  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: III. Engineering Design and Erection

    A contract for three 20 ft diameter vertically mounted axial flow fans of the same aerodynamic design, was placed by Mount ]sa Mines Limited in 1963. The hydraulic blade pitch changing mechanism, the

    Jan 1, 1967

  • AUSIMM
    Development of the production optimiser through collaboration between Evolution Mining and Minnovare

    By C McCracken, R Landers, B Hesse

    Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to

    Mar 15, 2021

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016

  • CIM
    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • SME
    Development Of The Rapidex Continuous Spiral Drill And Blast Tunneler, Phase III

    By Carl R. Peterson

    The Rapidex continuous drill and blast tunneling concept utilizes a unique spiral blasting pattern that permits efficient performance with relatively small single shots, while at the same time directi

    Jan 1, 1977

  • CIM
    Development of the Salobo Project

    By Marcio Luis S. Godoy

    The Salobo Project will be the first Vale operation to use an HPGR mill to process copper-gold ore. The mine is located in Para state, southeast of the Amazon region in Brazil. The circuit was designe

    May 1, 2010

  • SME
    Development Of The San Manuel Oxide Ore Reserve ? Present And Future

    By M. F. Vancas

    The San Manuel oxide ore reserve ranges in depth from being exposed on the surface to lying 1000 ft. beneath a conglomerate layer all of which is confined in the subsidence zone of an active sulfide b

    Jan 1, 1987

  • AUSIMM
    Development of the Sao Chico Gold Project, Brazil - ABSTRACT ONLY

    The Sao Chico gold project is located on the Tocantinzinho trend which is the most mineralised zone in the Tapajos Mineral Field of Brazil (see Figure 1). The Tapajos goldfi eld was the site of the bi

    Aug 1, 2010

  • CIM
    Development of the Science of Grinding

    By L. E. Djingheuzian

    "IntroductionDURING the past two decades an enormous amount of empirical data has been accumulating on grinding. These data have been obtained by mill operators on grinding ores with a diversity of ch

    Jan 1, 1952

  • SME
    Development Of The Screen Bowl Centrifuge For The Dewatering Of Coal Fines

    By Neil D. Policow

    Dewatering of the fine clean coal fraction, - 28 mesh (595 microns) represents one of the most difficult and costly separations in typical plant circuits. Since 1969, the Screen Bowl Centrifuge has of

    Jan 1, 1982

  • SME
    Development Of The Selective Silver Circuit At White Pine - Introduction

    By Richard H. Johnson

    White Pine Copper Company, a subsidiary of Copper Range Company located in Michigan's Upper Peninsula, mines a Precambrian sedimentary deposit containing finely disseminated chalcocite, native co

    Jan 1, 1970

  • CIM
    Development of the SII “Mission” Mineral Sands Project

    By D. Settles, R. Rose, P. L. Dunn

    "A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre

    Jan 1, 2015

  • CIM
    Development of the System for Furnace Integrity Monitoring Based on Real-Time Continuous Acoustic Emission Data Acquisition and Analysis

    By A. Saki, P. Gebski, W. Ying

    Industrial smelting furnaces are subjected to significant structural changes and deterioration caused by the conditions under which they operate. The current methods for the structural assessment of f

    Jan 1, 2011

  • SME
    Development Of The Twin Buttes Mine For Production ? Introductory - Scope of the Paper

    By J. B. Knaebel

    I have been asked to discuss the "Development of the Twin Buttes Mine for Production." This property, which is a large low-grade open pit copper mine about 25 miles south of Tucson, Arizona, was recen

    Jan 1, 1970

  • CIM
    Development of the Twin Metals Minnesota Flowsheet Incorporating the Platsol™ Process

    By G. Barr

    "The Polymetallic Twin Metals Project deposits in Northern Minnesota are being developed by Twin Metals Minnesota. Amongst the flowsheet alternatives being examined at a prefeasibility study level is

    Jan 1, 2012

  • SME
    Development Of The UOP Process For Oxide Silicate Ores Of Nickel And Cobalt

    By Y. T. Auck, M. E. Kukura, L. G. Stevens

    At its Technical Development Center in Tucson, Arizona, the UOP Mineral Sciences Division operates a completely integrated pilot plant testing a proprietary process for the extraction of nickel from l

    Jan 1, 1979

  • AUSIMM
    Development of the Use of Roaster (SO2) Gas in the Treatment Plant at Gold Mines of Kalgoorlie Limited

    By Penrose E. K

    With the exception of occasional periods, when up to 80% of oxidized ore was treated, the G.M.K. plant treated all sulphide ore until October, 1939. The treatment was, briefly, as follows:The ore was

    Jan 1, 1942

  • AUSIMM
    Development of the West Cliff Extended Project

    In the Illawarra District of New South Wales, Mines were traditionally developed from the seabord. The advantages were close access to the working faces and a minimal depth of cover. Travelling ti

    Jan 1, 1983

  • SME
    Development Of The Wiseda 220 Ton Rear Dump Hauler

    By A. E. Hunt

    Over the past twenty-live years since large scale truck haulage in open-pit mining began, the periodic introduction of Larger capacity vehicles has provided increased productivity and reduced costs.

    Jan 1, 1983