Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Practice Of Refining Impure Indium In Shaoguan SmelterBy Han Yi
The coarse indium ingots produced by Shaoguan smelter contained a lot of impurities. In order to produce the high pure indium with the purity more than 99.99%, the appropriate refining processes were
Jan 1, 2005
-
A Field Demonstration of a Modified Wet Scrubber for Dust Control in an Illinois Coal MineBy A Patwardhan, M M. Alam, K K. Thatavar
A commercial wet scrubber was used in the SIU-Joy dust control laboratory to test several concepts for improving the dust control efficiency of a wet scrubber. The concepts tested included two filter-
Jan 1, 2005
-
Effect of Cu and Ni on the dimensional stability of aluminum alloy used to internal combustion engine at elevated temperatureBy M. Tadayonsaidi
The effect of alloying elements on the mechanical properties and thermal expansion of 336 casting alloy usually used as piston alloy which has low thermal expansion and very good high-temperature mech
Jan 1, 2005
-
Suggested and Prescriptive Means and Methods—Are They Really in the Owner’s Interest?By Gary Almeraris, Vincent Jr Tirolo
Traditionally, “Means and Methods” were the sole responsibility of Contractors. However, because of a number of litigious projects in the 1970s, Owners and their Engineers began including Suggested Me
Jan 1, 2005
-
Real-time neural network application to mine fire ? nuisance emissions discriminationBy J. C. Edwards
The National Institute for Occupational Safety and Health (NIOSH) implemented a real-time neural network system which can discriminate mine fires from nuisance diesel emissions as part of an atmospher
Jan 1, 2005
-
Multiple Seam Mining Interactions: Case Histories from the Harris No. 1 Mine (b50cab1b-ba36-4377-a652-1d452c62f433)By Frank E. Chase
The Harris No. 1 Mine, located in Boone County, WV, has been longwalling the Eagle Coalbed for over 30 years. Harris has experienced numerous interactions associated with the extensive room-and-pillar
Jan 1, 2005
-
Suitability of PEM fuel cells for underground mining vehicles (35a3b3ff-1d4d-456b-a989-2c3e85f551b7)By G. Bonnell, W. Lidkea, M. C. Bétournay, E. Edwardson
"Hydrogen fuel cells are a known technology, having been applied to stationary (e.g equipment, buildings, and power plants) and vehicle applications (e.g transit buses and space shuttles). There is cu
Jan 1, 2005
-
Assessment of Settlement Due to EPBM Tunnelling in London, UK, on CTRL Contract 240By Keith Jones, Michael Francis
Contract 240 of the Channel Tunnel Rail Link comprises construction of twin4.7 km long running tunnels through a densely populated area of East London. The tunnels were constructed by EPBM in Sands an
Jan 1, 2005
-
Work-Life Balance and Atypical Working Hours: Does FIFO Pass the Epicurean Test for Happiness?When I was first asked to give a paper on work-life balance in the mining industry I was both excited and aware of the incongruity of my position. I have never worked in mining operations nor have I h
Jan 1, 2005
-
Seafloor Deployed Core Drill Successful In Deepsea TestBy M. E. Williamson
In September 2005 Williamson & Associates, Inc. delivered the BMS2 remotely operated seafloor coring system to the Japan Oil, Gas & Minerals National Corporation (JOGMEC). During acceptance trials ab
Jan 1, 2005
-
Late Metamorphic Structural Zones in the Otago Schist: Prospective Hosts for Gold MineralisationBy M Begbie, R J. Norris, D J. MacKenzie
The Otago Schist is crossed by numerous deformation zones that formed in the latter stages of metamorphism and uplift of the metamorphic belt. These deformation zones are long (tens of km) linear feat
Jan 1, 2005
-
Edmonton South LRT Twin TunnelsBy Steve Skelhorn
Edmonton South LRT is the latest expansion of the Subway system in Edmonton, Alberta, Canada: Consisting of twin 5.8m segmental lined tunnels, 280m long, driven by a Lovat EPB machine. The key challen
Jan 1, 2005
-
The Flotation of Water-Soluble Minerals ù Peculiarities and New TechnologiesBy V Novoselov, R Sabirov
Flotation processing technology of water-soluble minerals has made it possible to realise, since the 1960s, the wide scale industrial processing of potash and potassium-magnesium ores (about 200 milli
Jan 1, 2005
-
Keynote Address at the 23rd International Conference on Ground Control in Mining, August 3-5,2004By Lewis Dr. Wade
It is really an honor and pleasure to be here at the 231d International Conference on Ground Control in Mining. My name is Lew Wade. Until recently I served as the Associate Director of Mining for NIO
Jan 1, 2005
-
A Reclamation Program to Achieve sustainable Postmining Land Uses at the Black Mesa and Kayenta MinesBy Vern Pfannenstiel
Jan 1, 2005
-
Bord And Pillar Applications On The Platinum Mine: T-Cut Mining MethodBy C. C. Oosthuizen
Paper written on project work carried out in partial fulfilment of Technikon Practical Training Frank shaft is mining both Merensky reef and UG2 reef. The Merensky orebody is almost depleted and th
Jan 1, 2005
-
Results of Self-Heating Tests of Australian Coals Conducted in a 16 m<sup>3</sup> ReactorA research and testing facility has been developed at Simtars to allow the spontaneous combustion testing of coal on a large scale. In this adiabatic reactor, the coal particle sizing is closer to tha
Jan 1, 2005
-
A Ventilation System for Large Block Cave MinesBy M Stephens, T A. Sutra
Currently, there are several open pit mines with production rates of about 200 000 tpd of ore that are reaching the end of their economic lives. In most cases, the remaining orebody extends to depths
Jan 1, 2005
-
Portland, Oregon’s Other CSO TunnelsBy Michelle Lostra, Red Blanchette, Jan Babendererde, Greg Colzani
The City of Portland’s Westside CSO Project is constructing a deep tunnel system to reduce combined sewer overflows (CSO) from entering the Willamette River. Several kilometers of microtunneled pipeli
Jan 1, 2005
-
BWARI Tunneling UnderwayBy Thomas L. Richardson, David R. Chapman, Gary W. Gilbert
The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i
Jan 1, 2005