, N. B., at approximately 46" 31' north latitude, 67" 20' west longitude. During the summer of 1955 an area in west-central New Brunswick was sel

    Jan 1, 1959

  • IIMP
    Proyecto Optimización de Ángulos de Taludes en Explotación de Minas

    By Edgardo Torres Hernández

    El Proyecto Optimización de Ángulos de Taludes en Explotación de Minas es un proyecto desarrollados por E-Mining Technology (EMT), socio estratégico de Prodimin en Perú, para Codelco Chile en uno de s

    Sep 1, 2017

  • CIM
    Implementation of Stage Grinding at the Brunswick Mine Concentrator

    By J. Andrew Cornier, Mike Cooper

    "Upon successful completion of the AG/SAG Mill project (Cooper et al., 2001) the Brunswick Mine concentrator was configured with single line processing through the AG/SAG mill, followed by two paralle

    Jan 1, 2002

  • AUSIMM
    Mine Planning Information from Photogrammetry Sources at the El Teniente Mine

    By P González, E Córdova, E Faundez

    An integrated mine system must be capable of displaying and reporting valuable information that can be used to easily understand, manage and take action on the key parameters being reported.One of the

    May 9, 2016

  • SME
    Maintenance Contract on Cat 785 Trucks Works Well at Round Mountain

    By J. B. Rasmussen

    As part of a purchase of a fleet of Caterpillar 785 trucks, Round Mountain Gold Corp., Cashman Equipment Co. and Caterpillar Inc. entered into a four-year contract for the major maintenance of the fle

    Jan 1, 1991

  • SAIMM
    Physical and numerical modelling of a four-strand steelmaking tundish using flow analysis of different configurations (0c3edd99-7ca7-481d-91c3-d7b7b8a277a8)

    By J. H. Cloete, S. M. Bradshaw, D. K. Chibwe

    "Modern tundishes have evolved as vessels to serve as the final step in refining of molten steel by removing inclusions and promoting thermochemical homogeneity.In this study the flow behaviour in a f

    Jan 1, 2015

  • AIME
    Endowment Funds (7b6c8555-360c-4913-b4a4-ae7f39dbc067)

    The income of the Institute is derived from dues, subscriptions to MINING AND METALLURGY and sale of publications. These sources are fortunately supplemented by the interest from invested funds now am

    Jan 1, 1936

  • AUSIMM
    A New Method of Magnetic Separation of Ferro- and Para-Magnetic Minerals from Feebly Magnetic and Non-Magnetic Minerals

    By Mukhopadhaya K. K, Cory A. H

    The concept of using travelling magnetic fields created by linear motors was stimulated by Laithwaite who advanced ideas on motors with shaded poles (Laithwaite, 1968), rack and pinion motors (Laithwa

    Jan 1, 1980

  • NIOSH
    IC 8837 Noise Control Of Diesel-Powered Underground Mining Machines, 1979

    [This Bureau of Mines report presents results of a survey of underground mining equipment and of two demonstration programs showing the feasibility If quieting; a load-haul-dump (LHD) machine and a pe

    Jan 1, 1980

  • NIOSH
    RI 7327 Stabilization Of Hydraulic Backfill With Portland Cement - Including Results With Other Additives

    By Donald R. Corson

    The effects of adding varying amounts of type I portland cement to hydraulic backfill are described. Six different fill materials, each with three cement contents, were tested to determine which fill

    Jan 1, 1970

  • SME
    A New Short- And Medium-Term Production Planning Tool - Minesight® Schedule Optimizer (MSSO) - Preprint 09-079

    The MineSight Schedule Optimizer (MSSO) is a new production scheduling tool developed by Mintec, Inc. using mixed integer linear programming (MILP) techniques. This tool was developed to solve the sho

    Jan 1, 2009

  • AUSIMM
    The Canadian Mining Industry - Corporate Development Strategies for the 1990s

    Currently in Canada there are 15 major mining companies with a minimum of $1 billion in market capitalization or net private value. This group forms the core of an important sector for Canada. The

    Jan 1, 1989