Search Documents

  • AUSIMM
    Capital and Operating Cost Eestimation for Open Pit Mining Equipment

    Background information, formulae and a systematic set of procedures for estimating capital and operating costs for open pit mining equipment are presented in this paper. Firstly, equipment capital c

    Jan 1, 1990

  • SME
    Engineered Pumpable pHoam?: A New Innovative Method For Mitigating Ard

    If one can embrace the medical analogue, much of the mining industry currently suffers from a massive bacterial infection. When pyrite-bearing or sulfide-bearing rock formations, tailings, or mine was

    Jan 1, 2012

  • SME
    Development of Cyanide Leaching Processs For Small High Grade Gold and Silver Deposits

    By Michael Harris, David Mosch

    The numerous small high grade gold and silver deposits of the Front Range Mineral Belt have been uneconomical because of the high costs of mill construction, transportation, and smeltering. Processing

    Jan 1, 1987

  • AUSIMM
    Silica Gelation in Risdon Leach Pulp

    The polymerisation of silica is found to interfere with thickening of leach pulps at Risdon. Hydroxyl ion and fluoride ion are catalysts for this reaction. Stability may be obtained by the presence of

    Jan 1, 1958

  • CIM
    The transition of mining methods at Anderson Lake Mine

    By Seppo Haapamaki

    "Since it started production in 1970, Anderson Lake Mine has experienced several radical changes in mining methods as a result of the physical characteristics of the ore zone along with the need for i

    Jan 1, 1988

  • IOM3
    Computer-aided instruction in mine automation

    By M. J. Scoble, L. M. Daneshmend, C. Hendricks

    Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993. An attempt is made to relate emerging technologies to education and training req

    Apr 1, 1994

  • SME
    MINExpo International 2000 and World Mining Congress Will Meet in Las Vegas

    The more than 40,000 mining industry professionals that are expected to attend the National Mining Association’s(NMA) MINExpo International2000 trade show and conference will be treated to the exhibit

    Jan 1, 2000

  • CIM
    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011

  • AUSIMM
    Pilot Plant Testing in Mineral Process Plant Design

    By Dunlop GA

    Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t

    Jan 1, 1990

  • SAIMM
    Fast, Safe, And Fully Mechanized Installation Of High-Tensile Chain-Link Mesh For Underground Support ? Synopsis

    By B. Schoevaerts

    The ever-increasing depth of mineral extraction presents a challenging environment for hard-rock underground mines. High in situ stresses and associated seismicity with potential rockburst hazards are

    Jan 1, 2012

  • DFI
    Sonic Integrity Testing - 1.0 Summary

    By A. F. van Weele

    In general cast-in place piles will have an irregular pile shape. However, it is possible that these irregularities are so large that they may lead to pile deficiencies. It is very rarely possible to

    Jan 1, 1987

  • SME
    Use Of The 1500-pDR For Gravimetric Respirable Dust Measurements At Mines

    By W. R. Reed

    The National Institute for Occupational Safety and Health (NIOSH) uses light-scattering dust monitors (nephelometers) in its research to develop dust controls to reduce respirable silica dust overexpo

    Jan 1, 2012

  • ISEE
    Developments of Granular Emulsion Explosives

    By Takuya Taguchi, Toshihiro Ogata, Atsuio Inoue, Shigeyuki Sasaki

    Highly improved drilling machines and mucking machines have been used for the underground construction. To have rapid construction, the roles of blasting operation ha ve been growing more important. A

    Jan 1, 2005

  • SME
    Simtars New Mobile Gas Laboratory For Emergency Response

    By D. Brady

    The need for onsite gas monitoring during, or following, a major incident at an underground coal mine has long been recognised. Recommendations from inquiries following Queensland mine disasters have

    Jan 1, 2012

  • CIM
    Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)

    "As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.

    Jan 1, 2017

  • SME
    Coal (Coal production by coal-producing regions, 2001)

    With the dawning of a new century came the beginning of a new era in the coal industry. Instead of the traditional practice of only buying and selling produced coal in the United States, a coal futur

    Jan 1, 2002

  • SME
    Tire maintenance requires an entire team effort

    By Roger Best

    In the mining industry, where some of the vehicles are larger than a one-story house, tire maintenance cannot be accomplished by the tire shop alone. It takes an army of people to maintain a fleet of

    Jan 2, 2010

  • AIME
    Mining - Experimental Impact Craters in Basalt

    By J. Moore, D. Gault, R. V. Lugn

    Impact of small projectiles with velocities between 0.9 and 7.3 km per sec on basalt produce craters chiefly by the ejection of fragments. Weight-size distributions of the ejecta are linear for part o

    Jan 1, 1963

  • ISEE
    Peculiarities of Drilling and Blasting in Underground Small-Scale Mines

    By Patricio Santis, Jacopo Seccatore

    Artisanal and Small-scale Mining (ASM) is a prominent activity in the extractive industry: considering only gold, it produces about 20% of world market supply. Despite this fact, ASM is generally asso

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007