Search Documents

  • DFI
    Driven Pile Foundation Design and Construction Issues for a Highrise Building in Manhattan

    By Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer

    "This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,

    Jan 1, 2016

  • SME
    DSU TBM for Vishnugad Pipalkoti - TBM Design Development for Large Diameter Rock Tunnels under the High Covers of the Himalaya

    By Remo Grandori

    "INTRODUCTIONDouble Shield TBMs were introduced in the market in the early seventies with three main targets:• Increase the TBM performances in term of advance per day thanks to the ability to erect a

    Jan 1, 2016

  • DFI
    Load Tests on Drilled Shafts at Goethals Bridge Replacement

    By John P. Turner, Steven S. Dapp, Dan A. Brown

    "The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft

    Jan 1, 2016

  • DFI
    Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”

    By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini

    "The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for

    Jan 1, 2016

  • SME
    Metro Rome Line “C”: Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni, Line “A” (88718b03-9244-4135-bce5-d10b55d2684f)

    By Salvatore Fancello, Ferruccio Cribari, Amerigo Tanzi, Mauro D’Angelo, Massimo Lodico, Alessandro Bertero, Eliano Romani, Tommaso Gondolini, Fabio Giannelli

    "The new metro line “C” entails the construction and rehabilitation of 24 stations and 21,5 km of metro line, 13 of which carried out underground; the new metro line will improve the transportation sy

    Jan 1, 2016

  • CIM
    The Extractive Metallurgy of Agromined Nickel

    By William Hawker, James Vaughan, Jeff Chen, Antony van der Ent

    "Nickel agromining utilizes hyperaccumulator plants (“metal crops”) to extract nickel from low-grade soils, a process that yields high-grade nickel bio-ore. This feedstock is further processed into a

    Jan 1, 2016

  • DFI
    Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West Africa

    By Maurizio Siepi, Bruno Vingiani, Claudio Asioli

    "The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill

    Jan 1, 2016

  • DFI
    Value-Engineering of H-Pile Foundations in Karstic Geology

    By Rachael M. Fischer, Daniel J. Woeste, Terence P. Holman

    "A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vert

    Jan 1, 2016

  • SME
    Unexpected Post-Excavation Damage to a 28"-Thick Segment Lining - Failure Mechanism and Rehabilitation Measures

    By Jens Classen, Martino Gatti

    "GENERAL PROJECT DATAThe Sparvo Tunnel is part of the “Variante di Valico” project, a new 65km (40mi) highway link between Bologna and Florence, designed to renew the existing A1 route which connects

    Jan 1, 2016

  • DFI
    Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure

    By Andrew R. Klaetsch, Peter W. Deming

    "The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th

    Jan 1, 2016

  • DFI
    UB Digs Deep and Builds Over Adjacent Subway for New Medical Building Hub

    By Lisa R. Papandrea, David Chen, Walter E. Kaeck

    "Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su

    Jan 1, 2016

  • DFI
    Risk Assessment and Quality Control on Grouted Waterretaining Layers by Observational Engineering

    By Bartho J. Admiraal

    "As part of the Schiphol-Amsterdam-Almere project, the largest aqueduct in Europe is being built in order for the A1 motorway to cross the Vecht River. The A1 consists of 12 lanes and the total width

    Jan 1, 2016

  • DFI
    Rock Excavation and Underpinning below a 19-Story Building

    By Kevin P. Gleckler, Steven C. Highfill

    "Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which

    Jan 1, 2016

  • DFI
    Screw and Straight Pile Behavior under Cyclic Compressive Loading in Dense Sand

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano, Shinya Tachibana

    "The helical piling system provides solution to many geotechnical related problems due to its quick installation, higher compressive and pullout resistance, no wastage of material, workable in limited

    Jan 1, 2016

  • DFI
    Seepage Barrier at Bolivar Dam

    By Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol

    "The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da

    Jan 1, 2016

  • DFI
    Seepage Barrier Mix Design Development, Installation, and Evaluation

    By George W. Little, John Councilman

    "The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe

    Jan 1, 2016

  • DFI
    Settlement Evaluation of Large Water Storage Tanks Under Challenging Conditions

    By Ben M. Lewis, Yogesh Prashar

    "The East Bay Municipal Utility District (EBMUD) is a major water utility service providing water to over 1.3 million people in the eastern San Francisco Bay Area. EBMUD manages 28 dams at 5 terminal

    Jan 1, 2016

  • DFI
    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • DFI
    Sheikh Jaber Al-Ahmad Causeway Project in Kuwait - A Case Study

    By Paolo Cavalcoli, Federico Pagliacci, Marco Chiarabelli

    "The Sheikh Jaber Al-Ahmad Causeway Project in Kuwait is estimated at approximately $US3.7 billion and consists of constructing a causeway across the Kuwait Bay, connecting the Shuwaikh Port with the

    Jan 1, 2016

  • SME
    The 3D Geological Model of the Karavanke Tunnel, Using Leapfrog Geo

    By Tina Živec, Žibertm Marko

    "Civil design has changed in many ways using BIM (Building Information Modelling) technology in its most recent form. Such a technological breakthrough has not been successful so far in traditional or

    Jan 1, 2016