Search Documents

  • DFI
    Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil Conditions

    By Seffen Leppla, Rolf Katzenbach, Matthias Seip

    "Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig

    Jan 1, 2014

  • ISEE
    Borehole Geophone Method for Estimating Tunnel Blast Vibration Propagation

    By Kyle Ott, Bernard Daly, Syed Haq, Douglas Anderson, Parsons Brinckerhoff

    Drill and blast was determined to be the most cost-effective means of excavating the Raw Water Tunnel (RWT) for the Croton Water Treatment Plant in the Bronx, New York City. One of the major issues co

    Jan 1, 2012

  • AIME
    Coal - Progress Report-AField Study in Acid Mine Drainage

    By J. R. Lucas, R. L. Frantz

    Mine sealing programs for the alleviation of acid mine drainage were begun by the Federal Government in the '30's. As part of an acid mine research project to The Ohio State University, a fi

    Jan 1, 1961

  • AUSIMM
    Contributions from Improved Surface Mine Haulage Road Design, Operation and Management Techniques to Sustainable Development

    Operating well designed and maintained surface mine haul roads is the key to minimising truck haulage costs - in itself a significant component of the total cost per tonne mined. Existing and proposed

    Jun 1, 2010

  • SME
    The Finch-McIvor Functional Performance Based Grinding Circuit Modeling System (1c457710-bd59-4870-818a-6a8763f4c366)

    By J. Finch, R. McIvor

    This paper presents the development of a new grinding circuit steady-state modeling system. It is fundamentally based on the “functional performance equation”, which has now been used to improve the p

    Jan 1, 2007

  • SAIMM
    Friction Hydro Pillar Process As An Alternative Repair Technology For Creep Evaluation Sites On Thick-Walled 10CrMo910 Creep-Resistant Steel Structures ? Synopsis

    By D. L. H. Bulbring

    The removal of a cylindrical core from thick-wall sections for creep analysis by the relatively new Weldcore® process represents a very exciting methodology for obtaining more representative creep dam

    Jan 1, 2013

  • AUSIMM
    Valuable Components Recovery from Lead-Zinc Metallurgical Slag

    Valuable Components Recovery from Lead-Zinc Metallurgical Slag

    Sep 13, 2010

  • AUSIMM
    Developments at the Rosebery Concentrator of the Electrolytic Zinc Co. of Australasia Ltd.

    Previous published papers by Fraser (1), Hey (2), and Stillwell (3), have given respectively, details of:-1. The practice in the pilot plant operated at Zeehan for the treatment of ores from the Roseb

    Jan 1, 1949

  • CIM
    Miocene Epithermal Au-Ag Vein Mineralization, Dixie Claims, Midas District, North-Central Nevada; Characteristics and Controls

    By E. T. C. Spooner, Ioannou S. E.

    "Abstract- The Dixie Zone Au-Ag deposit is a low sulfidation (adularia-sericite) epithermal system located 1.4 km from the producing Ken Snyder mine (7.0 M oz Au equivalent reserve/resource), Midas Mi

    Jan 1, 2000

  • SAIMM
    South African Coal Pillar Database

    By J. N. Van der Merwe

    The research described in the paper was aimed at providing standardized information of cases of failed and intact coal pillars in the form of databases to researchers. It also offered the opportunity

    Jan 1, 2006

  • TMS
    Granulation Of Molten Materials

    By David Norval

    Water solidification of mattes, metals, alloys and certain slags with high metal entrainment has customarily not been practiced due to the belief that such processes are too dangerous and unproven in

    Jan 1, 2006

  • DFI
    Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary

    By Francis D. Leathers

    Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform

    Jan 1, 1994

  • SME
    Extruded Concrete Lining—The Future Lining Technology for Industrialized Tunnelling

    By Siegmund Babendererde, Jan O. Babendererde

    Extruded Concrete Lining combines technological and financial advantages. The tunnel lining is reliably embedded in the surrounding ground as the fluid concrete is extruded at constant pressure direct

    Jan 1, 2001

  • ISEE
    An Analytical Approach For Diagnosing and Solving Blasting Complaints

    By Douglas Rudenko

    Have you ever had a neighbor complain about a blast one day, but says the next day’s blast was better, even though the Peak Particle Velocity (PPV) increased? How about neighbors that complain about a

    Jan 1, 2000

  • SME
    Construction of the Combined Sewage Overflow Tunnel for the City of Fall River

    By Shemek Oginski

    The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast

    Jan 1, 2005

  • CIM
    Deformation and Structural Controls on Gold Mineralization in the Clarence Stream Shear Zone, Southwestern New Brunswick, Canada

    By K. G. Thorne, D. R. Lentz, A. F. Park

    "The Main zone of the Clarence Stream gold deposit is hosted by a shear zone adjacent to the Saint George batholith in southwestern New Brunswick. The mineralization history relates to progressive def

    Jan 1, 2008

  • NIOSH
    RI 8485 Structure Response and Damage Produced by Airblast From Surface Mining

    By David E. Siskind

    The Bureau of Mines studied airblast from surface mining to assess its damage and annoyance potential, and to determine safe levels and appropriate measurement techniques. Research results obtained fr

    Jan 1, 1980

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • AUSIMM
    Iron Through the Ages

    Iron production in one year exceeds that of all other metals combined in ten years. It is a huge industry that started from a modest furnace producing one - two kilograms metal per day to a gigantic

    Jan 1, 1999

  • SME-ICGCM
    Sizing Of Final Stumps For Safer Pillar Extraction

    By Christopher Mark

    Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extr

    Jan 1, 2001