Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Imaging Of Minerals, Ores And Related Products To Determine Mineral Characteristics (62b10345-9d28-4191-957f-3c363fe80798)By W. Petruk
Imaging is a fundamental requirement when characterizing minerals, ores and related products. Images are used for presentation, texture analysis, characterization, image analysis, identification, etc
Jan 1, 2001
-
Wall Control at the Freeport Grasberg Opencut Mine: Vibration and Gas Penetration Measurements as a Precursor to ImprovementsBy A. Spathis, I. Yacob, A. Labriola, G. Smith
Wall control is a significant issue for many mines. Improvements to the design process for blasts adjacent to temporary or final walls will require better measurement tools and predictive models. Oric
Jan 1, 2001
-
Bonneville Power Administration Cold Creek Pipeline Replacement — Vancouver, WashingtonBy Robert J. Guardia, James Rustvold, Robert A. Robinson, Christopher A. Robertson
In 1999, the Bonneville Power Administration (BPA) replaced approximately 730 m(2,400 ft) of damaged 42- and 36-inch concrete pipe by microtunneling Permalock pipe through sand and partly below ground
Jan 1, 2001
-
Soil Mixing - Title ? Table Of ContentsJan 1, 2001
-
A Mathematical Model for the Control of Metallurgical Properties of the Product SinterBy E. F. Vegman, Ndabezinhle Dube
"In the practice of conventional sintering, production is always afflicted with the problem of being unable to get a uniform quality of produced sinter in the bed. Invariably the top layer of the sint
Jan 1, 2001
-
Sizing Of Final Stumps For Safer Pillar ExtractionBy Christopher Mark
Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extr
Jan 1, 2001
-
Homestake Mining Company, Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline StudiesBy C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani
The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine, or for the expansion of an existing mine, can range between 9 months to 24 months, or more. Th
Jan 1, 2001
-
Thermo-Mechanical Coupling Finite Element Analysis of Sheet Metal Extrusion ProcessBy C. Y. Tang, Z. H. Chen, T. C. Lee
"In sheet metal forming process, the forming limit and strain distribution are governed by plastic instability and fracture following strain localization. It has been proved that the temperature gradi
Jan 1, 2001
-
Improving Blasting by a Team Approach at the Henty Gold MineBy R Wedmaier
Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û
Jan 1, 2001
-
Presentation #2 - Non-Destructive Testing For Drilled Shafts - ContentsBy Frank Rausche
Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world
Jan 1, 2001
-
Wall Control Blasting Practices at BHP Billiton Iron Ore Mt WhalebackBy C T. Dunbar, P A. Walker, G E. LeJuge
A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices t
Jan 1, 2001
-
A Step Towards Understanding The Behaviour Of Wider Roadways In South African CollieriesBy George B. Quaye
Conventionally, roadways in South African collieries are 6 to 7 m wide. This dimension is chosen so as to allow maneuvrability of appropriate mine machinery and equipment, to meet production requireme
Jan 1, 2001
-
Design of the Second Block Cave at Northparkes E26 MineThe pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur
Jan 1, 2001
-
Mechanical Mining In Hard Rock: A Glimpse Into The FutureBy R. J. Robbins
The mechanization of hard rock underground mines offers a large potential for reducing cost, improving efficiency, and increasing profitability. However, in spite of serious efforts by quite a number
Jan 1, 2001
-
Dynamic Model for a Vapor Recovery in Carbo Thermic Aluminum ProcessBy B. Erik Ydstie, Tor Lindstad, Vianey Garcia-Osorio
"As a result of the high temperatures present in a Carbothermic Aluminum Process the content of aluminum and aluminum sub-oxide in the gases leaving this process is high. These gases as well as energy
Jan 1, 2001
-
2001 RMCMI Mine Rescue Performance EvaluationThe tenth annual Mine Resale Evaluation was held in conjunction with the RMCMI 2001 convention at the Steamboat Springs Sheraton Resort, Steamboat Springs, Colorado June 23 through 26. The purpose of
Jan 1, 2001
-
Industrial Minerals Derived from Volcanic Rocks in New ZealandBy T Christie
Tertiary volcanic rocks make up a significant proportion of the surficial cover rocks of New Zealand, especially in the Taupo Volcanic Zone. Industrial minerals that are associated with or derived fro
Jan 1, 2001
-
Using airborne magnetic and electromagnetic data to monitor mine tailings in Copper Cliff, northern OntarioBy J. Shang, P. Howarth, B. Morris
Tailings from the nickel refinery in Copper Cliff, Ontario, consist of fine silicates mixed with a variable amount of conductive and magnetic minerals mainly associated with sulphides and iron oxides.
Jan 1, 2001
-
Determination And IT-Supported Evaluation Of Rock Mechanical Parameters And Their Utilization During Application Of Roof Bolting TechniquesBy Nikolaos Polysos
For the planning and driving of gateroads supported by roof bolts a practical concept has been developed in order to determine the geological and rock mechanical parameters derived from exploration dr
Jan 1, 2001
-
Systems Used In Coal Mining Development In Long Tendon ReinforcementBy Brian Clifford
A wide range of different cablebolt systems are available and in use in hard rock and coal mines around the world. The birdcaged cablebolt was initially used in UK coal mines in conjunction with ro
Jan 1, 2001