Analysis and Optimisation of life-of-Mine Haulage Cost using SimulationBy Niklas Frank
Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau
May 1, 2003
-
The Analysis And Computation Of Soil-Pile (Wall) Interaction For Deep Excavation Of High-Rise BuildingBy Lu Peiyan
A computation model of soil-pile (wall) interaction under lateral loading is presented in this paper. The model has been applied to some engineering projects, and the comparison between computation re
Jan 1, 1991
-
Sampling In The South African Minerals IndustryAlthough not fully accepted in South Africa, the Theory of Sampling originally proposed by Pierre Gy is fast becoming the cornerstone of sampling practice throughout the world. The growing acceptance
Jan 1, 2014
-
The Mineral Industry Of Other South Pacific Islands - British Solomon IslandsBy Charlie Wyche
The British Solomon Islands Protectorate continued developmental work on bauxite deposits on the Islands of Rennell and Vaghena. A feasibility study was completed by Mitsui Mining & Smelting Co., Ltd.
Jan 1, 1980
-
OFR-44-79 Monitoring Of Mine Air Blast Pollutants From Six Explosives Tested In An Underground MineBy Duane L. Abata
Toxic gases produced by the detonation of six explosives were measured in an underground hardrock metal mine during actual mining operations. The six explosives included two semi-gelatin dynamites, th
Jan 1, 1978
-
RI 3600 Progress Reports - Metallurgical Division - 50. Annual Report Of The Metallurgical Division, Fiscal Year 1941By R. S. Dean
The brief resume of the activities of the Metallurgical Division that appears annually in its progress reports series serves a useful purpose by making available a rather comprehensive but concise rec
Jan 1, 1941
-
Investigating Total Media WearBy Peter Radziszewski
"Comminition process costs, which typically represent an important contribution to mining operating costs, can themselves be divided roughly between energy and liner /charge wear. As such, developing
Jan 1, 2001
-
Institute of Metals Division - Beta Phase Parameters in the System Ti-V-MoBy Jack L. Taylor
As expected from similar crystal structures and favorable atomic size factors, titanium, vanadium, and molybdenum are completely soluble in one another above the transformation temperature of titanium
Jan 1, 1957
-
How To Increase Plant Performance With Artificial Intelligence And Expert Systems - Preprint 09-074By L. B. Hales
Expert control of grinding and flotation plants has been successfully used in the minerals industry since the 1970?s. The earliest of these systems were written in a hard-coded fashion in FORTRAN, BAS
Jan 1, 2009
-
Structural Dependence Of Alkali Oxide Activity In Coal Ash SlagsBy L Singheiser, W. Willenborg, M. Mueller, K. Hilpert
The limitation of fossil fuel resources and the necessity of reducing CO2emission require an increase of the efficiency of power plants by using combined cycle power systems. Pressurized Pulverized Co
Jan 1, 2004
-
OFR-100-80 Phase I - Portable Crusher For Underground Mining Applications And DesignBy Harold J. Miller
Loading and haulage of run-of-mine ore is frequently the highest cost in underground mining operations. These costs can be significantly reduced by use of belt conveyors, a common practice in coal and
Jan 1, 1978
-
Operation of the sluice box under conditions of low water flowSmall scale gold mining operations in Papua New Guinea (PNG) have been observed to use very low flow rates of water in sluice boxes. In a series of laboratory experiments carried out to determine whet
Jan 1, 1986
-
Field Monitoring of Rock Bolting Performance in Weak Roof StrataBy Tingkan Lu
To understand the reinforcing mechanisms of the fully grouted resin bolt and clarify its performance in weak roof strata, the field monitoring investigation using instrumented bolts has been conducted
Jan 1, 1998
-
Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing PlantBy Willemijn Husslage
Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000
May 1, 2011
-
Milling Practice at the Central Mine, Broken Hill, N.S.W.CENTRAL mine ore consists mainly of galena and marmatite in a siliceous and rhodonitic gangue, the average assay values being approximately 11.5 oz. per ton Ag, 14.5% Pb, 14.5% Zn, 1.3% Ox Pb, 0.3% Ox
Jan 1, 1931
-
OFR-30-81 An Evaluation Of Leaky Feeder Communication In Underground MinesBy Dana T. Updyke
The objective of this project was to develop technical data and evaluate performance and utility of leaky feeder communications systems currently used in North American underground mines. The desired
Jan 1, 1980
-
An Integrated Approach to Assess Acid Generation and Metal Release from Sulphide Tailings Using Oxygen Consumption Measurements, Porewater Chemistry and Geochemical ModelingBy Michael J. Rinker, P. A. Tibble, M. Wiseman, R. V. Nicholson
Tailings, from an active copper-zinc operation, containing about 10% sulphur were investigated to assess the onset of acid production and potential lime requirements for treatment of drainage. Oxygen
Jan 1, 2000
-
Reservoir Simulation-Based Modeling for Characterizing Longwall Methane Emissions and Gob Gas Venthole ProductionBy S. J. Schatzel, W. P. Diamond
Longwall mining alters the fluid-flow-related reservoir properties of the rocks overlying and underlying an extracted panel due to fracturing and relaxation of the strata. These mining-related disturb
-
The Use of Nuclear Tracers to Evaluate the Gold Recovery Efficiency of SluiceboxesSluiceboxes can provide a much higher concentration ratio than most other gravity concentrators (up to 50 000:1) at very high overall placer gold recoveries (greater than 99 per cent). They are also v
Aug 1, 2010
-
How to use Energy Management to Improve Mining Operation Productivity and Reduce Downtime: Canadian Utility Company Incentive ProgramsBy A. Tylczak, C. Norman, C. Shook, S. Loif
"There are a lot of good reasons to manage energy use at mining operations. Optimizing process energy use reduces operating costs. Tracking energy use can help identify unplanned process changes or m
Jan 1, 2015