Search Documents

  • AUSIMM
    Technology of Electrolytic Reduction of Alumina by the Hall-Heroult Process: III. The Anode Reaction During Electrolytic Decomposition of the Alumina

    The literature pertaining to the electrochemical reaction at the anode during electrolytic reduction of alumina by the Hall-Heroult process is not in universal llgreement about the gaseous product. Th

    Jan 1, 1967

  • AUSIMM
    Design of Reinforced Concrete Chimney at Yallourn Briquetting Works

    THE Yallourn chimney has aroused interest, as it is, for the time being, the tallest structural erection in Australia. Its height was not decided on, however, with the object of breaking records, but

    Jan 1, 1924

  • AUSIMM
    Spectrophotometric Determination of Z-200 (Isopropyl Ethylthionocarbamate) in Flotation Liquors

    The ultraviolet spectrum of isopropyl ethylthionocarbamate (the principal constituent of Dow flotation collector Z-200) in water and of Z-200 itself in water was found to have an absorption peak at 24

    Jan 1, 1969

  • AUSIMM
    Occurrence of Tin Ores at Torington, N.S.W.

    The Torington Lodes.This paper describes investigations into mineralogical, petrological and structural associations of cassiterite in occurrences of economic value. The work was carried out in three

    Jan 1, 1950

  • IIMP
    Simplificación de Procesos Hidrometalúrgicos mediante Electro-obtención Directa

    By Anthony Treasure

    El presente trabajo señala la aplicación de la tecnología EMEW® para la recuperación de metales preciosos a partir de soluciones cianuradas diluidas que contienen plata y oro. La tecnología consiste e

    Sep 12, 2005

  • DFI
    The Design Of Deepwater Wharves Which Are In The Complex Geological Conditions Of Pearl River Estuary

    By F. W. Liang

    The geology of pearl River estuary belongs in strong weathered rock quaternary geological systen, so the conditions are complication. Since 80's we built the first deepwater wharf of Shenzhen chi

    Jan 1, 1991

  • NIOSH
    OFR-146(2)-82 Sprayfan System - Results Of Mine Testing - Volume III

    By W. E. Schroeder

    Two underground installations of the sprayfan system are described and evaluated. The spray fan proves capable of reducing by 1300 percent downtime due to high methane. Spray fan face ventilation at 2

    Jan 1, 1981

  • AUSIMM
    Mineralogy of the Green Leader Gold Ore at Kalgoorlie, Western Australia

    Concentrations of bright green material in the "Golden Mile" of Kalgoorlie, which carry particularly high gold values, are known locally as "green leader".This assemblage consists

    Jan 1, 1977

  • AUSIMM
    A Simple On-Stream Xanthate Monitor

    On-stream determination of xanthate concentrations can be made by photometric measurements at 313 nm.A simple double-beam instrument was developed for this purpose. A mercury lamp is used as the light

    Jan 1, 1973

  • SME
    Polysulfides As An Alternative Green Gold Leaching Technology - Preprint 09-103

    By D. Earley

    High metal prices and new world trade standards and accounting for environmental liability in financial disclosures are creating markets for metals commodities that are produced using ?green technolog

    Jan 1, 2009

  • AUSIMM
    Continuous Surface Mining of Medium - Hard Materials

    By Halvorsen N

    For mining medium-hard materials on the surface, "Continuous Surface Miners" have been employed for some years. The latest generation surface miner extends the performance of this type of machine t

    Jan 1, 1990

  • AUSIMM
    Shaft Excavation Using the Borehole Rising Method

    This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of

    Jan 1, 1959

  • DFI
    1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papers

    By J. Hartikainen

    19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an

    Jan 1, 1994

  • SME-ICGCM
    The Influence Of Massive Sandstones In The Main Roof On Longwall Support Loading

    By A. M. Richardson

    The significance of a massive sandstone unit in the immediate roof to longwall support weighting is well known. If the unit lies in the main roof above the zone of caving, its influence becomes more d

    Jan 1, 1996

  • SME
    Coal mining research - Growth in energy demand can be met while reducing injuries and fatalities

    By Wayne N. Marchant

    Introduction The issue of coal mining safety plays an important role in the United States' growing dependence on coal to supply its future needs. This article will address the federal government

    Jan 4, 1987

  • AUSIMM
    Thermodynamic and Phase Diagram of the Lead-Lead Sulphide Binary System

    The published liquidus data on the Pb-PbS system have been correlated on the basis of one-coefficient Margules equations. Thermodynamic properties of the components of this system have been obtained,

    Jan 1, 1972

  • AUSIMM
    Contacts

    This paper on the relation of Granite and Sedimentary Contacts to Victorian Mining will, it is hoped, be of interest to members of the Institute.The broad fact that gold often occurs' at or near

  • AUSIMM
    Geological Structure of the Hill 50 Gold Mine

    The Hill 50 Gold Mine is situated at Boogardie, 3 miles on a bearing of 295 degrees from; Mount Magnet township. Mount Magnet lies 300 miles north-north-east of Perth, Western Australia (Fig. 1).The o

    Jan 1, 1960

  • AUSIMM
    Size Separation Pretreatment and Alumina Recovery from Bayer Red Mud

    Size Separation Pretreatment and Alumina Recovery from Bayer Red Mud

    Sep 13, 2010

  • SME
    Daniel Island Surprise?Sand Lens Lurking In Cooper MARL, Charleston, SC

    By Ray Brainard

    Charleston Water System?s Daniel Island Extension Tunnel, initially thought to be the simplest of the four replacement tunnels to design and build, became the most challenging after the discovery of a