Search Documents

  • SME
    Cut And Fill Narrow Vein Mining At Hollister

    Narrow vein mining, with enough challenge and also where the cutting edge technology can be applied, is still a very important and exciting portion of the mining industry. Based on the deposit charact

    Jan 1, 2012

  • CIM
    Cut off Grade Optimizer Integrating Contaminant Constraints

    By Sebastián H. Troncoso

    Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block

    Oct 1, 2009

  • AUSIMM
    Cut-and-Break, a 'New' Method of Rock Excavation

    By Seib W

    In cut-and-break rock excavation use is made of the fact that breaking rock in tension towards a free face requires a specific energy of excavation which is small in comparison with that required for

    Jan 1, 1992

  • DFI
    Cut-and-Cover Excavation Challenges

    By Sitotaw Y. Fantaye

    "The first segment of the Second Avenue Subway extension is approaching construction completion. The new extension will operate along Second Avenue from 96th Street to 63rd Street, where it will diver

    Jan 1, 2016

  • SME
    Cut-and-Fill at Homestake Mining Co.

    By Joel K. Waterland

    GENERAL DESCRIPTION Homestake Mining Co.'s operations are at Lead, SD. Production from the various methods used are: 1 155 753 t/a (1,274,000 stpy) by open cut-and-fill, 68 039 t/a (75,000 stpy)

    Jan 1, 1982

  • SME
    Cut-and-Fill at Mount Isa Mines Ltd.

    By B. Hornsby

    At the Mount Isa mine, Mount Isa, Qld., Australia, sublevel open-stope mining is used for copper ore while both sublevel open-stope and cut-and-fill methods are used for the silver-lead-zinc ores. Pro

    Jan 1, 1982

  • SME
    Cut-and-Fill at the Bruce Mine

    By Keith E. Dyas, John Nelson, Ronald T. Johnson

    GENERAL DESCRIPTION The Bruce mine of Cyprus Mines Corp. is located in Bagdad, AZ. The mining method used is open cut-and-fill. Of the annual production of 81 647 t (90,000 st), approximately 83% i

    Jan 1, 1982

  • SME
    Cut-And-Fill Mining In Sweden: Development Trends And Applications

    By G. Almgren

    With the exception of sublevel caving, the most common method of underground mining in Sweden is the "cut-and-fill" method. It is normally used for mining non-ferrous metals , and' is used extens

    Jan 1, 1975

  • SME
    Cut-and-Fill Stoping at Star Mine

    By Gordon Miner

    GENERAL DESCRIPTION At the Star mine, Hecla Mining Co., located in Burke, Shoshone County, ID, the mining method is horizontal slicing (timbered or untimbered) cut-and-fill using hydraulic sand backf

    Jan 1, 1982

  • SAIMM
    Cut-off grade determination for the maximum value of a small Wits-type gold mining operation

    Work undertaken in the field of cut-off grade optimization has not advanced much beyond the work undertaken by Lane in 1988. His definitive work is based on the calculus of the Net Present Value crite

    Jan 1, 2003

  • AUSIMM
    Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk Quantification

    By M W. N Buxton, M T. Bootsma, J Benndorf, C Alford

    Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti

    Nov 24, 2014

  • CIM
    Cut-off grades: statistical estimation and reality

    By Michel Dagbert

    "This paper illustrates the different ways grade-tonnage curves can be generated f or a mineral deposit. It emphasizes systematic discrepancies between reality, estimates and actual production accordi

    Jan 1, 1987

  • DFI
    Cut-Off Walls For Diamond Mining In The Arctic

    By Wolfgang G. Brunner

    A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to

    Jan 1, 2003

  • SME-ICGCM
    Cutable and Variable Yield Cement Cribbing Successfully Support 84 Mine Longwall Cut Through Entries

    By William Bookshar

    The development of increasingly more sophisticated and powerful retreat longwall equipment has led to ever wider and longer panels. To maximize gateroad development efficiency, provide for effective f

    Jan 1, 1998

  • SME
    Cutoff Grade Economics - Introduction

    By R. D. Kelsey

    The theory, definition and practical application of cutoff grades have evolved over a long period. This evolution is reflected in the continuing flow of papers on this and other related matters though

    Jan 1, 1979

  • SME
    Cutoff Grade Optimization (PREPRINT NUMBER 93-247)

    By K. Dagdelen

    The definition and shortcomings of traditional cutoff grades are discussed. The concept of optimum cutoff grade policy which maximizes the Net Present Value (NPV) of annual cash flows coming from a mi

    Jan 1, 1993

  • SME
    Cutoff Grade Strategy - A Balancing Act

    By J. M. Marek

    The determination of the proper cutoff grade for an open pit metal mine is based on economic criteria and the operating philosophy of the mining company. Previous papers have dealt with the balance of

    Jan 1, 1985

  • IOM3
    Cutoff-grade decisions in relation to an Indian copper-mining complex

    By R. R. Tatiya

    The following procedure was used to determine cut-off grades: define the orebody profile; plan the stope layout and quantify the work involved; formulate equipment-performance norms; calculate unit co

    Jul 1, 1996

  • SME
    Cutter Mining – A Sustainable Technology For Mining Small Vertical Ore Bodies And Veins - SME Annual Meeting 2023

    By U. Schoepf

    Economic and at the same time environmentally acceptable mining of small vertical ore bodies and veins to great depths has always been a challenge for miners. The Bauer cutter system, widely used in c

    Feb 1, 2023

  • SME
    Cutter Rescue By Borehole - Disaster Avoided

    By John J. Peregoy, James E. Downes

    INTRODUCTION The U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) is being constructed to provide permanent storage of radioactive TRU waste materials emanating from military wea

    Jan 1, 1989