Search Documents

  • SME-ICGCM
    Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in Indonesia

    By Takashi Sasaoka

    Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t

    Jan 1, 2007

  • SME
    Finding Added Value At Newmont Through Large-Scale Mining Sequence, Cutoff Grade And Process Optimization Using Mixed Integer Linear Programming

    By L. Clark

    Despite near-record commodity prices, the mining industry continues to search for ways to maintain profits in these times of steadily increasing energy prices and steadily decreasing grades. The pres

    Jan 1, 2007

  • DFI
    Compressibility Behavior Of Tropical Peat Reinforced With Cement Column

    By Y. Duraisamy

    This paper presents the compressibility of tropical peat reinforced with cylindrical cement column. When a cement column installed vertically in peat, its compressibility was reduced because of the ha

    Jan 1, 2007

  • SAIMM
    Greenhouse Gas Emissions From Ferroalloy Production

    By S. E. Olsen, T. Færden, G. Tranell, T. Lindstad, J. Lubetsky

    The authors are lead authors for chapter 4.3 ?Emissions from Ferroalloy Production? in ?2006 IPCC Guide-lines for National Greenhouse Gas Inventories, Volume 3?. The paper discusses the methods to

    Jan 1, 2007

  • DFI
    Piling Framed Tie down Concrete Retaining Wall

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins

    Jan 1, 2007

  • AUSIMM
    Efficiency of the Detritor Mills at Zinifex Century Mine

    By D P. Obeng, L Reemeyer, R Holmes

    The Zinifex Century Mine employs a large number of Detritor mills for fine and ultra-fine grinding to liberate silica and sphalerite at 80 per cent passing 7.5 microns before final zinc flotation. A j

    Jan 1, 2007

  • SME
    Excavation And Support Of A Water Tunnel Through The Hayward Fault Zone

    By Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo

    The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p

    Jan 1, 2007

  • AUSIMM
    A Review of Processing at the Cannington Ag/Pb/Zn Mine

    By G Clarke

    Commissioning of the Cannington processing plant began in October 1997. The nameplate capacity (of 1.55 million tonnes of ore per annum) was achieved relatively quickly. Since then (like many mines) t

    Jan 1, 2007

  • CIM
    Past And Future Cycles Of Copper: Regional And Global

    By M. D. Gerst

    The degree to which copper will continue to be in an integral part of the world economy in the future will depend largely on the dynamics of global economic development, the primary and secondary copp

    Jan 1, 2007

  • SAIMM
    Liner Optimisation To Improve Availability Of The Ridgeway SAG Mill (ce87862d-0ddc-4fb1-a4ed-b071f2daa7ac)

    Mill relining is a major contributor to overall plant downtime. Reducing the number of mill liner pieces removed from and replaced in the mill has a direct impact on the overall reline time and in tur

    Jan 1, 2007

  • SAIMM
    Modelling Of Thermal Profile In Submerged-Arc Furnace And The Influence Of Composition Of Ore On The Thermal Profile

    By K. M. Godiwalla, S. Ranganathan

    The thermal state in submerged-arc furnaces (S.A.F.) producing ferro alloys is important for the conditions of both the grade of alloy produced as well as specific energy consumption. The temperature

    Jan 1, 2007

  • AUSIMM
    Diesel Particulate Matter in Underground Mines ù Controlling the Risk

    By F Djukic, T Fisher, G Irving

    Questionnaires were sent to 12 underground metalliferous mines in Queensland to enquire how these mines control diesel emissions from mobile diesel engines used underground. Where responses or control

    Jan 1, 2007

  • SAIMM
    The New ANSI/HI Centrifugal Slurry Pump Standard (55ce4e36-4549-4541-a51d-964cd4c3e9b4)

    By G. R. Addie

    The Hydraulic Institute has completed the task of developing a new ANSI/HI standard 12.1-12.6 (2005) for rotodynamic (centrifugal) slurry pumps covering nomenclature, definitions, applications, and op

    Jan 1, 2007

  • SAIMM
    Design Of A Modern Large Capacity FeNi Smelting Plant

    By J. Kempken, R. Degel, J. Kunze, R. König

    The FeNi technology is currently dominated by high-power submerged arc furnaces, often designed as smelter as "two-inline-solution". To achieve the intended high efficiency, state-of-the-art design in

    Jan 1, 2007

  • CIM
    Frother Analysis: Procedure and Plant Experiences

    By James A. Finch, Stéphanie Gélinas

    "A colorimetric technique, originally developed for methyl iso butyl carbinol (MIBC) based on the Komarowsky reaction, has been extended to a wide range of common mineral flotation frothers. The proce

    Jan 1, 2007

  • SAIMM
    Reduction Of Chromite Ore At Different Flow Rates Of Inert Gas

    By Dolly Chakraborty, S. Ranganathan, S. N. Sinha

    Pre-reduction of chromite outside the submerged-arc furnace (SAF) can significantly lower the specific power consumption in the SAF process. Conventional processes for the pre-reduction of the ore ope

    Jan 1, 2007

  • SME
    Thermogravimetric Study Of Carbon Dioxide Adsorption On Alumina-Supported Calcium Oxide

    By T. Yegulalp, R. Farrauto, A. Belova, M. Castaldi

    Calcium oxide, with its ability to capture and store carbon dioxide, is emerging to become an important tool in carbon management. Calcium oxide can be used reversibly to capture carbon dioxide in si

    Jan 1, 2007

  • SME
    Portland, Oregon’s Alternative Contract Approach—A Final Summary

    By Paul Gribbon, Julius Strid, Greg Colzani, Jim McDonald

    Portland, Oregon’s $370 million West Side Combined Sewer Overflow Tunnel Project has completed the final phase of construction and commissioning. The construction contract, which began in September 20

    Jan 1, 2007

  • RMCMI
    Environmental Issues and Solutions

    By Wendy Hutchinson

    Jan 1, 2007

  • CIM
    A Thermochemical Model of the Peirce-Smith Copper Converter: Part II, Blowing Copper Stage

    By M. Aushouri, S. H. Mansouri, N. Aminizadeh

    A thermo-chemical model of the Peirce-Smith copper converter in blowing the copper stage has been developed to predict the molten temperature. The key assumption of the model was that white metal and

    Jan 1, 2007