Assessing the Interaction between the Excavation of a Large Cavern and Existing Tunnels in the AlpsBy Edoardo Misano, Magali Schivre, Martino Semeraro, Alain Bochon
"INTRODUCTIONThe Laboratoire Souterrain de Modane (LSM) is an underground research laboratory located in the Western Alps on the French – Italian border. It is located in the middle of the 13km long F
Jan 1, 2016
-
Squeezing Ground: Conditions & Lessons Learned at the New Irvington TunnelBy Yiming Sun, David Tsztoo, Rick Nolting, Adam M. Wirthlin, Rebecca Fusee
"Excavation and initial support of the New Irvington Tunnel presented significant challenges, including rapidly changing ground conditions, heavy ground loads, and squeezing. Such behaviors were antic
Jan 1, 2016
-
Método adecuado de excavación subterránea según clasificación de excavabilidadBy Pedro Alejandro Samané Tuni
El presente texto describe la metodología de investigación adecuada para la excavación subterránea a través de la clasificación geomecánica según: RMR (Bieniawski), Q (Barton), Romana, Deere y Palms
Jan 1, 2016
-
Examination of a Newly Developed Mobile Dry Scrubber (DS) for Coal Mine Dust Control ApplicationsBy J. Noll, D. Yantek, B. Kendall, J. A. Organiscak
"A self-tramming remotely controlled mobile Dry Scrubber (DS) was developed by J. H. Fletcher and Co. under a contract with the National Institute for Occupational Safety and Health’s Office of Mine S
Jan 1, 2016
-
Pipeline Tunneling by Connecting Conventional and TBM Methods under High Groundwater PressureBy Tsunenori Shibata, Kazunori Jimbo, Kaoru Toya, Masafumi Matsumoto, Jinya Mitsui, Toshinori Tsuji
"The Toyama Line is under construction as a natural gas pipeline with a length of 102 km from Itoigawa City to Toyama City. A 2 km-long tunnel section of the pipeline that we are reporting here is bei
Jan 1, 2016
-
Process Development Testing for Comminution Circuit Design"Metallurgical process development in greenfield projects must define the comminution flowsheet and establish the equipment sizes that are required to deliver the project design criteria. These are cr
Jan 1, 2016
-
GMT: A Spreadsheet-Based Software to Predict Charge Shape and Trajectory in Tumbling MillsBy S. Banisi, M. Maleki-Moghaddam
Direct observation of charge shape and its motion in industrial mills is not possible; therefore, a combination of analytical and physical studies is used to determine charge trajectory. Software pack
Jan 1, 2016
-
Utility of Mass-Balanced EH-pH Diagrams II: Stoichiometry of Cu-As-S-H2O System (bd7284b8-7fb9-4367-afdc-4788bfdb0889)By H. Huang, R. N. Gow
"In Part I, Gibbs’ phase rule was applied to mass-balanced EH-pH diagrams for the Cu-As-S-H2O system. The diagrams were generated using the stoichiometry of enargite as a basis. In this study, the cal
Jan 1, 2016
-
Flotation of Silver from Copper Ore after Milling in the Presence Of Grinding Media of Different CompositionsBy Andrzej Luszczkiewicz, Magdalena Duchnowska, KGHM Polska Miedz S. A., Witold Pawlos, Jan Drzymala, Alicja Bakalarz, Przemyslaw B. Kowalczuk
Numerous data in the literature confirm that the chemical composition and consumption of grinding media influence electrochemical properties of flotation suspension as well as effectiveness and select
Jan 1, 2016
-
Pretreatment Methods for Rare Earth Element Extraction in Supercritical Carbon DioxideBy R. V. Fox, L. K. Sinclair, D. L. Baek
"In this study, rare earth elements were recovered from bastnasite concentrate and waste fluorescent lamp phosphors using supercritical carbon dioxide extraction with a nitric acid/tributyl phosphate
Jan 1, 2016
-
Mining Stakeholder Analysis Using Discrete Choice Theory: A Case Study in Salt Lake CityBy N. Weidner, V. A. Samaranayake, K. Awuah-Offei, S. Que
"This research sought to facilitate improved stakeholder (community) analysis using discrete choice theory (DCT). The work considered 16 project attributes and four demographic factors. The discrete c
Jan 1, 2016
-
Effect of Yield Strength on Wear Rates of Railway WheelsBy J. W. van der Merwe, A. S. Bolokang, M. J. Phasha, V. J. Matjeke, C. Moopanar
"Excessive wear rates on railway wheels can result in rolling-stock derailments. If wear is detected early the possible derailments can be prevented by prematurely replacing wheelsets, although the in
Jan 1, 2016
-
Options to Control Groundwater-Based Georisks along Geological Faults in the Large Scale Area of Influence of an Open Pit MineBy Markus Papst, Denise Millier, Daniel Beckers, Axel Preusse
"At an open-pit lignite extraction mine in Germany, groundwater has to be pumped over a large area, which leads to subsidence at the surface. As long as the geology of the area of influence is homogen
Jan 1, 2016
-
Blast Master Plan: the Key to efficiency and optimization. Case study at Ellatzite copper mine.By Grigor Mishev, Georgi Petrov, Benjamin Cebrian
Before designing a single blast or all the blasts on a pit level, it is critical to assess the main goal on each. To do this, a series of constraints must be taken into account: wall protection, vibra
Jan 1, 2016
-
A Study on Direct Oxalate Precipitation for REE Recovery from a Low-Grade REE Pregnant SolutionBy W. Griffith
"While oxalic acid precipitation practices are commonly applied on purified rare earth elements (REEs) pregnant leaching solutions (PLS), few efforts have been reported using oxalic acid (OXA) to reco
Jan 1, 2016
-
Development of an Electrochemicalmicrobial Sensor for Analyticaldetermination of Pb(II) Ions in Aqueous SolutionBy R. V. Kumar, C. Schwandt, S. Subramanian, S. Sampath, S. Vimalnath
Waste waters and industrial effluents containing toxic heavy metals such as Pb, Hg, As and Cr, beyond permissible limits (0.1 ppm, 0.01 ppm, 0.02 ppm and 0.05 ppm, respectively) (WHO, 2011), pose seri
Jan 1, 2016
-
Gems and Gemstone Mining in Sri LankaBy J. Weyer
"Colored gemstones are most often mined in small scale artisanal mining operations. Sri Lanka is well known as source for precious stones since thousands of years. Gemstones are mine in small open pit
Jan 1, 2016
-
An Evaluation of an E-Field Through-the-Earth (TTE) Communications System at an Underground Longwall Mine in West Virginia"A commercially available Through-the-Earth (TTE) communications system was evaluated at an active underground longwall mine in West Virginia. This TTE system uses electric field (E-field) sensing to
Jan 1, 2016
-
Preserving Highwall Stability by Shifting the Dominant Blast Vibration Frequency with Electronic InitiationBy Charles Zdazinsky
"The Multiple Seed Waveform (MSW) blast vibration model, a type of waveform superpositionmodeling developed by Orica Inc., uses vibration data that is collected from a signature hole blast tocharacter
Jan 1, 2016
-
Shield Tunneling in Pure Sands - Merging the Application Fields of EPB and Slurry Shield TechnologiesBy Carlos Henrique Turolla Maia, Ulrich Maidl, Marc Comulada, Julio Claudio Di Dio Pierri
"Pure sands are typically the domain of slurry shields due to their high permeability and their granular characteristics. However, the Earth Pressure Balanced (EPB) shield machine technology has advan
Jan 1, 2016