Search Documents

  • NIOSH
    RI 5805 Development Of A 10,000-Ampere Cell For Electrorefining Titanium ? Summary

    By F. P. Haver

    The Federal Bureau of Mines developed a 10,000-ampere cell to determine the economic feasibility of producing high-purity electrolytic titanium from mill scrap or offgrade sponge. Operating variables

    Jan 1, 1961

  • AUSIMM
    Measurement of Oxygen Potential in Slags in a Nickel Smelter Using Disposable-tip EMF Cells

    By Conochie D. S, Grave N. C

    Disposable-tip emf cells at present used in liquid steel can be used to measure the state of oxidation of high-iron slags produced in non-ferrous smelting. This provides a new tool for the control and

    Jan 1, 1979

  • AUSIMM
    Pegmont: A Stratiform Lead-Zinc Deposit in the Precambrian of Northwest Queensland

    Stratiform lead-zinc mineralization at the Pegmont prospect occurs as a 4-6 m thick body interbedded within arkose, schist, amphibolite, and pegmatite of the Kuridala Formation in the Eastern Belt of

    Jan 1, 1977

  • AUSIMM
    Boring at the State Coal Mine, Wonthaggi, Vic

    The seams of black coal occurring in Victoria are so disturbed by faulting, wash-outs, thinning, etc., that it is necessary, for the prevention of costly errors in development, that close boring be un

    Jan 1, 1936

  • AUSIMM
    Autogenous-Carrier Effect and Gangue Influence in Fine Particle Flotation of Ilmenite/Titanaugite System

    Autogenous-Carrier Effect and Gangue Influence in Fine Particle Flotation of Ilmenite/Titanaugite System

    Sep 13, 2010

  • CIM
    The Bethlehem Molybdenum Plant

    By E. A. Lowe, A. F. Bellamy, J. W. Smith

    "In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall

    Jan 1, 1980

  • SME
    Specifications For Initial Support In Rock Tunnels

    By William F. Daly, William H. Hansmire

    Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a

    Jan 1, 1985

  • ISEE
    Ground Motions from and House Response to Underground Aggregate Mining

    By Professor of Civil and Environmental Engineering Northwestern University, Mike Wladron, Gordon Revey

    A unique judicial opportunity allowed measurement of the response of three cracks in residential structure to blasting for underground aggregate mining. Instrumented cracks were located in the interio

    Jan 1, 2007

  • AUSIMM
    The Reaction of Anfo Explosives with Mineral Sulphides

    Ammonium nitrate-fuel oil (ANFO) explosives are unstable in hot, reactive sulphide-rich ground at Mount Isa. Under certain conditions associated with background heat, moisture, and chemical impurities

    Jan 1, 1968

  • ABM
    AVALIAÇÃO DAS TEMPERATURAS DE TRANSFORMAÇÃO NO DSC EM LIGA NiTi APÓS O ENVELHECIMENTO COM E SEM CARGA

    By Luiz Alberto dos Santos

    Neste trabalho foram usinados CDPs da liga com composição de 50,9 % at de Ni e, em seguida, as amostras foram envelhecidas em temperaturas entre 350-550 ºC, tensões aplicadas de 60 MPa e tempos de 45

    Aug 16, 2017

  • AUSIMM
    Capping Stations on Broken Hill South Ltd.

    In the Broken Hill South mine tile practice of issuing to the miner a quantity of fuse and a box of caps from which he made up the "rods" required for a particular blast, has been abandoned.

    Jan 1, 1932

  • SME-ICGCM
    Underground Storage, With Emphasis On Storage In Excavated Rock Caverns

    By C. Fairhurst

    Most of the papers designated as being within the topic of underground storage at this Symposium are concerned with aspects of radioactive waste isolation. Although this is, unquestionably, an importa

    Jan 1, 1989

  • DFI
    Float-In Cofferdams

    By Robert B. Bittner

    Large diameter piles (2 to 3 m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned

    Jan 1, 2013

  • IIMP
    Abordaje termodinámico y cinético en el modelamiento de una pila de lixiviación de mineral mixto de cobre

    By Orlando Bernal

    El presente texto aborda el aspecto termodinámico del sistema de lixiviación -en tanto predice los fenómenos que ocurren en el interior de la pila para luego continuar con el análisis del mecanismo ci

    Sep 9, 2007

  • SME
    North American Tunneling Conference Drives Value

    The theme of the 2012 North American Tunneling conference (NAT) was ?Tunneling: Driving Value.? This theme best reflects where the tunneling and underground construction industry is to-day. Major ad

    Jan 1, 2012

  • NIOSH
    IC 9106 Availability Of Elemental Sulfur And Pyrite Concentrate-Market Economy Countries - A Minerals Availability Appraisal

    By D. A. Buckingham

    Engineering and economic evaluations were performed by the Bureau of Mines on 14 Frasch sulfur, 1 native sulfur, and 21 metal sulfide operations in 11 market economy countries. The evaluation included

    Jan 1, 1986

  • SAIMM
    Microstructure Evolution In Ti-6Al-4V Alloy During Hydrogen Dosing At Elevated Temperature - Synopsis

    By L. A. Matthews

    The embrittlement of the Ti-6Al-4V alloy by hydrogen dosing at elevated temperature has been investigated. Metal coupons were subjected to isothermal treatments in a partial hydrogen atmosphere in the

    Jan 1, 2011

  • AUSIMM
    The Mount Kare Gold Project

    By Caithness SJ, Heape JMT

    Following the discovery by CRA of gold at Mt Kare, and the subsequent 1988-90 gold rush, mechanised mining of the alluvial resource is now being carried by a company jointly owned by CRA (51%) and

    Jan 1, 1991

  • CIM
    Utilization of Surfactants in Recovery of Gold Employing Carbon

    By A. T. Robles, L. Buckingham

    "When certain gold ores containing pyrite, graphite, humates and fumates or other organic compounds which are possibly adsorbed on clay minerals are treated with aqueous solution of alkali metal cyani

    Jan 1, 1992

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010